Chwilio Deddfwriaeth

The Electricity Supply Regulations 1988

 Help about what version

Pa Fersiwn

  • Y Diweddaraf sydd Ar Gael (Diwygiedig)
  • Gwreiddiol (a wnaed Fel)

Status:

Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol). This item of legislation is currently only available in its original format.

  1. Introductory Text

  2. PART I INTRODUCTORY

    1. 1.Citation and commencement

    2. 2.Application of Regulations

    3. 3.Interpretation

  3. PART II CONNECTION WITH EARTH

    1. 4.Continuity of the supply neutral conductor and earthing connections

    2. 5.General requirements for connection with earth

    3. 6.Multiple earthing

    4. 7.Protective multiple earthing

    5. 8.Earthing of metalwork

  4. PART III ELECTRIC LINES BELOW GROUND

    1. 9.General restriction

    2. 10.Protective screens

    3. 11.Excavations

  5. PART IV ELECTRIC LINES PLACED ABOVE GROUND

    1. 12.Restriction on placing electric lines above ground

    2. 13.Minimum height of overhead lines, wires and cables

    3. 14.Position, insulation and protection of electric lines

    4. 15.Precautions against access

    5. 16.Insulators in stay wires

  6. PART V SUPPLIER'S WORKS

    1. 17.Sufficiency of supplier’s works

    2. 18.Maximum voltage

    3. 19.Enclosed spaces

    4. 20.High voltage: additional provisions

    5. 21.Protective measures

    6. 22.Precautions against excess voltage

    7. 23.Precautions against supply failure

    8. 24.Inspection of supplier’s works

  7. PART VI SUPPLY TO CONSUMER'S INSTALLATIONS

    1. 25.Supplier’s works on consumer’s premises

    2. 26.Interconnected supplies

    3. 27.General conditions as to consumers

    4. 28.Discontinuance of supply in certain circumstances

    5. 29.Notices and determination of differences

    6. 30.Declaration of phases, frequency and voltage at supply terminals

    7. 31.Information to be provided on request

    8. 32.Electricity Boards to provide constant supply

  8. PART VII MISCELLANEOUS

    1. 33.Inspections, etc. for the Secretary of State

    2. 34.Notification of specified events

    3. 35.Notification of supply failure

    4. 36.Maps of supplier’s works underground

    5. 37.Exemption from requirements of Regulations

    6. 38.Works in breach of Regulations

    7. 39.Offences

  9. Signature

    1. SCHEDULE 1

      DESIGN, COLOURS AND PROPORTIONS OF THE SAFETY SIGN

      1. 1.A safety sign shall be of the design, and shall...

      2. 2.The triangle, symbol and text shall be shown in black...

      3. 3.The symbol shall not occupy more than 50% of the...

      4. 4.A safety sign may include additional text the letters of...

    2. SCHEDULE 2

      MINIMUM HEIGHT ABOVE GROUND OF OVERHEAD LINES

    3. SCHEDULE 3

      INTERCONNECTED SUPPLIES

      1. PART 1

      2. PART II

        1. 1.In this Part— “the owner” means the person who owns...

        2. 2.(1) The person concerned shall not provide energy to a...

        3. 3.The person concerned shall— (a) ensure that all persons carrying...

    4. SCHEDULE 4

      NOTICE OF SPECIFIED EVENTS

      1. PART I EVENTS SPECIFIED IN REGULATION 34(2)(a)

        1. 1.Particulars relating to the person submitting the notice

        2. 2.Date on which the notice is submitted.

        3. 3.Supplier’s reference and sequential reference number.

        4. 4.Particulars relating to the event

        5. 5.Date and time of event.

        6. 6.Supplier’s Area or District involved.

        7. 7.Persons involved in the event— (a) surname and initials;

        8. 8.Supply system details— (a) voltage; (b) type of apparatus at...

        9. 9.Brief facts of the event, including, where known, the cause....

        10. 10.Details of any action which has been or is intended...

      2. PART II EVENTS SPECIFIED IN REGULATION 34(2)(b)

        1. 1.Particulars relating to the person submitting the notice

        2. 2.Date on which the notice is submitted.

        3. 3.Supplier’s reference and sequential reference number.

        4. 4.Particulars relating to the event

        5. 5.Date of event.

        6. 6.Person involved in the event— (a) surname and initials of...

        7. 7.Inquest verdict or fatal accident inquiry findings.

        8. 8.Equipment involved in the event— (a) apparatus directly involved—

        9. 9.Supply installation details— (a) voltage; (b) earthing arrangements, whether—

        10. 10.Whether there was evidence of amateur work.

      3. PART III EVENTS SPECIFIED IN REGULATION 34(2)(c)

        1. 1.Particulars relating to the person submitting the notice

        2. 2.Date on which the notice is submitted.

        3. 3.Supplier’s reference and sequential reference number.

        4. 4.Particulars relating to the event

        5. 5.Date of event.

        6. 6.Whether the person involved in the event was—

        7. 7.Supply system details— (a) voltage; (b) type of apparatus at...

        8. 8.Brief facts of the event, including the cause and details...

        9. 9.Details of action which has been, or is intended to...

      4. PART IV EVENT SPECIFIED IN REGULATION 34(2)(d)

        1. 1.Particulars relating to the person submitting the notice

        2. 2.Date on which the notice is submitted.

        3. 3.Supplier’s reference and sequential reference number.

        4. 4.Particulars relating to the events

    5. SCHEDULE 5

      NOTICE OF SUPPLY FAILURE

      1. 1.Particulars relating to the person submitting the notice

      2. 2.Date on which the notice is submitted.

      3. 3.Particulars relating to the failure of supply

      4. 4.Duration of the interruption.

      5. 5.Approximate load affected (in megawatts).

      6. 6.Number of consumers affected approximated to the nearest 100.

      7. 7.Geographical area affected.

      8. 8.Nature and cause of the failure.

      9. 9.Nature of any deliberate damage involved.

  10. Explanatory Note

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill