Search Legislation

The Weighing Equipment (Automatic Rail-weighbridges) Regulations 2003

 Help about what version

What Version

 Help about advanced features

Advanced Features

Changes over time for: Section 2

 Help about opening options

Alternative versions:

Changes to legislation:

There are currently no known outstanding effects for the The Weighing Equipment (Automatic Rail-weighbridges) Regulations 2003, Section 2. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

InterpretationE+W+S

2.—(1) In these Regulations—

the 1985 Act” means the Weights and Measures Act 1985;

accuracy class” means the accuracy class, in respect of an automatic rail-weighbridge, determined by the Secretary of State and specified in the certificate of approval, being one of the accuracy classes 0.2, 0.5, 1 or, for the purposes of weighing waste (as defined in Schedule 3) only, 2: provided always that, except when used for the purposes of weighing waste, the accuracy class in respect of that automatic rail-weighbridge may be different for wagon weighing to that for train weighing;

automatic rail-weighbridge” means an instrument which—

(i)

is used to determine the mass of a railway wagon when it is weighed in motion by using the action of gravity without the intervention of an operator;

(ii)

follows a predetermined programme of automatic processes characteristic of the instrument; and

(iii)

has one or more load receptors inclusive of rails for conveying railway vehicles and includes such of the other components described in Schedule 1 as are specified in the certificate of approval;

certificate of approval” means a certificate of approval of a pattern of an automatic rail-weighbridge granted or renewed by the Secretary of State under section 12 of the 1985 Act;

control instrument” means a non-automatic weighing instrument used to determine the mass of a reference wagon;

initial verification testing” means testing in accordance with the provisions of regulation 6(c);

instrument” has the same meaning as that for automatic rail-weighbridge;

load receptor” means the part of the weigh zone that is intended to receive the load and which realises a change in the balance of the automatic rail-weighbridge when a load is placed upon it; and “multiple load receptors” means two or more load receptors placed in series or in parallel that are used as a single load receptor for weighing a wagon that is entirely supported on the load receptors;

maximum capacity” means the largest load which the automatic rail-weighbridge is designed to weigh-in-motion before totalising;

maximum wagon weight” means the largest in-motion load which the automatic rail-weighbridge is approved to weigh for a particular site;

minimum capacity” means the load below which a weighing-in-motion result before totalising may be subject to an excessive relative error;

minimum wagon weight” means the wagon weight (when the wagon is unloaded) below which a weighing-in-motion result may be subject to an excessive relative error;

OIML R 106” means the International Recommendation OIML R 106 of the Organisation Internationale de Métrologie Légale relating to automatic rail-weighbridges (Edition 1997 (E));

prescribed limits of error” has the meaning set out in regulation 9(3);

reference wagon” means a railway goods vehicle that is recognised by the automatic rail-weighbridge as a vehicle to be weighed being—

(a)

of known weight;

(b)

typical of those to be used for weighing on the automatic rail-weighbridge;

and which has been selected for the purposes of in-motion testing;

scale interval” or “d” means a value expressed in units of mass for weighing-in-motion that is the difference between—

(a)

the values corresponding to two consecutive scale marks for analogue indication; or

(b)

two consecutive indicated or printed values for digital indication;

scale interval for stationary load” means the scale interval used for static tests;

the stamp” or “verification mark” means the prescribed stamp M1;

total train” means a number of coupled wagons whose totalised weight is to be obtained;

wagon” means a loaded or unloaded railway goods vehicle that is recognised by the automatic rail-weighbridge as a vehicle to be weighed;

weighing-in-motion” means weighing objects that are in motion; and

weigh zone” means the zone in which a wagon must be located when it is to be weighed.

(2) Any expression or procedure which is not defined in these Regulations and is used both in these Regulations and OIML R 106 shall bear the same meaning as in OIML R 106.

Marginal Citations

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources