Chwilio Deddfwriaeth

The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020

 Help about what version

Pa Fersiwn

 Help about advanced features

Nodweddion Uwch

Changes over time for: SCHEDULE 1

 Help about opening options

Alternative versions:

Changes to legislation:

There are currently no known outstanding effects for the The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020, SCHEDULE 1. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Article 3

SCHEDULE 1E+WAUTHORISED DEVELOPMENT

Commencement Information

I1Sch. 1 in force at 14.4.2020, see art. 1

A nationally significant infrastructure project, as defined in sections 14(1)(b) and 16 M1 of the 2008 Act and associated development within the meaning of section 115(2) M2 of the 2008 Act comprising—

Marginal Citations

M1Relevant amendments to section 16 were made by S.I. 2010/277, S.I. 2013/1479 and S.I.2017/1012.

M2Relevant amendments to section 115(2) were made by the Housing and Planning Act 2016, section 160(1) and (3).

OSWESTRY SUBSTATION (Associated Development)E+W

Work No. 1 Works at Oswestry substation as shown on sheet 1 of the works plans comprising the installation of electrical switchgear and associated equipment (including 132kV cable sealing ends, isolator and associated busbar and 132kV outdoor circuit breaker) and 132kV underground cable.

132kV UNDERGROUND CABLE (Associated Development)E+W

Work No. 2 the construction and installation and keeping of a 132kV underground cable and fibre optic cable 1.2km in length from Oswestry substation connecting to Work No.3 at a terminal structure at Long Wood (grid reference: SJ 3113229877) comprising three 132kV single core cables together with a fibre optic cable installed in 200mm diameter polyethylene ducts laid in trefoil formation together with the installation of cable protection tiles above at a depth of approximately 1.4m to ensure a final minimum depth of 975mm and as shown on sheet 1 of the works plans; and

(a)site preparation works and site clearance (including fencing, felling and vegetation removal);

(b)earthworks (including soil stripping and storage and site levelling);

(c)carrying out surveys or taking soil samples;

(d)establishment of temporary laydown and storage areas, temporary vehicle parking and construction fencing;

(e)cutting down, uprooting, topping or lopping of trees or shrubs or cutting back their roots;

(f)reinstatement hedgerow planting;

(g)establishment of temporary means of access and trackways;

(h)drainage works;

(i)ramps, means of access, footpaths and bridleways;

(j)works to alter the position of apparatus, including mains, sewers, drains and cables;

(k)works to alter the course of, or otherwise interfere with a watercourse;

(l)works to mitigate any adverse effects of the construction, maintenance or operation of the authorised development;

(m)works for the benefit or protection of land affected by the authorised development;

(n)the removal, disposal or re-siting of apparatus;

(o)open trench excavations and directional drilling.

132kV OVERHEAD LINE (Nationally Significant Infrastructure Project)E+W

Work No. 3 the construction and installation and keeping of a 132kV electric line above ground of 21.3 km in length commencing in the vicinity of Long Wood (grid ref: SJ 3113229877) and following an easterly direction passing to the south of Whittington, north of Rednal, to the north of Lower Hordley, south of Cockshutt, and passing to the south of Loppington terminating at a gantry at Wem substation more particularly shown on sheets 1 to 16 of the works plans. This comprises a three phase 132kV line (three wires/conductors and fibre optic cable) mounted on 176 trident wood pole structures extending up to 18m high and terminal ends and cable sealing ends at terminal poles and all modifications required and any support to facilitate a change in angle of the electric line; and—

(a)site preparation works and site clearance (including fencing, felling and vegetation removal);

(b)earthworks (including soil stripping and storage and site levelling);

(c)carrying out surveys or taking soil samples;

(d)establishment of temporary laydown and storage areas, temporary vehicle parking and construction fencing;

(e)cutting down, uprooting, topping or lopping of trees or shrubs or cutting back their roots;

(f)reinstatement hedgerow planting;

(g)establishment of temporary means of access and trackways;

(h)drainage works;

(i)works to alter ramps, means of access, footpaths and bridleways;

(j)works to alter the position of apparatus, including mains, sewers, drains and cables;

(k)works to alter the course of, or otherwise interfere with a watercourse;

(l)works to mitigate any adverse effects of the construction, maintenance or operation of the authorised development;

(m)works for the benefit or protection of land affected by the authorised development;

(n)the provision of overhead electricity cables underground ducting and placing electricity cables below ground to connect to Work No.2 and Work No.5;

(o)establishment of winching points and the installation of scaffolding; and

(p)a welfare unit and a security cabin at laydown area number 7.

LOWER VOLTAGE DIVERSIONS (Associated Development)E+W

Work No.4A the removal of existing 11kV and 33kV overhead lines between Oswestry and Wem as shown on sheets 2, 3, 7, 8, 12, 13, 14 and 16 of the works plans and all associated wood poles, conductors, insulators and fittings and—

(a)site preparation works and site clearance (including fencing, felling and vegetation removal);

(b)earthworks (including soil stripping and storage and site levelling);

(c)carrying out surveys or taking soil samples;

(d)establishment of temporary laydown and storage areas, temporary vehicle parking and construction fencing;

(e)cutting down, uprooting, topping or lopping of trees or shrubs or cutting back their roots;

(f)reinstatement hedgerow planting;

(g)establishment of temporary means of access and trackways;

(h)drainage works;

(i)works to alter ramps, means of access, footpaths and bridleways;

(j)works to alter the position of apparatus, including mains, sewers, drains and cables;

(k)works to alter the course of, or otherwise interfere with a watercourse;

(l)works to mitigate any adverse effects of the construction, maintenance or operation of the authorised development;

(m)works for the benefit or protection of land affected by the authorised development; and

(n)establishment of winching points and the installation of scaffolding.

Work No.4B the undergrounding of 11kV and 33kV cables between Oswestry and Wem as shown on sheets 1, 2, 3, 7, 8, 9, 12, 13, 14 and 16 of the works plans and—

(a)site preparation works and site clearance (including fencing, felling and vegetation removal);

(b)earthworks (including soil stripping and storage and site levelling);

(c)carrying out surveys or taking soil samples;

(d)establishment of temporary laydown and storage areas, temporary vehicle parking and construction fencing;

(e)cutting down, uprooting, topping or lopping of trees or shrubs or cutting back their roots;

(f)reinstatement hedgerow planting;

(g)establishment of temporary means of access and trackways;

(h)drainage works;

(i)works to alter ramps, means of access, footpaths and bridleways;

(j)works to alter the position of apparatus, including mains, sewers, drains and cables;

(k)works to alter the course of, or otherwise interfere with a watercourse;

(l)works to mitigate any adverse effects of the construction, maintenance or operation of the authorised development;

(m)works for the benefit or protection of land affected by the authorised development;

(n)establishment of winching points and the installation of scaffolding;

(o)works to install the means to connect the lower voltage overhead line (Work No.4A) with the new section of lower voltage underground cable.

WEM SUBSTATION (Associated Development)E+W

Work No.5 Works at Wem substation as shown on sheet 16 of the works plans comprising the installation of a 132kV gantry, isolator, associated busbar, a 132kV to 33kV transformer, 33kV cable and a 33kV circuit breaker and—

(a)site preparation works and site clearance (including fencing);

(b)levelling;

(c)creation of hard stoned area.

Yn ôl i’r brig

Options/Help

Print Options

Close

Mae deddfwriaeth ar gael mewn fersiynau gwahanol:

Y Diweddaraf sydd Ar Gael (diwygiedig):Y fersiwn ddiweddaraf sydd ar gael o’r ddeddfwriaeth yn cynnwys newidiadau a wnaed gan ddeddfwriaeth ddilynol ac wedi eu gweithredu gan ein tîm golygyddol. Gellir gweld y newidiadau nad ydym wedi eu gweithredu i’r testun eto yn yr ardal ‘Newidiadau i Ddeddfwriaeth’.

Gwreiddiol (Fel y’i Deddfwyd neu y’i Gwnaed): Mae'r wreiddiol fersiwn y ddeddfwriaeth fel ag yr oedd pan gafodd ei deddfu neu eu gwneud. Ni wnaed unrhyw newidiadau i’r testun.

Close

Gweler y wybodaeth ychwanegol ochr yn ochr â’r cynnwys

Rhychwant ddaearyddol: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Dangos Llinell Amser Newidiadau: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Dewisiadau Agor

Dewisiadau gwahanol i agor deddfwriaeth er mwyn gweld rhagor o gynnwys ar y sgrin ar yr un pryd

Close

Rhagor o Adnoddau

Gallwch wneud defnydd o ddogfennau atodol hanfodol a gwybodaeth ar gyfer yr eitem ddeddfwriaeth o’r tab hwn. Yn ddibynnol ar yr eitem ddeddfwriaeth sydd i’w gweld, gallai hyn gynnwys:

  • y PDF print gwreiddiol y fel deddfwyd fersiwn a ddefnyddiwyd am y copi print
  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • slipiau cywiro
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill
Close

Llinell Amser Newidiadau

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

Rhagor o Adnoddau

Defnyddiwch y ddewislen hon i agor dogfennau hanfodol sy’n cyd-fynd â’r ddeddfwriaeth a gwybodaeth am yr eitem hon o ddeddfwriaeth. Gan ddibynnu ar yr eitem o ddeddfwriaeth sy’n cael ei gweld gall hyn gynnwys:

  • y PDF print gwreiddiol y fel gwnaed fersiwn a ddefnyddiwyd am y copi print
  • slipiau cywiro

liciwch ‘Gweld Mwy’ neu ddewis ‘Rhagor o Adnoddau’ am wybodaeth ychwanegol gan gynnwys

  • rhestr o newidiadau a wnaed gan a/neu yn effeithio ar yr eitem hon o ddeddfwriaeth
  • manylion rhoi grym a newid cyffredinol
  • pob fformat o’r holl ddogfennau cysylltiedig
  • dolenni i ddeddfwriaeth gysylltiedig ac adnoddau gwybodaeth eraill