Regulations 7(1) and 9(5)

SCHEDULE 3N.I.PARTICULARS TO BE INCLUDED IN A SAFETY CASE FOR THE OPERATION OF A PRODUCTION INSTALLATION

1.  The name and address of the operator of the installation.N.I.

Commencement Information

I1Sch. 3 para. 1 in operation at 21.5.2007, see reg. 1

2.  A description of the extent to which the duty holder has taken into account any matters raised by the Executive pursuant to regulations 6(1) and (4)(a) and 9(1) and (4).N.I.

Commencement Information

I2Sch. 3 para. 2 in operation at 21.5.2007, see reg. 1

3.  A summary of how any safety representatives for that installation were consulted with regard to the revision, review or preparation of the safety case pursuant to regulation 23(2)(c)(i) of the Offshore Installations (Safety Representatives and Safety Committees) Regulations 1989(1).N.I.

Commencement Information

I3Sch. 3 para. 3 in operation at 21.5.2007, see reg. 1

4.  A description, with suitable diagrams, of—N.I.

(a)the main and secondary structure of the installation and its materials;

(b)its plant;

(c)the layout and configuration of its plant;

(d)the connections to any pipeline or installation; and

(e)any wells connected or to be connected to the installation.

Commencement Information

I4Sch. 3 para. 4 in operation at 21.5.2007, see reg. 1

5.  A suitable plan of the location of the installation and of anything connected to it, and particulars of—N.I.

(a)the meteorological and oceanographic conditions to which the installation may foreseeably be subjected; and

(b)the properties of the [F1bed of internal waters] and subsoil at its location.

6.  Particulars of the types of operation, and activities in connection with an operation, which the installation is capable of performing.N.I.

Commencement Information

I6Sch. 3 para. 6 in operation at 21.5.2007, see reg. 1

7.  The maximum number of persons—N.I.

(a)expected to be on the installation at any time; and

(b)for whom accommodation is to be provided.

Commencement Information

I7Sch. 3 para. 7 in operation at 21.5.2007, see reg. 1

8.  Particulars of the plant and arrangements for the control of well operations, including those—N.I.

(a)to control pressure in a well;

(b)to prevent the uncontrolled release of hazardous substances; and

(c)to minimise the effects of damage to subsea equipment by drilling equipment.

Commencement Information

I8Sch. 3 para. 8 in operation at 21.5.2007, see reg. 1

9.  A description of any pipeline with the potential to cause a major accident, including—N.I.

(a)the fluid which it conveys;

(b)its dimensions and layout;

(c)its contained volume at declared maximum allowable operating pressure; and

(d)any apparatus and works intended to secure safety,

together with a summary of the document prepared under regulation 23 of the Pipelines Safety Regulations (Northern Ireland) 1997(2).

Commencement Information

I9Sch. 3 para. 9 in operation at 21.5.2007, see reg. 1

10.  A description of how the duty holder has ensured, or will ensure, compliance with regulation 4(1) of the PFEER Regulations.N.I.

Commencement Information

I10Sch. 3 para. 10 in operation at 21.5.2007, see reg. 1

11.  A description of arrangements made for protecting persons on the installation from toxic gas at all times other than during any period while they may need to remain on the installation following an incident which is beyond immediate control.N.I.

Commencement Information

I11Sch. 3 para. 11 in operation at 21.5.2007, see reg. 1

12.  A description of the measures taken or to be taken or the arrangements made or to be made for the protection of persons on the installation from hazards of explosion, fire, heat, smoke, toxic gas or fumes during any period while they may need to remain on the installation following an incident which is beyond immediate control and for enabling such persons to be evacuated from the installation where necessary, including provision for—N.I.

(a)temporary refuge;

(b)routes from locations where persons may be present to temporary refuge and for egress therefrom to points from where the installation may be evacuated;

(c)means of evacuation at those points; and

(d)facilities within temporary refuge for the monitoring and control of the incident and for organising evacuation.

Commencement Information

I12Sch. 3 para. 12 in operation at 21.5.2007, see reg. 1

13.  A description of the main requirements in the specification for the design of the installation and its plant, which shall include—N.I.

(a)any limits for safe operation or use specified therein;

(b)a description of how the duty holder has ensured, or will ensure, compliance with regulation 4 of the Offshore Installations and Wells (Design and Construction, etc.) Regulations (Northern Ireland) 1996;

(c)a description of how the duty holder has ensured, or will ensure, the suitability of the safety-critical elements; and

(d)a description of how the duty holder—

(i)where he is also the operator in relation to a pipeline, has ensured, or will ensure, compliance with regulation 11 of the Pipelines Safety Regulations (Northern Ireland) 1997; or

(ii)where he is not also the operator in relation to a pipeline, has co-operated or will co-operate with the operator in relation to a pipeline to ensure compliance with regulation 11 of the Pipelines Safety Regulations (Northern Ireland) 1997.

Commencement Information

I13Sch. 3 para. 13 in operation at 21.5.2007, see reg. 1

14.  Particulars of any combined operations which may involve the installation, including—N.I.

(a)a summary of the arrangements in place for co-ordinating the management systems of all duty holders involved in any such combined operation;

(b)a summary of the arrangements in place for a joint review of the safety aspects of any such combined operation by all duty holders involved, which shall include the identification of hazards with the potential to cause a major accident and the assessment of risks which may arise during any such combined operation;

(c)the plant likely to be used during any such combined operation; and

(d)the likely impact any such combined operation may have on the installations involved.

Commencement Information

I14Sch. 3 para. 14 in operation at 21.5.2007, see reg. 1

(2)

S.R. 1997 No. 193, to which there are amendments not relevant to these Regulations