PART IIWORKS PROVISIONS
Principal powers
Power to deviate5
1
In constructing or maintaining the scheduled works, the undertaker may—
a
deviate laterally from the lines or situations shown on the works plans within the limits of deviation relating to that work shown on those plans; and
b
deviate vertically from the levels shown on the deposited sections—
i
to any extent not exceeding 3 metres upwards; and
ii
to any extent downwards.
2
The undertaker may, in constructing and maintaining the scheduled works, provide within the limits of deviation for those works such number of lines of rails and sidings as may be necessary or expedient.