Chwilio Deddfwriaeth

The Network Rail (Cambridge South Infrastructure Enhancements) Order 2022

 Help about what version

Pa Fersiwn

  • Y Diweddaraf sydd Ar Gael (Diwygiedig)
  • Gwreiddiol (a wnaed Fel)

Status:

Dyma’r fersiwn wreiddiol (fel y’i gwnaed yn wreiddiol). This item of legislation is currently only available in its original format.

Article 2(1)

SCHEDULE 1SCHEDULED WORKS

In the County of Cambridgeshire, City of Cambridgeshire and District of South Cambridgeshire

In the County of Cambridgeshire, City of Cambridge—

Work No. 1 – A railway (Down Cambridge Loop Line) (580 metres in length) on the western side of the course of the existing railway (Bethnal Green to King’s Lynn line) commencing 20 metres north of Long Road (A1134) overbridge and terminating at Work No.3.

Work No. 2 – A railway (Up Cambridge Loop Line) (586 metres in length) on the eastern side of the course of the existing railway (Bethnal Green to King’s Lynn line) commencing 20 metres north of Long Road (A1134) overbridge and terminating at Work No.3.

Work No. 3 – A new station (Cambridge South) located directly south of the (Guided Busway) overbridge consisting four new platforms and associated railway lines, a station footbridge with stairs and lifts, high level concourse, eastern and western entrance buildings with ticketing and staffing facilities and associated forecourt areas and a secondary means of escape footbridge.

Work No. 4 – A new path (pedestrian and cycling) (378 metres in length) commencing at the Guided Busway route on the west side of Hobson’s Park and terminating at Work No. 3.

Work No. 5 – A new pedestrian path (96 metres in length) including an at grade crossing over the Guided Busway commencing at Work No.4 in Hobson’s Park and terminating 96 metres on the north of its commencement on the north of the Guided Busway route within the Active Recreation Area.

Work No. 6 – A railway (Down Cambridge Loop Line) (448 metres in length) on the western side of the course of the existing railway (Bethnal Green to King’s Lynn line) commencing at Work No.3 and terminating 110 metres south of Addenbrookes Road (Nine Wells) overbridge, railway systems compound, drainage works and features.

Work No. 7 – A railway (Up Cambridge Loop Line) (447 metres in length) on the eastern side of the course of the existing railway (Bethnal Green to King’s Lynn line) commencing at Work No.3 and terminating 108 metres south of Addenbrookes Road (Nine Wells) overbridge.

In the County of Cambridgeshire, District of South Cambridgeshire, Parish of Great Shelford—

Work No. 8 – Realignment of the railway (Down Shepreth Branch Line) (1036 metres in length) on the western side of the existing railway commencing 775 metres south of Addenbrookes Road (Nine Wells) overbridge and terminating 25 metres east of Cambridge Road overbridge, works include the relocation of the existing telecommunications mast and associated equipment and the installation of a new equipment building.

Work No. 9 – A crossover (138 metres in length) between the Up and Down railway lines of the existing railway (Bethnal Green to King’s Lynn line) commencing 35 metres south of Dukes No.2 Level Crossing and terminating 138 metres south of its commencement.

Work No. 10 – Realignment of the railway (Up Shepreth Branch Line) (502 metres in length) on the eastern side of the existing railway commencing 200 metres north of Webster Level Crossing and terminating 25 metres east of Cambridge Road overbridge.

In the County of Cambridgeshire, City of Cambridge and District of South Cambridgeshire, Parish of Great Shelford—

Work No. 11 – Agricultural accommodation bridge over the Hobson’s Brook 420m west of the railway, commencing at a point 25 metres south of Addenbrookes Road and terminating at a point 82 metres south of its commencement.

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill