Search Legislation

Appropriation Act 2008 (repealed)

 Help about what version

What Version

 Help about advanced features

Advanced Features

Changes over time for: Cross Heading: Notes

 Help about opening options

Version Superseded: 27/07/2010

Alternative versions:

Status:

Point in time view as at 20/03/2008.

Changes to legislation:

There are currently no known outstanding effects for the Appropriation Act 2008 (repealed), Cross Heading: Notes. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

NotesU.K.

1U.K.In Part 1 of Schedule 2 of the Appropriation (No. 2) Act 2007 (c. 10), the title of the Estimate which is now entitled Department for Children, Schools and Families was Department for Education and Skills.

2U.K.The reduction of the sums authorised for issue out of the Consolidated Fund in respect of the Department for Children, Schools and Families Estimate comprises—

(a)supplementary sums totalling £656,108,000,

(b)a reduction of £15,476,211,000 in consequence of a transfer of functions to the Department for Innovation, Universities and Skills (see also Note 55), and

(c)an increase of £25,600,000 in consequence of a transfer of functions from the Home Office (see also Note 12).

3U.K.The modification set out in the Table on the limit set on the resources applicable as nonoperating appropriations in aid in respect of the Department for Children, Schools and Families is in consequence of a transfer of functions to the Department for Innovation, Universities and Skills (see also Note 56).

4U.K.The reduction of the resources authorised for use in respect of Request for Resources 1 of the Department for Children, Schools and Families Estimate comprises—

(a)supplementary resources totalling £144,467,000,

(b)a reduction of £13,194,792,000 in consequence of a transfer of functions to the Department for Innovation, Universities and Skills (see also Notes 57 and 59),

(c)an increase of £25,600,000 in consequence of a transfer of functions from the Home Office (see also Note 13),

(d)an increase of £4,900,000 in consequence of a reallocation of resources previously authorised for use in respect of Request for Resources 2 of that Estimate (see also Note 6); and

(e)an increase of £65,056,000 in consequence of a reallocation of resources previously authorised for use in respect of Request for Resources 3 of that Estimate (see also Note 7).

5(1)The modification set out in the Table on the limit set on the resources applicable as operating appropriations in aid in respect of Request for Resources 1 of the Department for Children, Schools and Families Estimate comprises—U.K.

(a)a reduction of the limit of £882,178,000, calculated as described in paragraph (2), and

(b)a subsequent increase of the limit of £15,629,000.

(2)The amount of £882,178,000, specified in sub-paragraph 1(a) was calculated by aggregating—

(a)a reduction of £362,597,000, and

(b)a reduction of £519,581,000 in consequence of a transfer of functions to the Department for Innovation, Universities and Skills (see also Note 58).

6U.K.The increase of the resources authorised for use in respect of Request for Resources 2 of the Department for Children, Schools and Families Estimate comprises—

(a)supplementary resources totalling £ 63,067,000, and

(b)a reduction of £4,900,000 in consequence of a reallocation of resources to Request for Resources 1 of that Estimate (see also Note 4).

7U.K.The reduction in resources authorised for use in respect of Request for Resources 3 of the Department for Children, Schools and Families Estimate is in consequence of a reallocation of resources to Request for Resources 1 of that Estimate (see also Note 4).

8U.K.The increase of the sums authorised for issue out of the Consolidated Fund in respect of the Office for Standards in Education, Children's Services and Skills Estimate comprises—

(a)supplementary sums totalling £24,267,000, and

(b)an increase of £485,000 in consequence of a transfer of functions from the Ministry of Justice (see also Note 16).

9U.K.The increase of the resources authorised for use in respect of Request for Resources 1 of the Office for Standards in Education, Children's Services and Skills Estimate comprises—

(a)supplementary resources totalling £15,924,000, and

(b)an increase of £485,000 in consequence of a transfer of functions from the Ministry of Justice (see also Note 17).

10U.K.The increase of the sums authorised for issue out of the Consolidated Fund in respect of the Department for Communities and Local Government Estimate comprises—

(a)supplementary sums totalling £1,331,348,000,

(b)a reduction of £26,493,000 in consequence of a transfer of functions to the Department of Business, Enterprise and Regulatory Reform (see also Note 24), and

(c)a reduction of £60,077,000 in consequence of a transfer of functions to the Government Equalities Office (see also Note 61).

11U.K.The increase of the resources authorised for use in respect of Request for Resources 1 of the Department for Communities and Local Government Estimate comprises—

(a)supplementary resources totalling £879,284,000,

(b)a reduction of £26,493,000 in consequence of a transfer of functions to the Department of Business, Enterprise and Regulatory Reform (see also Note 26), and

(c)a reduction of £60,077,000 in consequence of a transfer of functions to the Government Equalities Office (see also Note 62).

12U.K.The reduction of the sums authorised for issue out of the Consolidated Fund in respect of the Home Office Estimate comprises—

(a)supplementary sums totalling £ 355,989,000,

(b)a reduction of £ 5,171,011,000 in consequence of a transfer of functions to the Ministry of Justice (see also Note 16), and

(c)a reduction of £25,600,000 in consequence of a transfer of functions to the Department for Children, Schools and Families (see also Note 2).

13U.K.The reduction of the resources authorised for use in respect of Request for Resources 1 of the Home Office Estimate comprises—

(a)supplementary resources totalling £ 375,980,000,

(b)a reduction of £5,056,283,000 in consequence of a transfer of functions to the Ministry of Justice (see also Note 17), and

(c)a reduction of £25,600,000 in consequence of a transfer of functions to the Department for Children, Schools and Families (see also Note 4).

14(1)The modification set out in the Table on the limit set on the resources applicable as operating appropriations in aid in respect of Request for Resources 1 of the Home Office Estimate comprises—U.K.

(a)a reduction of the limit of £382,466,000, calculated as described in paragraph (2), and

(b)a subsequent increase of the limit of £45,613,000.

(2)The amount of £382,466,000 specified in sub-paragraph 1(a) was calculated by aggregating—

(a)an increase of £20,128,000, and

(b)a reduction of £402,594,000 in consequence of a transfer of functions to the Ministry of Justice (see also Note 18).

15U.K.In Part 14 of Schedule 2 of the Appropriation (No. 2) Act 2007 (c. 10), the title of the Estimate which is now entitled Ministry of Justice was Department for Constitutional Affairs.

16U.K.The increase of the sums authorised for issue out of the Consolidated Fund in respect of the Ministry of Justice Estimate comprises—

(a)supplementary sums totalling £1,384,109,000,

(b)an increase of £2,320,000 in consequence of a transfer of functions from the Privy Council Office (see also Note 52),

(c)an increase of £5,171,011,000 in consequence of a transfer of functions from the Home Office (see also Note 12),

(d)a reduction of £485,000 in consequence of a transfer of functions to the Office for Standards in Education, Children's Services and Skills (see also Note 8), and

(e)a reduction of £2,225,000 in consequence of a transfer of functions to the Government Equalities Office (see also Note 61).

17U.K.The increase of the resources authorised for use in respect of Request for Resources 1 of the Ministry of Justice Estimate comprises—

(a)supplementary resources totalling £597,190,000,

(b)an increase of £2,268,000 in consequence of a transfer of functions from the Privy Council Office (see also Note 53),

(c)an increase of £5,056,283,000 in consequence of a transfer of functions from the Home Office (see also Note 13),

(d)a reduction of £485,000 in consequence of a transfer of functions to the Office for Standards in Education, Children's Services and Skills (see also Note 9), and

(e)a reduction of £2,225,000 in consequence of a transfer of functions to the Government Equalities Office (see also Note 62).

18(1)The modification set out in the Table on the limit set on the resources applicable as operating appropriations in aid in respect of Request for Resources 1 of the Ministry of Justice Estimate comprises—U.K.

(a)an increase of the limit of £535,955,000, calculated as described in paragraph (2), and

(b)a subsequent increase of the limit of £13,525,000.

(2)The amount of £535,955,000, specified in sub-paragraph 1(a) was calculated by aggregating—

(a)an increase of £133,321,000,

(b)an increase of £40,000 in consequence of a transfer of functions from the Privy Council Office (see also Note 54), and

(c)an increase of £402,594,000 in consequence of a transfer of functions from the Home Office (see also Note 14).

19U.K.In Part 15 of Schedule 2 of the Appropriation (No. 2) Act 2007 (c. 10), the title of the Estimate which is now entitled Ministry of Justice: Judicial Pensions Scheme was Department for Constitutional Affairs: Judicial Pensions Scheme.

20U.K.The increase of the sums authorised for issue out of the Consolidated Fund in respect of the Northern Ireland Court Service Estimate comprises—

(a)supplementary sums totalling £15,980,000, and

(b)an increase of £681,000 in consequence of a transfer of functions from the Northern Ireland Office (see also Note 41).

21U.K.The increase of the resources authorised for use in respect of Request for Resources 1 of the Northern Ireland Court Service Estimate comprises—

(a)supplementary resources totalling £19,560,000, and

(b)an increase of £681,000 in consequence of a transfer of functions from the Northern Ireland Office (see also Note 43).

22U.K.The modification set out in the Table on the limit set on the resources applicable as operating appropriations in aid in respect of Request for Resources 1 of the Ministry of Defence Estimate comprises—

(a)an increase of the limit of £2,059,000 in consequence of a transfer of functions from HM Revenue and Customs (see also Note 47), and

(b)a subsequent increase of the limit of £257,577,000.

23U.K.In Part 27 of Schedule 2 of the Appropriation (No. 2) Act 2007 (c. 10), the title of the Estimate which is now entitled Department for Business, Enterprise and Regulatory Reform was Department of Trade and Industry.

24U.K.The reduction of the sums authorised for issue out of the Consolidated Fund in respect of the Department for Business, Enterprise and Regulatory Reform Estimate comprises—

(a)supplementary sums totalling £1,717,769,000,

(b)a reduction of £3,377,600,000 in consequence of a transfer of functions to the Department for Innovation, Universities and Skills (see also Note 55),

(c)an increase of £26,493,000 in consequence of a transfer of functions from the Department for Communities and Local Government (see also Note 10),

(d)an increase of £11,429,000 in consequence of a transfer of functions from the Cabinet Office (see also Note 50), and

(e)a reduction of £1,272,000 in consequence of a transfer of functions to the Office for National Statistics (see also Note 48).

25U.K.The modification set out in the Table on the limit set on the resources applicable as nonoperating appropriations in aid in respect of the Department for Business, Enterprise and Regulatory Reform Estimate comprises—

(a)a reduction of the limit of £166,000 in consequence of a transfer of functions to the Department for Innovation, Universities and Skills (see also Note 56), and

(b)a subsequent increase of the limit of £2,800,000.

26U.K.The increase of the resources authorised for use in respect of Request for Resources 1 of the Department for Business, Enterprise and Regulatory Reform Estimate comprises—

(a)supplementary resources totalling £ 962,913,000,

(b)a reduction of £353,049,000 in consequence of a transfer of functions to the Department for Innovation, Universities and Skills (see also Note 57),

(c)an increase of £26,493,000 in consequence of a transfer of functions from the Department for Communities and Local Government (see also Note 11),

(d)an increase of £11,429,000 in consequence of a transfer of functions from the Cabinet Office (see also Note 51), and

(e)a reduction of £1,272,000 in consequence of a transfer of functions to the Office for National Statistics (see also Note 49).

27(1)The modification set out in the Table on the limit set on the resources applicable as operating appropriations in aid in respect of Request for Resources 1 of the Department for Business, Enterprise and Regulatory Reform Estimate comprises—U.K.

(a)an increase of the limit of £976,511,000, calculated as described in paragraph (2), and

(b)a subsequent increase of the limit of £36,244,000.

(2)The amount of £976,511,000, specified in sub-paragraph 1(a) was calculated by aggregating—

(a)an increase of £977,066,000, and

(b)a reduction of £555,000 in consequence of a transfer of functions to the Department for Innovation, Universities and Skills (see also Note 58).

28U.K.The reduction of the resources authorised for use in respect of Request for Resources 2 of the Department for Business, Enterprise and Regulatory Reform Estimate is in consequence of a transfer of functions to the Department for Innovation, Universities and Skills (see also Note 59).

29U.K.The modification set out in the Table on the limit set on the resources applicable as operating appropriations in aid in respect of Request for Resources 2 of the Department for Business, Enterprise and Regulatory Reform Estimate is in consequence of a transfer of functions to the Department for Innovation, Universities and Skills (see also Note 60).

30U.K.In Part 29 of Schedule 2 of the Appropriation (No. 2) Act 2007 (c. 10), the title of the Estimate which is now entitled Department for Business, Enterprise and Regulatory Reform: UKAEA Pension Schemes was Department of Trade and Industry: UKAEA Pension Schemes.

31U.K.The increase of the resources authorised for use in respect of Request for Resources 1 of the Office of Gas and Electricity Markets comprises—

(a)supplementary resources totalling £2,000, and

(b)an increase of £700,000 in consequence of a reallocation of resources previously authorised for use in respect of Request for Resources 2 of that Estimate (see also Note 32).

32U.K.The reduction of the resources authorised for use in respect of Request for Resources 2 of the Office of Gas and Electricity Markets is in consequence of a reallocation of resources to Request for Resources 1 of that Estimate (see also Note 31).

33U.K.The modification set out in the Table of the limit set on the resources applicable as operating appropriations in aid in respect of Request for Resources 1 of the Department for Culture, Media and Sport Estimate comprises—

(a)an increase of the limit of £12,957,000, and

(b)a subsequent reduction of the limit of £1,451,000.

34U.K.The increase of the sums authorised for issue out of the Consolidated Fund in respect of the Department for Work and Pensions Estimate comprises—

(a)supplementary sums totalling £1,788,311,000, and

(b)a reduction of £20,088,000 in consequence of a transfer of functions to the Government Equalities Office (see also Note 61).

35U.K.The increase of the resources authorised for use in respect of Request for Resources 1 of the Department for Work and Pensions Estimate comprises—

(a)supplementary resources totalling £121,422,000, and

(b)an increase of £26,297,000 in consequence of a reallocation of resources previously authorised for use in respect of Request for Resources 5 of that Estimate (see also Note 39).

36U.K.The increase of the resources authorised for use in respect of Request for Resources 2 of the Department for Work and Pensions Estimate comprises—

(a)supplementary resources totalling £ 508,871,000,

(b)a reduction of £88,000 in consequence of a transfer of functions to the Government Equalities Office (see also Note 62), and

(c)an increase of £130,000,000 in consequence of a reallocation of resources previously authorised for use in respect of Request for Resources 5 of that Estimate (see also Note 39).

37U.K.The increase of the resources authorised for use in respect of Request for Resources 3 of the Department for Work and Pensions Estimate comprises—

(a)supplementary resources totalling £ 5,187,811,000, and

(b)an increase of £87,509,000 in consequence of a reallocation of resources previously authorised for use in respect of Request for Resources 5 of that Estimate (see also Note 39).

38U.K.The increase of the resources authorised for use in respect of Request for Resources 4 of the Department for Work and Pensions Estimate comprises—

(a)supplementary resources totalling £ 478,443,000,

(b)a reduction of £20,000,000 in consequence of a transfer of functions to the Government Equalities Office (see also Note 62), and

(c)an increase of £8,118,000 in consequence of a reallocation of resources previously authorised for use in respect of Request for Resources 5 of that Estimate (see also Note 39).

39U.K.The reduction of the resources authorised for use in respect of Request for Resources 5 of the Department for Work and Pensions Estimate comprises—

(a)supplementary resources totalling 39,430,000,

(b)a reduction of £26,297,000 in consequence of a reallocation of resources to Request for Resources 1 of that Estimate (see also Note 35),

(c)a reduction of £130,000,000 in consequence of a reallocation of resources to Request for Resources 2 of that Estimate (see also Note 36),

(d)a reduction of £87,509,000 in consequence of a reallocation of resources to Request for Resources 3 of that Estimate (see also Note37), and

(e)a reduction of £8,118,000 in consequence of a reallocation of resources to Request for Resources 4 of that Estimate (see also Note 38).

40U.K.The modification set out in the Table of the limit set on the resources applicable as operating appropriations in aid in respect of Request for Resources 5 of the Department for Work and Pensions Estimate comprises—

(a)an increase of the limit of £1,153,000, and

(b)a subsequent reduction of the limit of £1,887,000.

41U.K.The increase of the sums authorised for issue out of the Consolidated Fund in respect of the Northern Ireland Office Estimate comprises—

(a)supplementary sums totalling £167,311,000, and

(b)a reduction of £681,000 in consequence of a transfer of functions to the Northern Ireland Court Service (see also Note 20).

42U.K.The modification set out in the Table of the limit set on the resources applicable as nonoperating appropriations in aid in respect of the Northern Ireland Office Estimate comprises—

(a)an increase of the limit of £69,211,000, and

(b)a subsequent reduction of the limit of £700,000.

43U.K.The increase of the resources authorised for use in respect of Request for Resources 1 of the Northern Ireland Office Estimate comprises—

(a)supplementary resources totalling £178,488,000, and

(b)a reduction of £681,000 in consequence of a transfer of functions to the Northern Ireland Court Service (see also Note 21).

44U.K.The modification set out in the Table of the limit set on the resources applicable as operating appropriations in aid in respect of Request for Resources 1 the Northern Ireland Office Estimate comprises—

(a)an increase of the limit of £3,568,000, and

(b)a subsequent reduction of the limit of £2,004,000.

45U.K.The increase of the sums authorised for issue out of the Consolidated Fund in respect of the HM Treasury Estimate comprises—

(a)supplementary sums totalling £25,381,000, and

(b)an increase of £4,028,000 in consequence of a transfer of functions from the Cabinet Office (see also Note 50).

46U.K.The increase of the resources authorised for use in respect of Request for Resources 1 of the HM Treasury Estimate comprises—

(a)supplementary resources totalling £6,017,000, and

(b)an increase of £4,028,000 in consequence of a transfer of functions from the Cabinet Office (see also Note 51).

47U.K.The modification set out in the Table on the limit set on the resources applicable as operating appropriations in aid in respect of Request for Resources 4 of the HM Revenue and Customs Estimate is in consequence of a transfer of functions to the Ministry of Defence (see also Note 22).

48U.K.The increase of the sums authorised for issue out of the Consolidated Fund in respect of the Office for National Statistics Estimate comprises—

(a)supplementary sums totalling £13,616,000, and

(b)an increase of £1,272,000 in consequence of a transfer of functions from the Department for Business, Enterprise and Regulatory Reform (see also Note 24).

49U.K.The increase of the resources authorised for use in respect of Request for Resources 1 of the Office for National Statistics Estimate comprises—

(a)supplementary resources totalling £12,341,000, and

(b)an increase of £1,272,000 in consequence of a transfer of functions from the Department for Business, Enterprise and Regulatory Reform (see also Note 26).

50U.K.The increase of the sums authorised for issue out of the Consolidated Fund in respect of the Cabinet Office Estimate comprises—

(a)supplementary sums totalling £24,793,000,

(b)a reduction of £4,028,000 in consequence of a transfer of functions to HM Treasury (see also Note 45),

(c)a reduction of £11,429,000 in consequence of a transfer of functions to the Department for Business, Enterprise and Regulatory Reform (see also Note 24), and

(d)an increase of £4,546,000 in consequence of a transfer of functions from the Privy Council Office (see also Note 52).

51U.K.The reduction of the resources authorised for use in respect of Request for Resources 1 of the Cabinet Office Estimate comprises—

(a)supplementary resources totalling £ 1,967,000,

(b)a reduction of £4,028,000 in consequence of a transfer of functions to HM Treasury (see also Note 46),

(c)a reduction of £11,429,000 in consequence of a transfer of functions to the Department for Business, Enterprise and Regulatory Reform (see also Note 26), and

(d)an increase of £4,553,000 in consequence of a transfer of functions from the Privy Council Office (see also Note 53).

52U.K.The reduction of the sums authorised for issue out of the Consolidated Fund in respect of the Privy Council Office Estimate comprises—

(a)a reduction of £4,546,000 in consequence of a transfer of functions to the Cabinet Office (see also Note 50), and

(b)a reduction of £2,320,000 in consequence of a transfer of functions to the Ministry of Justice (see also Note 16).

53U.K.The reduction of the resources authorised for use in respect of Request for Resources 1 of the Privy Council Office Estimate comprises—

(a)a reduction of £4,553,000 in consequence of a transfer of functions to the Cabinet Office (see also Note 51), and

(b)a reduction of £2,268,000 in consequence of a transfer of functions to the Ministry of Justice (see also Note 17).

54U.K.The modification set out in the Table on the limit set on resources applicable as operating appropriations in aid in respect of Request for Resources 1 of the Privy Council Office Estimate is in consequence of a transfer of functions to the Ministry of Justice (see also Note 18).

55U.K.The sums authorised for issue out of the Consolidated Fund in respect of the Department for Innovation, Universities and Skills Estimate comprise—

(a)sums totalling £15,476,211,000 that are authorised for issue out of the Consolidated Fund in respect of that Estimate in consequence of a transfer of functions from the Department for Children, Schools and Families (see also Note 2),

(b)sums totalling £3,377,600,000 that are authorised for issue out of the Consolidated Fund in respect of that Estimate in consequence of a transfer of functions from the Department for Business, Enterprise and Regulatory Reform (see also Note 24), and

(c)other sums totalling £ 582,417,000.

56(1)The limit set on resources applicable as non-operating appropriations in aid in respect of the Department for Innovation, Universities and Skills Estimate comprises—U.K.

(a)an initial limit of £621,246,000, calculated as described in paragraph (2), and

(b)a subsequent increase in the limit of £76,120,000.

(2)The amount of £621,246,000 specified in sub-paragraph 1(a) was calculated by aggregating—

(a)£621,080,000 in consequence of a transfer of functions from the Department for Children, Schools and Families (see also Note 3), and

(b)£166,000 in consequence of a transfer of functions from the Department for Business, Enterprise and Regulatory Reform (see also Note 25).

57U.K.The resources authorised for use in respect of Request for Resources 1 of the Department for Innovation, Universities and Skills Estimate comprise—

(a)resources totalling £12,912,822,000 that are authorised for use in respect of that Request for Resources in consequence of a transfer of functions from the Department for Children, Schools and Families (see also Note 4),

(b)resources totalling £353,049,000 that are authorised for use in respect of that Request for Resources in consequence of a transfer of functions from the Department for Business, Enterprise and Regulatory Reform (see also Note 26), and

(c)other resources totalling £1,269,716,000.

58(1)The limit set on resources applicable as operating appropriations in aid in respect of Request for Resources 1 of the Department for Innovation, Universities and Skills Estimate comprises—U.K.

(a)an initial limit of £7,729,390,000, calculated as described in paragraph (2), and,

(b)a subsequent increase in the limit of £478,519,000.

(2)The amount of £7,729,390,000 specified in sub-paragraph 1(a) was calculated by aggregating—

(a)£7,209,254,000,

(b)£519,581,000 in consequence of a transfer of functions from the Department for Children, Schools and Families (see also Note 5), and

(c)£555,000 in consequence of a transfer of functions from the Department for Business, Enterprise and Regulatory Reform (see also Note 27).

59U.K.The resources authorised for use in respect of the Request for Resources 2 of the Department for Innovation, Universities and Skills Estimate comprise—

(a)resources totalling £281,970,000 that are authorised for use in respect of that Request for Resources in consequence of a transfer of functions from the Department for Children, Schools and Families (see also Note 4),

(b)resources totalling £3,019,377,000 that are authorised for use in respect of that Request for Resources in consequence of a transfer of functions from the Department for Business, Enterprise and Regulatory Reform (see also Note 28), and

(c)other resources totalling £111,719,000.

60(1)The limit set on resources applicable as operating appropriations in aid in respect of Request for Resources 2 of the Department for Innovation, Universities and Skills Estimate comprises—U.K.

(a)an initial limit of £1,000,000, in consequence of a transfer of functions from the Department for Business, Enterprise and Regulatory Reform (see also Note 29), and

(b)a subsequent increase in the limit of £7,306,000.

61U.K.The sums authorised for issue out of the Consolidated Fund in respect of the Government Equalities Office Estimate comprise—

(a)sums totalling £60,077,000 that are authorised for issue out of the Consolidated Fund in respect of that Estimate in consequence of a transfer of functions from the Department for Communities and Local Government (see also Note 10),

(b)sums totalling £20,088,000 that are authorised for issue out of the Consolidated Fund in respect of that Estimate in consequence of a transfer of functions from the Department for Work and Pensions (see also Note 34),

(c)sums totalling £2,225,000 that are authorised for issue out of the Consolidated Fund in respect of that Estimate in consequence of a transfer of functions from the Ministry of Justice (see also Note 16); and

(d)other sums totalling £26,843,000.

62U.K.The resources authorised for use in respect of the Request for Resources 1 of the Government Equalities Office Estimate comprise—

(a)resources totalling £60,077,000 that are authorised for use in respect of that Request for Resources in consequence of a transfer of functions from the Department for Communities and Local Government (see also Note 11),

(b)resources totalling £20,088,000 that are authorised for use in respect of that Request for Resources in consequence of a transfer of functions from the Department for Work and Pensions (see also Notes 36 and 38),

(c)resources totalling £2,225,000 that are authorised for use in respect of that Request for Resources in consequence of a transfer of functions from the Ministry of Justice (see also Note 17); and

(d)other resources totalling £26,843,000.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources