SCHEDULELocation of the regulated works
4
The routes of the cables referred to in section 1(1)(d) of this Act are to run in direct lines between any two adjacent turbines and between the electrical substation and—
a
turbines Nos. G8 and F8; or
b
turbine No. K1.