Introductory Text
1.Citation and commencement
2.Interpretation
3.Incorporation of Railways Clauses Acts
4.Transfer of statutory obligations from Board to Council
5.Power to construct and maintain works
6.Power to deviate
7.Power to execute street works
8.Temporary stopping up of streets
9.Access to works
10.Construction of bridges and tunnels
11.Level crossings
12.As to Distillery Side Crossing
13.As to Distillery Side Cottages foot crossing
14.As to Tingle Bridge Lane and Smithy Bridge Lane Crossings
15.Power to operate and use railway
16.Maintenance of approved works, etc.
17.Certification of plans, etc.
18.Power to transfer or lease railway
19.Arbitration
Signature
SCHEDULE 1
STREETS SUBJECT TO STREET WORKS AND TO BE TEMPORARILY STOPPED UP
SCHEDULE 2
LEVEL CROSSINGS REFERRED TO IN ARTICLE 11
SCHEDULE 3
PART 1
1.Particulars of the Protective Equipment
2.An audible warning device shall be provided on or adjacent...
3.A reflectorised stop line of the size, colour and type...
4.A reflectorised pedestrian stop line of the size, colour and...
5.Where the specified road passes over the crossing, reflectorised edge...
6.The centre line of the carriageway shall be marked on...
7.A traffic sign of the size, colour and type shown...
8.A traffic sign of the size, colour and type shown...
9.A traffic sign of the size, colour and type shown...
10.Lighting shall be provided as necessary so that during the...
11.A driver’s indicator shall be provided on each railway approach...
12.A standard level crossing speed restriction board combined with a...
13.A plunger and a stopboard of standard railway design displaying...
14.An advance warning board of standard railway design shall be...
15.Cattle-cum-trespass guards of a standard railway design shall be provided...
16.In this part— (a) “Class 1 retroreflecting material” is material...
PART II
17.Conditions and requirements to be observed
18.When a train either occupies a track circuit or operates...
19.If the white light mentioned in paragraph 11 shows and...
Explanatory Note