Search Legislation

Energy Act 2004

 Help about what version

What Version

 Help about advanced features

Advanced Features

Changes to legislation:

Energy Act 2004, SCHEDULE 21 is up to date with all changes known to be in force on or before 19 March 2024. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.

View outstanding changes

Changes and effects yet to be applied to the whole Act associated Parts and Chapters:

Whole provisions yet to be inserted into this Act (including any effects on those provisions):

Section 159.

SCHEDULE 21E+W+SEnergy transfer schemes

This schedule has no associated Explanatory Notes

Modifications etc. (not altering text)

C1Sch. 21 modified (1.10.2005) by Energy Administration Rules 2005 (S.I. 2005/2483), rules 1, 184 (with rules 3, 187)

C2Sch. 21 applied (with modifications) (18.12.2011) by Energy Act 2011 (c. 16), ss. 96(1)-(4), 121(3)

C4Sch. 21 applied (with modifications) (23.7.2018) by Smart Meters Act 2018 (c. 14), ss. 4(1)-(4), 14(5)

C6Sch. 21 applied (with modifications) (31.3.2022 for specified purposes, 1.6.2022 in so far as not already in force) by Nuclear Energy (Financing) Act 2022 (c. 15), ss. 33(1)-(5), 44(1)(c)(2)(c)

C7Sch. 21 power to apply (with modifications) conferred (26.10.2023) by Energy Act 2023 (c. 52), s. 334(2)(l), Sch. 18 para. 50

C8Sch. 21 applied (with modifications) (26.12.2023) by Energy Act 2023 (c. 52), ss. 44, 334(3)(a)

Application of Schedule E+W+S

1E+W+SThis Schedule applies where—

(a)the court has made an energy administration order in relation to a company (the “old energy company”); and

(b)it is proposed that a transfer falling within section 155(3) be made to another company (the “new energy company”).

Commencement Information

I1Sch. 21 para. 1 in force at 5.10.2004 by S.I. 2004/2575, art. 2(1), Sch. 1

2E+W+SIt is for the energy administrator, while the energy administration order is in force, to act on behalf of the old energy company in the doing of anything that it is authorised or required to do by or under this Schedule.

Commencement Information

I2Sch. 21 para. 2 in force at 5.10.2004 by S.I. 2004/2575, art. 2(1), Sch. 1

Making of energy transfer schemesE+W+S

3(1)The old energy company may—E+W+S

(a)with the consent of the new energy company, and

(b)for the purpose of giving effect to the proposed transfer,

make a scheme under this Schedule for the transfer of property, rights and liabilities from the old energy company to the new energy company (an “energy transfer scheme”).

(2)Such a scheme may be made only at a time when the energy administration order is in force in relation to the old energy company.

(3)An energy transfer scheme may set out the property, rights and liabilities to be transferred in one or more of the following ways—

(a)by specifying or describing them in particular;

(b)by identifying them generally by reference to, or to a specified part of, the undertaking of the old energy company; or

(c)by specifying the manner in which they are to be determined.

(4)An energy transfer scheme shall take effect in accordance with paragraph 8 at the time appointed by the court.

(5)But the court must not appoint a time for a scheme to take effect unless that scheme has been approved by the Secretary of State.

(6)The Secretary of State may modify an energy transfer scheme before approving it, but only modifications to which both the old energy company and the new energy company have consented may be made.

(7)In deciding whether to approve an energy transfer scheme, the Secretary of State must have regard, in particular, to—

(a)the public interest; and

(b)the effect the scheme is likely to have (if any) upon the interests of third parties.

(8)Before approving an energy transfer scheme, the Secretary of State must consult GEMA.

(9)The old energy company and the new energy company each have a duty to provide the Secretary of State with all information and other assistance that he may reasonably require for the purposes of, or in connection with, the exercise of the powers conferred on him by this paragraph.

Commencement Information

I3Sch. 21 para. 3 in force at 5.10.2004 by S.I. 2004/2575, art. 2(1), Sch. 1

Provision that may be made by a schemeE+W+S

4(1)An energy transfer scheme may contain provision—E+W+S

(a)for the creation, in favour of the old energy company or the new energy company, of an interest or right in or in relation to property transferred in accordance with the scheme;

(b)for giving effect to a transfer to the new energy company by the creation, in favour of that company, of an interest or right in or in relation to property retained by the old energy company;

(c)for the creation of new rights and liabilities (including rights of indemnity and duties to indemnify) as between the old energy company and the new energy company;

(d)in connection with any provision made under this sub-paragraph, provision making incidental provision as to the interests, rights and liabilities of other persons with respect to the property, rights and liabilities to which the scheme relates.

(2)The property, rights and liabilities of the old energy company that may be transferred in accordance with an energy transfer scheme include—

(a)property, rights and liabilities that would not otherwise be capable of being transferred or assigned by the old energy company;

(b)property acquired, and rights and liabilities arising, in the period after the making of the scheme but before it takes effect;

(c)rights and liabilities arising after it takes effect in respect of matters occurring before it takes effect;

(d)property situated anywhere in Great Britain or elsewhere;

(e)rights and liabilities under the law of a part of Great Britain or of a place outside Great Britain;

(f)rights and liabilities under an enactmentF1... or subordinate legislation.

(3)The transfers to which effect may be given by an energy transfer scheme include transfers of interests and rights that are to take effect in accordance with the scheme as if there were—

(a)no such requirement to obtain a person’s consent or concurrence,

(b)no such liability in respect of a contravention of any other requirement, and

(c)no such interference with any interest or right,

as there would be, in the case of a transaction apart from this Act, by reason of a provision falling within sub-paragraph (4).

(4)A provision falls within this sub-paragraph to the extent that it has effect (whether under an enactment or agreement or otherwise) in relation to the terms on which the old energy company is entitled, or subject, to anything to which the transfer relates.

(5)Sub-paragraph (6) applies where (apart from that sub-paragraph) a person would be entitled, in consequence of anything done or likely to be done by or under this Act in connection with an energy transfer scheme—

(a)to terminate, modify, acquire or claim an interest or right; or

(b)to treat an interest or right as modified or terminated.

(6)That entitlement—

(a)shall not be enforceable in relation to that interest or right until after the transfer of the interest or right by the scheme; and

(b)shall then be enforceable in relation to the interest or right only in so far as the scheme contains provision for the interest or right to be transferred subject to whatever confers that entitlement.

(7)Sub-paragraphs (3) to (6) have effect where shares in a subsidiary of the old energy company are transferred—

(a)as if the reference in sub-paragraph (4) to the terms on which the old energy company is entitled or subject to anything to which the transfer relates included a reference to the terms on which the subsidiary is entitled or subject to anything immediately before the transfer takes effect; and

(b)in relation to an interest or right of the subsidiary, as if the references in sub-paragraph (6) to the transfer of the interest or right included a reference to the transfer of the shares.

(8)Sub-paragraphs (3) and (4) apply to the creation of an interest or right by an energy transfer scheme as they apply to the transfer of an interest or right.

Textual Amendments

Commencement Information

I4Sch. 21 para. 4 in force at 5.10.2004 by S.I. 2004/2575, art. 2(1), Sch. 1

Transfer of licencesE+W+S

5(1)The provision that may be made by an energy transfer scheme includes the transfer of a relevant licence from the old energy company to the new energy company.E+W+S

(2)Such a transfer may relate to the whole or any part of the licence.

(3)Where such a transfer relates to a part of the licence, the provision made under sub-paragraph (1) may include—

(a)provision apportioning responsibility between the old energy company and the new energy company in relation to—

(i)the making of payments required by conditions included in the licence;

(ii)ensuring compliance with any other requirements of the conditions included in the licence; and

(b)provision making incidental modifications to the terms and conditions of the licence.

(4)References in this paragraph to a part of a licence are references to one or both of—

(a)a part of the activities authorised by the licence;

(b)a part of the area in relation to which the holder of the licence is authorised to carry on those activities.

Commencement Information

I5Sch. 21 para. 5 in force at 5.10.2004 by S.I. 2004/2575, art. 2(1), Sch. 1

Powers and duties under statutory provisionsE+W+S

6(1)The provision that may be made by an energy transfer scheme includes provision for some or all of the powers and duties to which this paragraph applies—E+W+S

(a)to be transferred to the new energy company; or

(b)to become powers and duties that are exercisable, or must be performed, concurrently by the old energy company and the new energy company.

(2)Provision falling within sub-paragraph (1) may apply to powers and duties only in so far as they are exercisable or required to be performed in the area specified or described in the provision.

(3)The powers and duties to which this paragraph applies are the powers and duties conferred or imposed upon the old energy company by or under an enactment, so far as those powers and duties are connected with—

(a)the undertaking of the old energy company to the extent the energy transfer scheme relates to that undertaking; or

(b)any property, rights or liabilities to be transferred in accordance with the scheme.

(4)The powers and duties mentioned in sub-paragraph (3) include, in particular, powers and duties relating to the carrying out of works or the acquisition of land.

Commencement Information

I6Sch. 21 para. 6 in force at 5.10.2004 by S.I. 2004/2575, art. 2(1), Sch. 1

Supplemental provisions relating to transfersE+W+S

7(1)An energy transfer scheme may make incidental, supplemental, consequential and transitional provision in connection with the other provisions of the scheme.E+W+S

(2)Such provision may include different provision for different cases or different purposes.

(3)In particular, an energy transfer scheme may make provision, in relation to a provision of the scheme—

(a)for the new energy company to be treated as the same person in law as the old energy company;

(b)for agreements made, transactions effected or other things done by or in relation to the old energy company to be treated, so far as may be necessary for the purposes of or in connection with a transfer in accordance with the scheme, as made, effected or done by or in relation to the new energy company;

(c)for references in an agreement, instrument or other document to the old energy company or to an employee or office holder with the old energy company to have effect, so far as may be necessary for the purposes of or in connection with a transfer in accordance with the scheme, with such modifications as are specified in the scheme;

(d)that the effect of any transfer in accordance with the scheme in relation to contracts of employment with the old energy company is not to terminate any of those contracts but is to be that periods of employment with that company are to count for all purposes as periods of employment with the new energy company;

(e)for proceedings commenced by or against the old energy company to be continued by or against the new energy company.

(4)Sub-paragraph (3)(c) does not apply to references in an enactment or in subordinate legislation.

(5)An energy transfer scheme may make provision for disputes as to the effect of the scheme between the old energy company and the new energy company to be referred to such arbitration as may be specified in or determined under the scheme.

(6)Where a person is entitled, in consequence of an energy transfer scheme, to possession of a document relating in part to the title to land or other property in England and Wales, or to the management of such land or other property—

(a)the scheme may provide for that person to be treated as having given another person an acknowledgement in writing of the right of that other person to production of the document and to delivery of copies of it; and

(b)section 64 of the Law of Property Act 1925 (c. 20) (production and safe custody of documents) shall have effect accordingly, and on the basis that the acknowledgement did not contain an expression of contrary intention.

(7)Where a person is entitled, in consequence of an energy transfer scheme, to possession of a document relating in part to the title to land or other property in Scotland or to the management of such land or other property, subsections (1) and (2) of section 16 of the Land Registration (Scotland) Act 1979 (c. 33) (omission of certain clauses in deeds) shall have effect in relation to the transfer—

(a)as if the transfer had been effected by deed; and

(b)as if the words “unless specially qualified” were omitted from each of those subsections.

(8)In this paragraph references to a transfer in accordance with an energy transfer scheme include references to the creation in accordance with such a scheme of an interest, right or liability.

Commencement Information

I7Sch. 21 para. 7 in force at 5.10.2004 by S.I. 2004/2575, art. 2(1), Sch. 1

Effect of schemeE+W+S

8(1)In relation to each provision of an energy transfer scheme for the transfer of property, rights or liabilities, or for the creation of interests, rights or liabilities—E+W+S

(a)this Act shall have effect so as, without further assurance, to vest the property or interests, or those rights or liabilities, in the transferee at the time appointed by the court for the purposes of paragraph 3(4); and

(b)the provisions of that scheme in relation to that property or those interests, or those rights or liabilities, shall have effect from that time.

(2)In this paragraph “the transferee”—

(a)in relation to property, rights or liabilities transferred by an energy transfer scheme, means the new energy company; and

(b)in relation to interests, rights or liabilities created by such a scheme, means the person in whose favour, or in relation to whom, they are created.

(3)In its application to Scotland, sub-paragraph (1) has effect with the omission of the words “without further assurance”.

Commencement Information

I8Sch. 21 para. 8 in force at 5.10.2004 by S.I. 2004/2575, art. 2(1), Sch. 1

Subsequent modification of schemeE+W+S

9(1)The Secretary of State may by notice to the old energy company and the new energy company modify an energy transfer scheme after it has taken effect, but only modifications to which both the old energy company and the new energy company have consented may be made.E+W+S

(2)The notice must specify the time at which it is to take effect (the “modification time”).

(3)Where a notice is issued under this paragraph in relation to an energy transfer scheme, as from the modification time, the scheme shall for all purposes be treated as having taken effect, at the time appointed for the purposes of paragraph 3(4), with the modifications made by the notice.

(4)Those modifications may make—

(a)any provision that could have been included in the scheme when it took effect at the time appointed for the purposes of paragraph 3(4); and

(b)transitional provision in connection with provision falling within paragraph (a).

(5)In deciding whether to modify an energy transfer scheme, the Secretary of State must have regard, in particular, to—

(a)the public interest; and

(b)the effect the modification is likely to have (if any) upon the interests of third parties.

(6)Before modifying an energy transfer scheme that has taken effect, the Secretary of State must consult GEMA.

(7)The old energy company and the new energy company each have a duty to provide the Secretary of State with all information and other assistance that he may reasonably require for the purposes of, or in connection with, the exercise of the powers conferred on him by this paragraph.

Commencement Information

I9Sch. 21 para. 9 in force at 5.10.2004 by S.I. 2004/2575, art. 2(1), Sch. 1

Transfers in the case of non-GB companiesE+W+S

10E+W+SWhere the old energy company is a non-GB company, the property, rights and liabilities of that company which may be transferred by an energy transfer scheme, or in relation to which interests, rights or liabilities may be created by such a scheme, are confined to—

(a)property of the old energy company in Great Britain;

(b)rights and liabilities arising in relation to any such property; and

(c)rights and liabilities arising in connection with the affairs and business of the company so far as carried on in Great Britain.

Commencement Information

I10Sch. 21 para. 10 in force at 5.10.2004 by S.I. 2004/2575, art. 2(1), Sch. 1

Provision relating to foreign property etc.E+W+S

11(1)Where there is a transfer in accordance with an energy transfer scheme of—E+W+S

(a)any foreign property, or

(b)a foreign right or liability,

the old energy company and the new energy company must each take all requisite steps to secure that the vesting of the foreign property, right or liability in the new energy company is effective under the relevant foreign law.

(2)Until the vesting of the foreign property, right or liability in the new energy company in accordance with the energy transfer scheme is effective under the relevant foreign law, the old energy company must—

(a)hold the property or right for the benefit of the new energy company; or

(b)discharge the liability on behalf of the new energy company.

(3)The old energy company must comply with any directions given to it by the new energy company in relation to the performance of the obligations under sub-paragraphs (1) and (2) of the old energy company.

(4)Nothing in sub-paragraphs (1) to (3) prejudices the effect under the law of a part of Great Britain of the vesting of a foreign property, right or liability in the new energy company in accordance with an energy transfer scheme.

(5)Where—

(a)any foreign property, right or liability is acquired or incurred in respect of any other property, right or liability by a company, and

(b)by virtue of this paragraph, the company holds the other property or right for the benefit of the new energy company or is required to discharge the liability on behalf of the new energy company,

the property, right or liability acquired or incurred shall immediately become the property, right or liability of the new energy company.

(6)The provisions of sub-paragraphs (1) to (5) shall have effect in relation to foreign property, rights or liabilities transferred to the new energy company under sub-paragraph (5) as they have effect in the case of property, rights and liabilities transferred in accordance with an energy transfer scheme.

(7)References in this paragraph to foreign property, or to a foreign right or liability, are references to any property, right or liability as respects which an issue arising in any proceedings would be determined (in accordance with the rules of private international law) by reference to the law of a country or territory outside Great Britain.

(8)Expenses incurred under this paragraph by a company as the company from which anything is transferred shall be met by the new energy company.

(9)An obligation imposed under this paragraph in relation to property, rights or liabilities shall be enforceable as if contained in a contract between the old energy company and the new energy company.

Commencement Information

I11Sch. 21 para. 11 in force at 5.10.2004 by S.I. 2004/2575, art. 2(1), Sch. 1

Application of Schedule to transfers to subsidiariesE+W+S

12E+W+SWhere the proposed transfer falling within subsection (3) of section 155 is a transfer of the kind mentioned in subsection (4)(a) of that section, this Schedule shall have effect in relation to that transfer as if—

(a)paragraph 3(1)(a) were omitted; and

(b)paragraph 3(6) had effect with “ the old energy company has consented may be made ” substituted for the words from “both” onwards.

Commencement Information

I12Sch. 21 para. 12 in force at 5.10.2004 by S.I. 2004/2575, art. 2(1), Sch. 1

InterpretationE+W+S

13E+W+SIn this Schedule—

  • energy transfer scheme” has the meaning given by paragraph 3(1);

  • new energy company” has the meaning given by paragraph 1;

  • third party”, in relation to an energy transfer scheme or any modification of such a scheme, means a person who is neither—

    (a)

    the old energy company; nor

    (b)

    the new energy company.

Commencement Information

I13Sch. 21 para. 13 in force at 5.10.2004 by S.I. 2004/2575, art. 2(1), Sch. 1

Back to top

Options/Help

Print Options

You have chosen to open The Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Act as a PDF

The Whole Act you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open the Whole Act without Schedules

The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Notes

Text created by the government department responsible for the subject matter of the Act to explain what the Act sets out to achieve and to make the Act accessible to readers who are not legally qualified. Explanatory Notes were introduced in 1999 and accompany all Public Acts except Appropriation, Consolidated Fund, Finance and Consolidation Acts.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources