SCHEDULES

Section 4.

SCHEDULE 1Description of works referred to in section 4 of this Act

In the city of Westminster—

  • Work No. 1 A pedestrian subway, incorporating an existing staircase, commencing on the southern side of Bridge Street and terminating at the western corner of Victoria Embankment and Bridge Street.

  • Work No. 2 A pedestrian subway commencing at the corner of Bridge Street and Parliament Street and terminating in Westminster station by a junction with the proposed ticket hall for the extension of the Company’s Jubilee Line beneath a point 22 metres north-east of the junction of Canon Row with Bridge Street.

  • Work No. 3A A ventilation subway and shaft commencing beneath the corner of Great George Street and St. Margaret Street by a junction with the proposed westbound running tunnel for the extension of the Jubilee Line and terminating in the north-western corner of New Palace Yard at a point 30 metres south of the junction of Canon Row with Bridge Street.

  • Work No. 3B A ventilation subway and shaft commencing beneath the intersection of Bridge Street, Great George Street and St. Margaret Street by a junction with the proposed eastbound running tunnel for the extension of the Jubilee Line and terminating in the north-western corner of New Palace Yard at a point 8 metres west of the termination of Work No. 3A.

  • Work No. 4A A ventilation subway commencing beneath Westminster station by a junction with a proposed fan room to provide ventilation to the Company’s Circle and District Lines and the proposed extension of the Jubilee Line at a point 50 metres north-west of the junction of Victoria Embankment with Bridge Street and terminating by a junction with Work No. 4B beneath a point in Canon Row 35 metres north of the junction of that road with Bridge Street.

  • Work No. 4B A ventilation subway commencing at a point in Canon Row 26 metres north of the junction of that road with Bridge Street and terminating at a point in the basement of No. 1 Canon Row 30 metres south of the junction of that road with Derby Gate.

Sections 5 and 7.

SCHEDULE 2Streets referred to in sections 5 and 7 of this Act

In this Schedule “the limits” means the limits of deviation or the limits of land to be used or the limits of land to be acquired or used shown on the deposited plans, as the case may be.

AreaName of streetExtent of opening up
(1)(2)(3)
City of WestminsterBridge StreetWithin the limits
Parliament StreetWithin the limits
Canon RowBetween points A and B
Great George StreetWithin the limits
London borough of Lambeth
  • Alaska Street }

  • Cornwall Road }

  • Exton Street }

Within the limits

Section 11.

SCHEDULE 3Buildings or structures referred to in section 11 of this Act

Part I

A. Buildings authorised to be demolished

  • Vaults below pavement forming part of No. 1 Parliament Street (including Nos. 11 and 12 Bridge Street) and No. 10 Bridge Street (St. Stephen’s Tavern) Grade II.

  • Offices at No. 8 Alaska Street, Lambeth.

B. Temporary removal and reinstatement of buildings

  • Wall and railings of New Palace Yard (within the limits of deviation of Works Nos. 3A and 3B).

  • Lamp standards flanking carriage drive—New Palace Yard.

Part IIBuildings authorised to be altered or extended

BuildingPurpose of alteration or extension
(1)(2)
North wall of Speaker’s Green (within the limit of deviation of Work No.1)To form a new opening for a pedestrian subway; and such preventative work and work of repair as is necessary to maintain or restore the character of the building as a building of special architectural or historic interest.
Gate and stairs to Speaker’s GreenSuch alterations as are necessary to permit the stairs to be used as a public staircase.
Wall and railings of New Palace Yard (within the limits of deviation of Works Nos. 3A and 3B)Such preventative work and work of repair as is necessary to maintain or restore the character of the building as a building of special architectural or historic interest.
No. 1 Canon RowSuch alterations as are necessary to provide for ventilation of the Company’s railways at Westminster station.
Embankment Wall, WestminsterSuch alterations as are necessary to form a ventilation opening in the stone paving of the footway of Victoria Embankment.

Section 14 (2).

SCHEDULE 4Land referred to in section 14 (2) of this Act

AreaNo. on deposited plansPurpose for which land may be used
(1)(2)(3)
London borough of Lambeth1, 2 and 3Ventilation and emergency escape shaft and traction substation.
London borough of Southwark1Emergency escape route, cable duct and equipment access route.
2Ventilation shaft and emergency escape shaft.
3 and 4Ventilation shafts.

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill