ANNEX IGUIDELINES ON

2.Principles of capacity-allocation mechanisms and congestion-management procedures concerning transmission system operators and their application in the event of contractual congestion

F12.2.Congestion management procedures in the event of contractual congestion

2.2.2.Capacity increase through oversubscription and buy-back scheme

2.

The oversubscription and buy-back scheme shall provide transmission system operators with an incentive to make available additional capacity, taking account of the technical conditions, such as the calorific value, temperature and expected consumption, of the relevant entry-exit system and the capacities in adjacent networks. Transmission system operators shall apply a dynamic approach with regard to the recalculation of the technical or additional capacity of the entry-exit system.