Requirement 5
1. Maximum parameters for buildings and structures are set out at table 6.
2. The finished ground level in respect of Work No. 1A, Work No. 1C and Work No. 1E may be higher than 2.8 metres above ordinance datum (AOD) but in all cases the maximum heights measured AOD shall not exceed the measurement in column 5 of table 6.
3. Maximum parameters of the A18 Gatehouse building (Work No. 8B) are set out in table 7.
4. Maximum parameters for length (m), width (m) or diameter (m) exclude external support structures such as (but not limited to) ladders, platforms, external piping and structural supports.
(1) Component | (2) Length (m) | (3) Width (m) or diameter (m) | (4) Height (m) above ground level (AGL) (in the case that the finished ground level is 2.8m AOD) | (5) Height (M) AOD (in all cases) |
---|---|---|---|---|
Gas Turbine Hall (Work No. 1A) | 22 | 50 | 31.8 | 34.6 |
Steam Turbine Hall (Work No. 1A) | 50 | 40 | 34.8 | 37.6 |
HRSG Building (Work No. 1A) | 28 | 50 | 55.8 | 58.6 |
Absorber (Work No. 1C) (in the case that a single absorber is developed) | 16 (Note 4) | 43 (Note 4) | 98.8 | 101.6 |
Absorber Stack (Work No. 1C) (in the case that a single absorber is developed) | - | 6.7 | 104.8 | 107.6 |
Twin Absorbers (Work No. 1C) (in the case that two absorbers are developed) | - | 19.0 (Note 4) | 80 | 82.8 |
Twin Absorber Stacks (Work No. 1C) (in the case that two absorbers are developed) | - | 6.7 | 95.5 | 98.3 |
HRSG Stack (Work No. 1A) | - | 8.0 | 84.8 | 87.6 |
Carbon Dioxide stripper (Work No. 1C) | - | 15.0 (Note 4) | 63 | 65.8 |
(1) Component | (2) Length (m) | (3) Width (m) | (4) Height (m) above ground level (AGL) | (5) Height (m) AOD |
---|---|---|---|---|
A18 Gatehouse (Work No. 8B) | 6 | 7 | 4 | 5.5 |
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: