Chwilio Deddfwriaeth

The Town and Country Planning (General Permitted Development) (Amendment) (England) Order 2008

 Help about what version

Pa Fersiwn

  • Y Diweddaraf sydd Ar Gael (Diwygiedig)
  • Gwreiddiol (a wnaed Fel)
 Help about opening options

Dewisiadau Agor

Status:

Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol). This item of legislation is currently only available in its original format.

Amendment of the Town and Country Planning (General Permitted Development) Order 1995

This adran has no associated Memorandwm Esboniadol

2.—(1) The Town and Country Planning (General Permitted Development) Order 1995(1) shall be amended in accordance with paragraphs (2) and (3).

(2) In article 1(2) (interpretation) in paragraph (a) of the definition of “building”, for “25 and 33” substitute “25, 33 and 40”.

(3) In Schedule 2 after Part 39 (temporary protection of poultry and other captive birds) add—

PART 40INSTALLATION OF DOMESTIC MICROGENERATION EQUIPMENT

Class A

Permitted development

A.  The installation, alteration or replacement of solar PV or solar thermal equipment on—

(a)a dwellinghouse; or

(b)a building situated within the curtilage of a dwellinghouse.

Development not permitted

A.1.  Development is not permitted by Class A, in the case of solar PV or solar thermal equipment installed on an existing wall or roof of a dwellinghouse or a building within its curtilage if—

(a)the solar PV or solar thermal equipment would protrude more than 200 millimetres beyond the plane of the wall or the roof slope when measured from the perpendicular with the external surface of the wall or roof slope;

(b)it would result in the highest part of the solar PV or solar thermal equipment being higher than the highest part of the roof (excluding any chimney);

(c)in the case of land within a conservation area or which is a World Heritage Site, the solar PV or solar thermal equipment would be installed—

(i)on a wall or roof slope forming the principal or side elevation of the dwellinghouse and would be visible from a highway; or

(ii)on a wall or roof slope of a building within the curtilage of the dwellinghouse and would be visible from a highway; or

(d)the solar PV or solar thermal equipment would be installed on a building within the curtilage of the dwellinghouse if the dwellinghouse is a listed building.

Conditions

A.2.  Development is permitted by Class A subject to the following conditions—

(a)solar PV or solar thermal equipment installed on a building shall, so far as practicable, be sited so as to minimise its effect on the external appearance of the building;

(b)solar PV or solar thermal equipment shall, so far as practicable, be sited so as to minimise its effect on the amenity of the area; and

(c)solar PV or solar thermal equipment no longer needed for microgeneration shall be removed as soon as reasonably practicable.

Class B

Permitted development

B.  The installation, alteration or replacement of stand alone solar within the curtilage of a dwellinghouse.

Development not permitted

B.1.  Development is not permitted by Class B if—

(a)it would result in the presence within the curtilage of more than one stand alone solar; or

(b)any part of the stand alone solar—

(i)would exceed four metres in height above ground level;

(ii)would, in the case of land within a conservation area or which is a World Heritage Site, be situated within any part of the curtilage of the dwellinghouse and would be visible from the highway;

(iii)would be situated within five metres of the boundary of the curtilage;

(iv)would be situated within the curtilage of a listed building; or

(c)the surface area of the solar panels forming part of the stand alone solar would exceed nine square metres or any dimension of its array (including any housing) would exceed three metres.

Conditions

B.2.  Development is permitted by Class B subject to the following conditions—

(a)stand alone solar shall, so far as practicable, be sited so as to minimise its effect on the amenity of the area; and

(b)stand alone solar which is no longer needed for microgeneration shall be removed as soon as reasonably practicable.

Class C

Permitted development

C.  The installation, alteration or replacement of a ground source heat pump within the curtilage of a dwellinghouse.

Class D

Permitted development

D.  The installation, alteration or replacement of a water source heat pump within the curtilage of a dwellinghouse.

Class E

Permitted development

E.  The installation, alteration or replacement of a flue, forming part of a biomass heating system, on a dwellinghouse.

Development not permitted

E.1.  Development is not permitted by Class E if—

(a)the height of the flue would exceed the highest part of the roof by one metre or more;

(b)in the case of land within a conservation area or which is a World Heritage Site, the flue would be installed on a wall or roof slope forming the principal or side elevation of the dwellinghouse and would be visible from a highway.

Class F

Permitted development

F.  The installation, alteration or replacement of a flue, forming part of a combined heat and power system, on a dwellinghouse.

Development not permitted.

F.1.  Development is not permitted by Class F if—

(a)the height of the flue would exceed the highest part of the roof by one metre or more;

(b)in the case of land within a conservation area or which is a World Heritage Site, the flue would be installed on a wall or roof slope forming the principal or side elevation of the dwellinghouse and would be visible from a highway.

Interpretation of Part 40

G.1  For the purposes of Part 40—

“dwellinghouse” includes a building which consists wholly of flats or which is used for the purposes of a dwellinghouse;

“microgeneration” has the same meaning as in section 82(6) of the Energy Act 2004(2);

“solar PV” means solar photovoltaics;

“stand alone solar” means solar PV or solar thermal equipment which is not installed on a building;

“World Heritage Site” means a property appearing on the World Heritage List kept under article 11(2) of the 1972 UNESCO Convention for the Protection of the World Cultural and Natural Heritage.

(1)

S.I. 1995/418. Relevant amendments were made by S.I. 2007/406.

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Memorandwm Esboniadol

Mae Memoranda Esboniadol yn nodi datganiad byr o ddiben Offeryn Statudol ac yn rhoi gwybodaeth am ei amcan polisi a goblygiadau polisi. Maent yn ceisio gwneud yr Offeryn Statudol yn hygyrch i ddarllenwyr nad oes ganddynt gymhwyster cyfreithiol, ac maent yn cyd-fynd ag unrhyw Offeryn Statudol neu Offeryn Statudol Drafft a gyflwynwyd ger bron y Senedd o Fehefin 2004 ymlaen.

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill