Article 26
(1) | (2) | (3) |
---|---|---|
Plot reference number shown on land plans | Purpose for which rights over land may be acquired | Relevant part of the authorised development |
Land Plans – Sheet 1 | ||
1/3a | Required for the establishment and maintenance of environmental mitigation and enhancement areas | Work No. 8 |
1/3b | Required for the establishment and maintenance of environmental mitigation and enhancement areas and the diversion and maintenance of and access to utilities and the establishment and maintenance of flood storage areas | Work No. 1, 8 and 9 |
1/4b | Required for the establishment of environmental mitigation and enhancement and the diversion and maintenance of and access to utilities | Work No. 8 and 9 |
Land Plans – Sheet 2 | ||
2/1b | Required for the diversion and maintenance of and access to utilities and the establishment and maintenance of environmental mitigation and enhancement | Work No. 8 and 9 |
2/1c | Required for the construction of a diverge slip road and for the establishment of environmental mitigation and enhancement areas and the construction of highway drainage attenuation | Work No. 2 and 8 |
2/1f | Required for the construction of a cycle track and the diversion and maintenance of and access to utilities | Work No. 3 and 9 |
2/1o | Required for the construction and reconfiguration of the junction between Lyttelton Street and Kingsway Park Close and the diversion and maintenance and access to utilities | Work No. 7 and 9 |
2/1p | Required for the construction and reconfiguration of the junction between Lyttelton Street and Kingsway Park Close and the diversion and maintenance and access to utilities | Work No. 7 and 9 |
2/7a and 2/8 | Required for the diversion construction and maintenance of a cycle track | Work No. 3 |
2/9 | Required for the construction and maintenance of a cycle track and the diversion and maintenance of and access to utilities | Work No. 3 and 9 |
2/13a | Required to construct a link road and the diversion and maintenance and access to utilities | Work No. 7 and 9 |
2/19a | Required to construct a link road and the diversion and maintenance of and access to utilities and the construction of footways | Work No. 7 and 9 |
2/19b | Required to construct a link road and the diversion and maintenance of and access to utilities and the reconfiguration of Lyttelton junction | Work No. 7 and 9 |
Land Plans – Sheet 3 | ||
3/1p and 3/1q | Required for the construction of a northbound diverge slip road and the diversion and maintenance of and access to utilities and the stopping up of the Enfield Road entry and exit roads | Work No. 11 and 22 |
3/1w and 3/1x | Required for the diversion and maintenance of and access to a utility corridor and construction of a new emergency access | Work No. 16 and 21 |
3/5a | Required for the alteration, realignment and grading of highway; the construction, improvement and realignment of cycle track and the diversion and maintenance of and access to utilities | Work No. 10, 15 and 22 |
3/9b | Required for alterations to the access to and egress from the filling station and fast-food site and the diversion and maintenance of utilities | Work No. 16 and 22 |
3/16a, 3/17 and 3/19 | Required for the construction and alteration of a private means of access | Work No. 16 |
3/22b | Required for the construction of a southbound diverge slip and alteration realignment and grading of highway and the construction and maintenance of a noise barrier and alterations to the access to and egress from the A52 to the Royal School for the Deaf | Work No. 13 and 16 |
Land Plans – Sheet 4 | ||
4/1b | Required for the diversion and maintenance of and access to a utility corridor and for the demolition of a footbridge and replacement of a footbridge | Work No. 10 and 21 |
4/1d | Required for the alteration, realignment and grading of a highway | Work No. 10, 21 and 22 |
4/7b | Required for the construction and maintenance of a noise barrier | Work No. 13 |
Land Plans – Sheet 6 | ||
6/2 | Required for the construction and maintenance of a flood plain compensation area and the diversion and maintenance of and access to utilities | Work No. 31 |
Land Plans – Sheet 7 | ||
7/5 | Required for the construction and maintenance of a flood plain compensation area and the diversion and maintenance of and access to utilities | Work No. 31 |
Land Plans – Sheet 8 | ||
8/6 | Required for the access construction and maintenance of a railbridge | Work No. 23 |
8/23b, 8/25c and 8/21 | Required for the diversion and maintenance of and access to utilities | Work No. 35 |
Land Plans – Sheet 9 | ||
9/6b | Required for the alteration, realignment and grading of northbound and southbound carriageways, the construction of a southbound diverge slip road and the diversion and maintenance of and access to utilities | Work No. 23, 26 and 35 |
Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.
Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.
Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:
Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:
liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys