F1ANNEX XCONFORMITY OF PRODUCTION PROCEDURES

Annotations:

3.CONTINUED VERIFICATION ARRANGEMENTS

3.2.

At every review, records of tests or checks and records of production shall be made available to the inspector; in particular, records of those tests or checks documented as required by point 2.2 of this Annex.