SCHEDULE 2 WITH KEY PLAN AND SITE PLANPLANS AND SPECIFICATIONS FOR THE BRIDGE CROSSING THE BRIDGEWATER CANAL AT SALE (BOUNDARY VIADUCT)
Specification
1. Points of commencement and termination: the bridge commences at a point approximately 210 metres South of Barfoot Bridge over the River Mersey. The bridge terminates at a point approximately 310 metres South of Barfoot Bridge over the River Mersey.
2. Type of Construction: three span composite steel and reinforced concrete bridge deck supported on in-situ reinforced concrete substructure. Intermediate support columns with crossheads.
3. Headroom: 4.8 metres above Normal Water Level.