PART 3STREETS
Temporary stopping up of public rights of wayI111
The undertaker may, in connection with the carrying out of the authorised development, temporarily stop up each of the public rights of way specified in column (2) of Schedule 4 (public rights of way to be temporarily stopped up) to the extent specified in column (3), by reference to the letters shown on the rights of way plan.