The M60 Motorway (Improvement Between Junctions 5 and 8) Connecting Roads Scheme 1999

  1. Introductory Text

  2. 1.This Scheme may be cited as the M60 Motorway (Improvement...

  3. 2.In this Scheme: (a) all measurements of distance are measured...

  4. 3.The Secretary of State is authorised to provide the special...

  5. 4.The centre line of each of the special roads is...

  6. 5.Each of the special roads shall become a trunk road...

  7. 6.The Secretary of State is authorised to construct—

  8. Signature

    1. SCHEDULE 1

      ROUTES OF THE CONNECTING ROADS

      1. The routes of the connecting roads are as follows:

      2. Two routes to connect the connecting road referred to in...

      3. Two routes to connect the Motorway with the A56 Chester...

    2. SCHEDULE 2 WITH KEY PLAN AND SITE PLAN

      PLANS AND SPECIFICATIONS FOR THE BRIDGE CROSSING THE BRIDGEWATER CANAL AT SALE (BOUNDARY VIADUCT)

      1. 1.Specification

      2. 2.Type of Construction: three span composite steel and reinforced concrete...

      3. 3.Headroom: 4.8 metres above Normal Water Level.

    3. SCHEDULE 3 WITH KEY PLAN AND SITE PLAN

      PLANS AND SPECIFICATIONS FOR THE BRIDGE CROSSING THE RIVER MERSEY AT SALE

      1. 1.Points of commencement and termination: the bridge commences at a...

      2. 2.Type of Construction: three span composite steel and reinforced concrete...

      3. 3.Headroom: 12.0 metres above Normal Water Level.

    4. SCHEDULE 4 WITH KEY PLAN AND SITE PLAN

      PLANS AND SPECIFICATIONS FOR THE BRIDGE CROSSING THE RIVER MERSEY AT SALE (MERSEY SOUTH BRIDGE)

      1. 1.Points of commencement and termination: the bridge commences at a...

      2. 2.Type of Construction: two span composite steel and reinforced concrete...

      3. 3.Headroom: 6.8 metres minimum above Normal Water Level.

    5. SCHEDULE 2: KEY PLAN

    6. SCHEDULE 2: SITE PLAN

    7. SCHEDULES 3 AND 4: KEY PLAN

    8. SCHEDULE 3: SITE PLAN

    9. SCHEDULE 4: SITE PLAN