The A66 Northern Trans-Pennine Development Consent Order 2024

A 2.4 kilometre length of new A66 trunk road

17.  A 2.4 km length of new road to be constructed and classified (as identified in sub-paragraphs (a) to (d) below) as part of the A66 trunk road

(a)commencing from a point 610 metres to the west of Lane End, then departing from the existing alignment in a south-easterly direction and continuing in a generally easterly direction to a point 370 metres west of Lane End;

(b)passing beneath the new bridge at the Junction at Center Parcs and then continuing in an easterly direction for a distance of 725 metres to a point where it joins the existing A66 carriageway at a point 315 metres east of Lane End;

(c)then departing from the existing A66 alignment in a north easterly direction commencing from a point 315 metres to the east of Lane End in a generally north-easterly direction for a distance of 920 metres; and

(d)continuing eastwards for a distance of 760 metres to a point where it joins the existing A66 carriageway at a point 405 metres to the north-west of the existing westbound junction at Temple Sowerby,

identified by a red line on the classification of roads plan for scheme 03.