Search Legislation

Reservoirs (Scotland) Act 2011

Section 38 – Construction certificates

58.This section requires the issue of construction certificates by the construction engineer as soon as is reasonably practicable, once he or she is satisfied that the construction or alteration has been completed to a satisfactory standard. Subsection (2) requires the construction certificate to be issued before or at the same time as the final certificate. Subsection (3) requires the construction certificate to certify that the construction has been carried out effectively in accordance with the drawings and descriptions included along with the certificate, to include an annex containing detailed drawings and descriptions of the works for the construction or alteration, including the dimensions, water levels and details of the geological strata or deposits encountered in trial holes or excavations made in connection with the works and any other matters specified by the Scottish Ministers in regulations. Subsection (4) requires the construction engineer to give SEPA a copy of the report within 28 days of issuing it.

Back to top

Options/Help

Print Options

Close

Explanatory Notes

Text created by the Scottish Government to explain what the Act sets out to achieve and to make the Act accessible to readers who are not legally qualified. Explanatory Notes were introduced in 1999 and accompany all Acts of the Scottish Parliament except those which result from Budget Bills.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources