xmlns:atom="http://www.w3.org/2005/Atom"

SCHEDULE 12(Annex XIII to the Lifts Directive)FULL QUALITY ASSURANCE FOR LIFTS(module H)

2.  The installer of a lift must operate an approved quality assurance system for design, manufacture, assembly, installation and final inspection of the lifts and testing as specified in Section 3 and must be subject to surveillance as specified in Section 4.