Power to carry out works

5.—(1) Subject to the provisions of this Order, the Council may, in the situations and lines and within the limits of deviation and according to the levels shown on the deposited plans and sections, carry out and maintain the following works in the island of Eigg, Highland, and on the foreshore and bed of the sea adjacent thereto together with all necessary and proper works and conveniences connected therewith or incidental thereto–

  • Work No. 1: A slipway of solid construction 15 metres wide and associated slipway head area commencing at a point NM 148673 784075 and extending in a north-easterly direction for a distance of 101 metres to a point NM 148769 784107 and there terminating;

  • Work No. 2: Dredging an area of sea bed of maximum width 190 metres commencing at a point NM 148449 783967 and extending in a north-easterly direction for a distance of 613 metres to terminate at a point NM 148982 784270 as shown hatched on the deposited plan;

  • Work No. 3: An alignment structure of solid construction commencing from the south-south-east side of Work No. 1 at a point NM 148719 784080 and extending in a north-easterly direction for a distance of 89 metres to terminate at a point NM 148803 784108;

  • Work No. 4: A causeway with associated 3 metres wide approach road of solid construction commencing at a point NM 148421 783828 and extending in an arc in a north-easterly direction for a distance of 353 metres to the commencement point of Work No. 1;

  • Work No. 5: Refurbishment and improvement of existing pier and slipway of solid construction commencing at a point NM 148466 783808 and extending in a south-easterly direction for a distance of 82 metres to terminate at a point NM 148543 783779;

  • Work No. 6: A floating pontoon with associated access walkway commencing at a point NM 148504 784004 and extending in a north-easterly direction for a distance of 50 metres to terminate at a point NM 148541 784038.

(2) The Council may, within the limits of deviation, maintain, renew, reconstruct and alter temporarily or permanently the works.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources