Search Legislation

Planning Act 2008

 Help about what version

What Version

 Help about advanced features

Advanced Features

Changes over time for: Cross Heading: Energy

 Help about opening options

No versions valid at: 26/11/2008

Status:

Point in time view as at 26/11/2008. This version of this cross heading contains provisions that are not valid for this point in time. Help about Status

Close

Status

Not valid for this point in time generally means that a provision was not in force for the point in time you have selected to view it on.

Changes to legislation:

Planning Act 2008, Cross Heading: Energy is up to date with all changes known to be in force on or before 21 May 2024. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Changes and effects yet to be applied by the editorial team are only applicable when viewing the latest version or prospective version of legislation. They are therefore not accessible when viewing legislation as at a specific point in time. To view the ‘Changes to Legislation’ information for this provision return to the latest version view using the options provided in the ‘What Version’ box above.

Valid from 01/03/2010

EnergyE+W+S

15Generating stationsE+W

(1)The construction or extension of a generating station is within section 14(1)(a) only if the generating station is or (when constructed or extended) is expected to be within subsection (2) or (3).

(2)A generating station is within this subsection if—

(a)it is in England or Wales,

(b)it is not an offshore generating station, and

(c)its capacity is more than 50 megawatts.

(3)A generating station is within this subsection if—

(a)it is an offshore generating station, and

(b)its capacity is more than 100 megawatts.

(4)An “offshore” generating station is a generating station that is—

(a)in waters in or adjacent to England or Wales up to the seaward limits of the territorial sea, or

(b)in a Renewable Energy Zone, except any part of a Renewable Energy Zone in relation to which the Scottish Ministers have functions.

16Electric linesE+W

(1)The installation of an electric line above ground is within section 14(1)(b) only if (when installed) the electric line will be—

(a)wholly in England,

(b)wholly in Wales,

(c)partly in England and partly in Wales, or

(d)partly in England and partly in Scotland, subject to subsection (2).

(2)In the case of an electric line falling within subsection (1)(d), the installation of the line above ground is within section 14(1)(b) only to the extent that (when installed) the line will be in England.

(3)The installation of an electric line above ground is not within section 14(1)(b)—

(a)if the nominal voltage of the line is expected to be less than 132 kilovolts, F1...

(b)to the extent that (when installed) the line will be within premises in the occupation or control of the person responsible for its installation [F2, or

(c) if section 37(1) of the Electricity Act 1989 (consent required for overhead lines) does not apply to it by virtue of the Overhead Lines (Exemption) (England and Wales) Regulations 2009 ( S.I. 2009/640 ), as amended by the Overhead Lines (Exempt Installations) (Consequential Provisions) Order 2010. ]

(4)Premises” includes any land, building or structure.

Textual Amendments

Commencement Information

I1S. 16 in force at 1.3.2010 by S.I. 2010/101, art. 4(a) (with art. 6)

17Underground gas storage facilitiesE+W

(1)Development relating to underground gas storage facilities is within section 14(1)(c) only if the development is within subsection (2), (3) or (5).

(2)Development is within this subsection if—

(a)it is the carrying out of operations for the purpose of creating underground gas storage facilities in England, or

(b)it is starting to use underground gas storage facilities in England,

and the condition in subsection (4) is met in relation to the facilities.

(3)Development is within this subsection if—

(a)it is starting to use underground gas storage facilities in Wales,

(b)the facilities are facilities for the storage of gas underground in natural porous strata,

(c)the proposed developer is a gas transporter, and

(d)the condition in subsection (4) is met in relation to the facilities.

(4)The condition is that—

(a)the working capacity of the facilities is expected to be at least 43 million standard cubic metres, or

(b)the maximum flow rate of the facilities is expected to be at least 4.5 million standard cubic metres per day.

(5)Development is within this subsection if—

(a)it is the carrying out of operations for the purpose of altering underground gas storage facilities in England, and

(b)the effect of the alteration is expected to be—

(i)to increase by at least 43 million standard cubic metres the working capacity of the facilities, or

(ii)to increase by at least 4.5 million standard cubic metres per day the maximum flow rate of the facilities.

(6)Underground gas storage facilities” means facilities for the storage of gas underground in cavities or in porous strata.

(7)In this section—

  • maximum flow rate”, in relation to underground gas storage facilities, means the maximum rate at which gas is able to flow out of the facilities, on the assumption that—

    (a)

    the facilities are filled to maximum capacity, and

    (b)

    the rate is measured after any processing of gas required on its recovery from storage;

  • working capacity”, in relation to underground gas storage facilities, means the capacity of the facilities for storage of gas underground, ignoring any capacity for storage of cushion gas.

(8)In subsection (7) “cushion gas” means gas which is kept in underground gas storage facilities for the purpose of enabling other gas stored there to be recovered from storage.

18LNG facilitiesE+W

(1)The construction of an LNG facility is within section 14(1)(d) only if (when constructed) the facility will be in England and—

(a)the storage capacity of the facility is expected to be at least 43 million standard cubic metres, or

(b)the maximum flow rate of the facility is expected to be at least 4.5 million standard cubic metres per day.

(2)The alteration of an LNG facility is within section 14(1)(d) only if the facility is in England and the effect of the alteration is expected to be—

(a)to increase by at least 43 million standard cubic metres the storage capacity of the facility, or

(b)to increase by at least 4.5 million standard cubic metres per day the maximum flow rate of the facility.

(3)LNG facility” means a facility for—

(a)the reception of liquid natural gas from outside England,

(b)the storage of liquid natural gas, and

(c)the regasification of liquid natural gas.

(4)In this section—

  • maximum flow rate”, in relation to a facility, means the maximum rate at which gas is able to flow out of the facility, on the assumption that—

    (a)

    the facility is filled to maximum capacity, and

    (b)

    the rate is measured after regasification of the liquid natural gas and any other processing required on the recovery of the gas from storage;

  • storage capacity” means the capacity of the facility for storage of liquid natural gas.

(5)The storage capacity of an LNG facility is to be measured as if the gas were stored in regasified form.

19Gas reception facilitiesE+W

(1)The construction of a gas reception facility is within section 14(1)(e) only if (when constructed)—

(a)the facility will be in England and will be within subsection (4), and

(b)the maximum flow rate of the facility is expected to be at least 4.5 million standard cubic metres per day.

(2)The alteration of a gas reception facility is within section 14(1)(e) only if—

(a)the facility is in England and is within subsection (4), and

(b)the effect of the alteration is expected to be to increase by at least 4.5 million standard cubic metres per day the maximum flow rate of the facility.

(3)Gas reception facility” means a facility for—

(a)the reception of natural gas in gaseous form from outside England, and

(b)the handling of natural gas (other than its storage).

(4)A gas reception facility is within this subsection if—

(a)the gas handled by the facility does not originate in England, Wales or Scotland,

(b)the gas does not arrive at the facility from Scotland or Wales, and

(c)the gas has not already been handled at another facility after its arrival in England.

(5)Maximum flow rate” means the maximum rate at which gas is able to flow out of the facility.

20Gas transporter pipe-linesE+W

(1)The construction of a pipe-line by a gas transporter is within section 14(1)(f) only if (when constructed) each of the conditions in subsections (2) to (5) is expected to be met in relation to the pipe-line.

(2)The pipe-line must be wholly or partly in England.

(3)Either—

(a)the pipe-line must be more than 800 millimetres in diameter and more than 40 kilometres in length, or

(b)the construction of the pipe-line must be likely to have a significant effect on the environment.

(4)The pipe-line must have a design operating pressure of more than 7 bar gauge.

(5)The pipe-line must convey gas for supply (directly or indirectly) to at least 50,000 customers, or potential customers, of one or more gas suppliers.

(6)In the case of a pipe-line that (when constructed) will be only partly in England, the construction of the pipe-line is within section 14(1)(f) only to the extent that the pipe-line will (when constructed) be in England.

(7)Gas supplier” has the same meaning as in Part 1 of the Gas Act 1986 (c. 44) (see section 7A(11) of that Act).

21Other pipe-linesE+W+S

(1)The construction of a pipe-line other than by a gas transporter is within section 14(1)(g) only if (when constructed) the pipe-line is expected to be—

(a)a cross-country pipe-line,

(b)a pipe-line the construction of which would (but for section 33(1) of this Act) require authorisation under section 1(1) of the Pipe-lines Act 1962 (c. 58) (cross-country pipe-lines not to be constructed without authorisation), and

(c)within subsection (2).

(2)A pipe-line is within this subsection if one end of it is in England or Wales and—

(a)the other end of it is in England or Wales, or

(b)it is an oil or gas pipe-line and the other end of it is in Scotland.

(3)For the purposes of section 14(1)(g) and the previous provisions of this section, the construction of a diversion to a pipe-line is treated as the construction of a separate pipe-line.

(4)But if—

(a)the pipe-line to be diverted is itself a nationally significant pipe-line, and

(b)the length of the pipe-line which is to be diverted has not been constructed,

the construction of the diversion is treated as the construction of a cross-country pipe-line, whatever the length of the diversion.

(5)For the purposes of subsection (4), a pipe-line is a nationally significant pipe-line if—

(a)development consent is required for its construction by virtue of section 14(1)(g), and has been granted, or

(b)its construction has been authorised by a pipe-line construction authorisation under section 1(1) of the Pipe-lines Act 1962 (c. 58).

(6)Diversion” means a lateral diversion of a length of a pipe-line (whether or not that pipe-line has been constructed) where the diversion is beyond the permitted limits.

(7)The permitted limits are the limits of lateral diversion permitted by any of the following granted in respect of the construction of the pipe-line—

(a)development consent;

(b)authorisation under the Pipe-lines Act 1962;

(c)planning permission.

Back to top

Options/Help

Print Options

You have chosen to open The Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Act as a PDF

The Whole Act you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open The Whole Act without Schedules

The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Act without Schedules as a PDF

The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open the Whole Act without Schedules

The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Notes

Text created by the government department responsible for the subject matter of the Act to explain what the Act sets out to achieve and to make the Act accessible to readers who are not legally qualified. Explanatory Notes were introduced in 1999 and accompany all Public Acts except Appropriation, Consolidated Fund, Finance and Consolidation Acts.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources