xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"

SCHEDULE 7N.I.PARTICULARS TO BE INCLUDED IN A SAFETY CASE FOR THE OPERATION OF A PRODUCTION INSTALLATION

11.  A description, with suitable diagrams, of the installation, including a description of—N.I.

(a)the main and secondary structure of the installation and its materials;

(b)its plant;

(c)the layout and configuration of its plant;

(d)any connections to any pipeline or other installation; and

(e)any well connected or to be connected to the installation.

Commencement Information

I1Sch. 7 para. 11 in operation at 19.12.2016, see reg. 1