Part IIndependent Television Services

Chapter IITelevision Broadcasting on Channels 3, 4 and 5

Channel 5

30Initial Channel 5 licensee required to retune equipment susceptible to interference

1

A Channel 5 licence which is in force at the commencement of the provision of Channel 5 shall include conditions—

a

requiring the holder of the licence to make arrangements for any relevant equipment to be retuned or otherwise modified—

i

at the request of the person by whom the equipment is kept (being a request made before such date as is specified in the conditions), and

ii

without charge to that person,

so far as is necessary to prevent the equipment from suffering interference caused by the transmission of Channel 5;

b

requiring all work falling to be carried out under the arrangements—

i

to be carried out in a proper manner, and

ii

to be completed within such period as is specified in the conditions; and

c

enabling the Commission to determine whether work carried out under the arrangements is carried out in a proper manner.

2

Any such Channel 5 licence shall also include conditions requiring the holder of the licence to publicise, in such manner as may be approved by the Commission, information with respect to—

a

the likelihood of different kinds of equipment suffering interference caused by the transmission of Channel 5;

b

the arrangements which the holder of the licence is required to make by virtue of conditions imposed in pursuance of subsection (1); and

c

the kinds of equipment in relation to which those arrangements are to be so made.

3

The holder of a Channel 5 licence shall not be required, by virtue of conditions imposed in pursuance of subsection (1), to make any such arrangements as are mentioned in that subsection in relation to any relevant equipment—

a

unless the equipment—

i

is, on the date of the making of such a request as is referred to in paragraph (a)(i) of that subsection, kept by the person in question wholly or mainly for domestic purposes, and

ii

was so kept by that person on the commencement date (if that date occurred before the date mentioned in sub-paragraph (i) above); or

b

if the equipment would not be liable to suffer interference caused by the transmission of Channel 5 but for the installation at the place where the equipment is kept of any apparatus for enabling that service to be received there;

and, where any relevant equipment has been retuned or otherwise modified in accordance with any such conditions, the holder of such a licence shall not be required by virtue of any such conditions to make arrangements on any subsequent occasion for the retuning or other modification of that equipment.

4

Any dispute as to when the commencement date occurred in the case of any relevant equipment shall be determined by the Commission.

5

Where—

a

in accordance with section 28(3), more than one Channel 5 licence is in force at the same time, and

b

each of the licences includes such conditions as are mentioned in subsections (1) and (2),

the holders of the licences shall each comply with those conditions to such extent as the Commission may determine in relation to him.

6

Where the holder of a Channel 5 licence is required, by virtue of conditions imposed in pursuance of subsection (1), to make any such arrangements as are mentioned in that subsection in relation to any relevant equipment, those conditions shall be taken as requiring him in addition to make arrangements for any television set connected to that equipment to be retuned—

a

at the request of the person by whom the equipment is kept, and

b

without charge to that person,

so far as is necessary to enable it to be used in conjunction with the equipment (as retuned or otherwise modified); and subsections (1)(b) and (c) and (2)(b) shall have effect in relation to those arrangements as they have effect in relation to any such arrangements as are mentioned in subsection (1)(a).

7

In this section—

  • “the commencement date”, in relation to any relevant equipment, means the date when Channel 5 began to be provided for reception in an area which includes the place where the equipment is kept on the date of the making of such a request as is referred to in subsection (1)(a)(i); and

  • “relevant equipment” means any equipment which is capable of transmitting self-generated electromagnetic signals for reception by a television set connected to it and which is liable, if used without being retuned or otherwise modified, to suffer interference caused by the transmission of Channel 5.