The Lifts Regulations 1997

5.  The notified body must receive the following documents:

  • the plan of the complete lift,

  • the plans and diagrams necessary for final inspection, in particular control circuit diagrams,

  • a copy of the instruction manual referred to in Annex I, Section 6.2.

The notified body may not require detailed plans or precise information not necessary for verifying the conformity of the lift about to be placed on the market with the model lift described in the EC type-examination declaration.