Search Legislation

The Shipbuilding and Ship-repairing Regulations 1960

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format. The electronic version of this UK Statutory Instrument has been contributed by Westlaw and is taken from the printed publication. Read more

Regulation 3 (2)

FIRST SCHEDULEMANNER IN WHICH, FOR THE PURPOSE OF THE DEFINITION OF “LEAD PAINT”, MATERIAL IS TO BE TREATED WITH A VIEW TO ASCERTAINING THE PERCENTAGE OF COMPOUND OF LEAD PRESENT

The material is to be treated with suitable solvents to remove the oil, varnish and other media, and the residue to be dried at one hundred degrees Centigrade and thoroughly mixed. A weighed quantity of this extracted, dried and mixed material is to be continuously shaken for one hour, at the common temperature, with one thousand times its weight of an aqueous solution of hydrochloric acid containing 0·25 per cent. by weight of hydrogen chloride. This solution is thereafter to be allowed to stand for one hour and then filtered. The lead salt contained in the clear filtrate is then to be precipitated as lead sulphide and weighed as lead sulphate.

Regulations 34 (1), 36 (1) and 40

SECOND SCHEDULEMANNER OF TEST AND EXAMINATION BEFORE TAKING ANY CHAIN, WIRE ROPE, LIFTING APPLIANCE OR LIFTING GEAR INTO USE

(a)

Every winch, and every derrick with the whole of the gear accessory thereto, shall be tested with a proof load which shall not be less than the following—

Safe working load Proof load
Under 20 tons 25 per cent.in excess of the safe working load
20–50 tons 5 tons
over 50 tons 10 per cent.

In the case of a derrick with its accessory gear the proof load shall be applied as follows:—

(i)

where reasonably practicable by hoisting movable weights; or

(ii)

in other cases by maintaining the load by means of an accurate spring or hydraulic balance or similar device for a period of not less than five minutes. Where movable test weights are used the derrick shall be swung, with the load suspended, as far as possible in both directions. Where a spring or hydraulic balance or similar device is employed it shall be sufficient if the proof load is applied with the derrick swung as far as practicable first in one direction and then in the other. In each case the derrick shall be tested at the smallest angle to the horizontal at which it will operate and this angle shall be stated in the certificate of the test.

(b)

Every crane, crab, sheer-legs, teagle, transporter or runway, with its accessory gear, shall be tested with a proof load which shall not be less than the following—

Safe working load Proof load
Under 20 tons 25 per cent.in excess of the safe working load
20–50 tons 5 tons
over 50 tons 10 per cent.

In the case of a crane having a variable radius it shall be tested with a proof load applied at the maximum and minimum working radii. At each such radius the crane shall be swung as far as possible in both directions with the corresponding proof load suspended. In the case of hydraulic cranes where, owing to the limitation of pressure it is impossible to hoist a load 25 per cent. in excess of the safe working load, it shall be sufficient to hoist the greatest possible load.

(c)

Every article of lifting gear (whether it is accessory to any lifting appliance or not) and every pulley block other than a pulley block specially constructed for use with a crane to which it is permanently attached, and every chain shall be tested with a proof load at least equal to that shown against it in the following table:—

Article of gear Safe working load Proof load
Chain sling Twice the safe working load
Rope sling
Plate clamp
Ring
Link
Hook (other than a ramshorn hook)
Shackle
Swivel
Eye-bolt
Ramshorn hook Under 50 tons Twice the safe working load
50 tons to 100 tonsSafe working loads plus 50 tons
Over 100 tons One and a half times the safe working load
Pulley blocks
Single sheave block Four times the safe working load
Multiple sheave block with safe working load up to and including 20 tons Twice the safe working load
Multiple sheave block with safe working load over 20 tons up to and including 40 tons 20 tons in excess of the safe working load
Multiple sheave block with safe working load over 40 tons One and a half times the safe working load
Chains (other than calibrated load chains) Twice the safe working load
Calibrated load chains One and a half times the safe working load
(d)

After being tested as aforesaid, every lifting appliance with the whole of the gear accessory thereto, every article of lifting gear and every chain shall be examined, and the sheaves and the pins of the pulley blocks shall be removed for the purpose of the examination, to see that no part is injured or permanently deformed by the test.

(e)

In the case of wire ropes, a sample shall be tested to destruction.

Regulation 79 (3)

THIRD SCHEDULEEQUIPMENT OF AMBULANCE ROOMS

(1) A glazed sink with hot and cold water available during working hours.

(2) A table with smooth top.

(3) Means for sterilising instruments.

(4) A supply of suitable dressings, bandages and splints.

(5) A couch.

(6) A stretcher.

(7) Blankets and hot-water bottles.

(8) A foot bath.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources