Part I Construction of New Bridge over River Thames

1 Construction of the scheduled works.

1

The Secretary of State may, subject to and in accordance with the provisions of this Act, construct the works specified in Part I of Schedule 1 to this Act (below in this Act referred to as the scheduled works), being works for the construction of a new bridge over the river Thames between the borough of Dartford, in the county of Kent, and the borough of Thurrock, in the county of Essex, and certain associated works.

2

References below in this Act to the bridge are references to the bridge mentioned in subsection (1) above (Work No.3).

3

Subject to Part II of that Schedule (which gives the limits of deviation for the scheduled works, permits deviation from the levels shown on the deposited sections and specifies requirements as to the construction of the bridge) the scheduled works shall be constructed in the lines or situations shown on the deposited plans and in accordance with the levels shown on the deposited sections.