Search Legislation

The M60 Motorway (Improvement Between Junctions 5 and 8) Connecting Roads Scheme 1999

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

  1. Introductory Text

  2. 1.This Scheme may be cited as the M60 Motorway (Improvement...

  3. 2.In this Scheme: (a) all measurements of distance are measured...

  4. 3.The Secretary of State is authorised to provide the special...

  5. 4.The centre line of each of the special roads is...

  6. 5.Each of the special roads shall become a trunk road...

  7. 6.The Secretary of State is authorised to construct—

  8. Signature

    1. SCHEDULE 1

      ROUTES OF THE CONNECTING ROADS

      1. The routes of the connecting roads are as follows:

      2. Two routes to connect the connecting road referred to in...

      3. Two routes to connect the Motorway with the A56 Chester...

    2. SCHEDULE 2 WITH KEY PLAN AND SITE PLAN

      PLANS AND SPECIFICATIONS FOR THE BRIDGE CROSSING THE BRIDGEWATER CANAL AT SALE (BOUNDARY VIADUCT)

      1. 1.Specification

      2. 2.Type of Construction: three span composite steel and reinforced concrete...

      3. 3.Headroom: 4.8 metres above Normal Water Level.

    3. SCHEDULE 3 WITH KEY PLAN AND SITE PLAN

      PLANS AND SPECIFICATIONS FOR THE BRIDGE CROSSING THE RIVER MERSEY AT SALE

      1. 1.Points of commencement and termination: the bridge commences at a...

      2. 2.Type of Construction: three span composite steel and reinforced concrete...

      3. 3.Headroom: 12.0 metres above Normal Water Level.

    4. SCHEDULE 4 WITH KEY PLAN AND SITE PLAN

      PLANS AND SPECIFICATIONS FOR THE BRIDGE CROSSING THE RIVER MERSEY AT SALE (MERSEY SOUTH BRIDGE)

      1. 1.Points of commencement and termination: the bridge commences at a...

      2. 2.Type of Construction: two span composite steel and reinforced concrete...

      3. 3.Headroom: 6.8 metres minimum above Normal Water Level.

    5. SCHEDULE 2: KEY PLAN

    6. SCHEDULE 2: SITE PLAN

    7. SCHEDULES 3 AND 4: KEY PLAN

    8. SCHEDULE 3: SITE PLAN

    9. SCHEDULE 4: SITE PLAN

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources