SCHEDULE 3 WITH KEY PLAN AND SITE PLANPLANS AND SPECIFICATIONS FOR THE BRIDGE CROSSING THE RIVER MERSEY AT SALE

1.  Points of commencement and termination: the bridge commences at a point approximately 200 metres North-east of Crossford Bridge on the A56, Chester Road. The bridge terminates at a point approximately 270 metres North-east of Crossford Bridge on the A56, Chester Road.

2.  Type of Construction: three span composite steel and reinforced concrete bridge deck supported on in-situ reinforced concrete substructure. Intermediate support columns with crossheads.

3.  Headroom: 12.0 metres above Normal Water Level.