xmlns:atom="http://www.w3.org/2005/Atom"

SCHEDULE 4CONFORMITY ASSESSMENT PROCEDURES

(This Schedule substantially reproduces the provisions of Part 1 of Annex IV of the Transportable Pressure Equipment Directive)

Module G—EC unit verification

3.  The technical documentation must enable the conformity of the transportable pressure equipment with the relevant requirements of Part 4 of these Regulations to be assessed and the design, manufacture and operation of the transportable pressure equipment to be understood.

The technical documentation must contain: