Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

90InterpretationE+W+S

This section has no associated Explanatory Notes

(1)In this Chapter—

  • foreign sector of the continental shelf” means an area within which rights are exercisable with respect to the sea bed and subsoil and their natural resources by a country or territory outside the United Kingdom;

  • gas” means any substance which is or, if it were in a gaseous state, would be gas within the meaning of Part 1 of the Gas Act 1986;

  • gas processing facility” means any facility which—

    (a)

    carries out gas processing operations in relation to piped gas;

    (b)

    is operated otherwise than by a gas transporter; and

    (c)

    is not an LNG import or export facility (within the meaning of section 12 of the Gas Act 1995);

  • [F1the OGA” means the Oil and Gas Authority;]

  • oil processing facility” means any facility which carries out oil processing operations;

  • payments” means payments in money or money's worth;

  • petroleum” has the same meaning as in Part 1 of the Petroleum Act 1998, and includes petroleum that has undergone any processing;

  • piped gas” means gas which—

    (a)

    originated from a petroleum production project; and

    (b)

    has been conveyed only by means of pipes;

  • pipeline” means a pipe or system of pipes for the conveyance of any thing;

  • upstream petroleum pipeline” means a pipeline or one of a network of pipelines—

    (a)

    which is operated or constructed as part of a petroleum production project and is not a carbon dioxide pipeline;

    (b)

    which is used to convey petroleum from the site of one or more such projects—

    (i)

    directly to premises, in order for that petroleum to be used at those premises for power generation or for an industrial process;

    (ii)

    directly to a place outside Great Britain;

    (iii)

    directly to a terminal; or

    (iv)

    indirectly to a terminal by way of one or more other terminals, whether or not such intermediate terminals are of the same kind as the final terminal; or

    (c)

    which is used to convey gas directly from a terminal to a pipeline system operated by a gas transporter or to any premises.

(2)For the purposes of this section—

  • carbon dioxide pipeline” means—

    (a)

    a pipeline used to convey carbon dioxide to a carbon dioxide storage site; or

    (b)

    a pipeline which is not being used for any purpose but which is intended to be used to convey carbon dioxide to such a site;

  • carbon dioxide storage site” means a facility—

    (a)

    for the storage of carbon dioxide (with a view to its permanent disposal, or as an interim measure prior to its permanent disposal); and

    (b)

    in respect of the use of which a person is required to have a licence under section 18 of the Energy Act 2008;

  • gas processing operation” means any of the following operations—

    (a)

    purifying, blending, odorising or compressing gas for the purpose of enabling it to be introduced into a pipeline system operated by a gas transporter or to be conveyed to an electricity generating station, a gas storage facility or any place outside Great Britain;

    (b)

    removing from gas for that purpose any of its constituent gases, or separating from gas for that purpose any oil or water;

    (c)

    determining the quantity or quality of gas which is or is to be so introduced, or so conveyed, whether generally or by or on behalf of a particular person,

    (d)

    separating, purifying, blending, odorising or compressing gas for the purpose of—

    (i)

    converting it into a form in which a purchaser is willing to accept delivery from a seller, or

    (ii)

    enabling it to be loaded for conveyance to another place (whether inside or outside Great Britain); and

    (e)

    loading gas—

    (i)

    at a facility which carries out operations of a kind mentioned in paragraph (d), or

    (ii)

    piped from such a facility,

    for the purpose of enabling the gas to be conveyed to another place (whether inside or outside Great Britain);

  • gas transporter” has the meaning given by section 7(1) of the Gas Act 1986;

  • oil processing operations” means any of the following operations—

    (a)

    initial blending and such other treatment of petroleum as may be required to produce stabilised crude oil and other hydrocarbon liquids to the point at which a seller could reasonably make a delivery to a purchaser of such oil and liquids;

    (b)

    receiving stabilised crude oil and other hydrocarbon liquids piped from an oil processing facility carrying out operations of a kind mentioned in paragraph (a), or storing oil or other hydrocarbon liquids so received, prior to their conveyance to another place (whether inside or outside Great Britain);

    (c)

    loading stabilised crude oil and other hydrocarbon liquids piped from a facility carrying out operations of a kind mentioned in paragraph (a) or (b) for conveyance to another place (whether inside or outside Great Britain);

  • petroleum production project” means a project carried out by virtue of a licence granted under section 3 of the Petroleum Act 1998 or section 2 of the Petroleum (Production) Act 1934, or an equivalent project in a foreign sector of the continental shelf, and includes such a project which is used for the storage of gas;

  • terminal” includes—

    (a)

    facilities for such initial blending and other treatment as may be required to produce stabilised crude oil and other hydrocarbon liquids to the point at which a seller could reasonably make a delivery to a purchaser of such oil and liquids;

    (b)

    oil processing facilities;

    (c)

    gas processing facilities; and

    (d)

    a facility for the reception of gas prior to its conveyance to a place outside Great Britain.

Textual Amendments

F1Words in s. 90(1) inserted (1.10.2016) by Energy Act 2016 (c. 20), s. 84(3), Sch. 1 para. 72; S.I. 2016/920, reg. 2(a)

Commencement Information

I1S. 90 in force at 21.3.2012 by S.I. 2012/873, art. 2(b)(i) (with art. 4)

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Notes

Text created by the government department responsible for the subject matter of the Act to explain what the Act sets out to achieve and to make the Act accessible to readers who are not legally qualified. Explanatory Notes were introduced in 1999 and accompany all Public Acts except Appropriation, Consolidated Fund, Finance and Consolidation Acts.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources