- Latest available (Revised)
- Original (As made)
This is the original version (as it was originally made).
PART II STRENGTH, CONSTRUCTION AND WATERTIGHT SUBDIVISION
PART III CLOSING OF OPENINGS IN HULLS AND WATERTIGHT BULKHEADSBELOW THE BULKHEAD DECK
PART IV CLOSING OF OPENINGS IN ENCLOSED SUPERSTRUCTURES AND IN BULKHEADS ABOVE THE BULKHEAD DECK
PART VII ELECTRICAL EQUIPMENT AND INSTALLATIONS
44.Main source of electrical power and main switchboards: ships of Class III
45.Lighting systems Requirements for ships constructed on or after 1st September 1984
46.Emergency source of electrical power and emergency switchboards: ships of Class III
47.General precautions against shock, fire and other hazards
PART VIII BOILERS AND MACHINERY
58.Oil systems for lubricating, heating, cooling and control
59.Machinery controls Requirements for ships constructed on or after 1st September 1984
61.Ventilation systems in machinery spaces Requirements for ships constructed on or after 1st September 1984
62.Protection against noise Requirements for ships constructed on or after 1st September 1984
PART X MISCELLANEOUS REQUIREMENTS FOR SHIPS WITH SPECIAL CATEGORY OR RO-RO CARGO SPACES
PART XI EQUIVALENTS, PENALTIES, DETENTION ANDINVALID STABILITY INFORMATION
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include: