The Network Rail (East West Rail) (Bicester to Bedford Improvements) Order 2020

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

SCHEDULES

Article 2

SCHEDULE 1SCHEDULED WORKS

In the County of Oxfordshire, District of Cherwell and in the County of Buckinghamshire, District of Aylesbury Vale—

Work No.1 – A railway (8,185 metres in length), on the course of the existing railway (Oxford to Bletchley line), commencing by a junction 300 metres east of the bridge carrying the Chiltern Line railway over said Oxford to Bletchley line and terminating at a point 26 metres eastwards of the bridge carrying Main Street Charndon over the existing railway.

In the County of Buckinghamshire, District of Aylesbury Vale and in the District of Milton Keynes—

Work No.2 – A railway (18,827 metres in length), on the course of the existing railway (Oxford to Bletchley line), commencing at a point 209 metres west of the intersection of existing Queen Catherine Road and the existing railway and terminating at a point 183 metres west of the intersection of Saxon Street and the existing railway (Bletchley to Bedford line).

In the District of Milton Keynes—

Work No.3 – A railway (358 metres in length) on the course of the existing railway (Denbigh Hall Flyover line), commencing at a junction with Work No.2 at a point 18,297 metres east along its commencement and terminating at a point 358 metres north of its commencement.

In the County of Oxfordshire, District of Cherwell—

Work No.4 – A footbridge carrying Jarvis’ Lane Footpath over Work No.1 commencing at a point 326 metres north-west of the junction of Charbridge Way with the A4421 Charbridge Lane and terminating at a point 25 metres north of its commencement.

Work No.5 – Realignment of the A4421 Charbridge Lane (including a bridge over Work No.1) commencing at a point 25 metres north of the junction of Charbridge Way with the A4421 Charbridge Lane and terminating at the roundabout junction with Bicester Road.

Work No.6 – Realignment of The Tythe Barn rear access road, commencing at a point 124 metres north-east of the junction of Charbridge Way with the A4421 Charbridge Lane and terminating at a point 113 metres south-west of its commencement.

Work No.7 – Temporary diversion of the A4421 Charbridge Lane, commencing at a point 120 metres north of the junction of Charbridge Way with the A4421 Charbridge Lane and terminating at a point 15 metres south of the roundabout junction with Bicester Road.

Work No.8 – Temporary diversion of the A4421 Charbridge Lane, commencing at a point 23 metres south of the junction of Charbridge Way with the A4421 Charbridge Lane and terminating at a point 293 metres north of its commencement.

Work No.9 – Realignment of Manor farm access (including a bridge over Work No.1), commencing at a point 37 metres south-west of Launton Sports and Social Club building and terminating at a point 391 metres north-east of its commencement.

Work No.10 – A footbridge carrying Footpath 272/11/10 over Work No.1, commencing at a point 329 metres north of the junction of Footpath 272/11/10 with Footpath 272/12/10 and terminating at a point 33 metres north-west of its commencement.

Work No.11 – Realignment of Station Road (including a bridge over Work No.1), commencing at a point 47 metres north-east of the entrance to Upper Laurels Farm and terminating at a point 360 metres south-west of its junction with Bicester Road.

Work No.12 – An access road, forming an access to Station Cottage, commencing by a junction with Work No.11 at a point 143 metres north-east of the junction of Station Road with the entrance to Folly Cottage and terminating at a point 47 metres north of its commencement.

Work No.13 – An access road, commencing by a junction with Work No.11 at a point 78 metres south-east of Station Cottage and terminating at a point 104 metres south-east of its commencement.

In the County of Buckinghamshire, District of Aylesbury Vale—

Work No.14 – Realignment of Marsh Gibbon access (including a bridge over Work No.1), commencing at a point 70 metres north of the junction of Footpath MGI/5/1 with Footpath MGI/5/2 and terminating at a point 240 metres north of its commencement.

Work No.15 – A diversion of a high-pressure gas main, commencing at a point 269 metres north of the junction of Footpath MGI/5/1 with Footpath MGI/5/2 and terminating at a point 37 metres north-east of its commencement.

Work No.16 – A footbridge carrying footpaths POD/2/1 over Work No.1, commencing at a point 338 metres south of the junction of Footpath POD/3/1 with Footpath POD/2/1 and terminating at a point 45 metres south-east of its commencement.

Work No.17 – A footbridge carrying Footpaths TWY/2/2 and TWY/2/3 over Work No.1, commencing at a point 553 metres south of the junction of Footpath TWY/3/1 with Footpath TWY/2/2 and terminating at a point 17 metres south of its commencement.

Work No.18 – Realignment of Queen Catherine Road (including a bridge carrying the realigned road over the railway), commencing at a point 11 metres north-west of the junction of Queen Catherine Road with the entrance to Rectory Farm and terminating at a point 397 metres south-east of the junction of Buckingham Road with Queen Catherine Road.

Work No.19 – A road, forming an access to Railway Cottages, commencing by a junction with Work No.18 at a point 257 metres north-west of the junction of Queen Catherine Road with the entrance to railway cottages and terminating at a point 98 metres south-east of its commencement.

Work No.20 – A road, forming an access to the eastern fields, commencing by a junction with Work No.18 at a point 214 metres north-west of the junction of Queen Catherine Road with the entrance to Rectory Farm and terminating at a point 111 metres north-west of its commencement.

Work No.21 – A footbridge carrying Footpaths SCL/1/3 and MCL/8/1 over Work No.2, commencing at a point 205 metres north of Rectory Farm and terminating at a point 17 metres south of its commencement.

Work No.22 – A footbridge carrying the Footpaths MCL/4/1, MCL/6/1, MCL/4/2 and MCL/6/2 over Work No.2, commencing at a point 19 metres north-west of the junction of Footpath MCL/6/2 with Footpath MCL/4/2 and terminating at the said existing junction of those footpaths.

Work No.23 – Realignment of Sandhill Road, commencing at a point on that road 119 metres south-east of the bridge carrying the existing road over the existing railway and terminating at a point 269 metres north-west of its commencement. Work No.23 includes the reconstruction of the bridge carrying Sandhill Road over the existing railway.

Work No.24 – Realignment of the Littleworth Farm access road and Footpath MCL/2/1 and Footpath MCL/3/1 (including a bridge over Work No.2), commencing at a point 175 metres south-west of the entrance to the Verney Arms Hotel building on the existing Verney Road and terminating at a point 271 metres north-west of the junction of Footpath MCL/2/2 with Footpath MCL/3/2.

Work No.25 – Diversion of a high-pressure gas main, commencing at a point 247 metres north-west of existing Verney Junction level crossing and terminating at a point 72 metres east of its commencement.

Work No.25A– A bridge, carrying an access road over Claydon Brook, commencing at a point 276 metres north-west of the bridge carrying Verney Road over the existing railway (Oxford to Bletchley line) and terminating at a point 15 metres north-east of its commencement.

Work No.26 – A footbridge (being a replacement of the existing footbridge) carrying Footpaths WIP/6/9 and WIS/6/1 over Work No.2, commencing at a point 160 metres east of the bridge carrying Furze Lane over the existing railway (Oxford to Bletchley line) and terminating at a point 42 metres north of its commencement.

Work No.26A – A bridge, carrying an access road over Horwood Brook, commencing at a point 330 metres north-west of the bridge carrying Horwood Road under the existing railway (Oxford to Bletchley line) and terminating at a point 15 metres north of its commencement.

Work No.26B – A temporary bridge, carrying an access road over Horwood Brook, commencing at a point 124 metres south-west of the bridge carrying Horwood Road under the existing railway (Oxford to Bletchley line) and terminating at a point 15 metres north-east of its commencement.

Work No.27 – Realignment of the Moco Farm access road and Footpath SWA/17/1 (including a bridge over Work No.2), commencing at a point 138 metres south-west of the bridge carrying the existing Moco farm access road over the existing railway (Oxford to Bletchley line) and terminating at a point 332 metres west of the junction of Footpath SWA/17/1 and Footpath SWA/1/1.

Work No.28 – A footbridge carrying Footpaths SWA/1/1 and SWA/1/2 over Work No.2, commencing at a point 121 metres south-east of the junction of Footpath SWA/1/1 with Footpath SWA/17/1 and terminating at a point 17 metres north of its commencement.

Work No.28A – Diversion of Horwood Brook, commencing at a junction with Horwood Brook a point 242 metres north-east of the junction of Footpath SWA/1/1 with Footpath SWA/17/1 and terminating at a junction with Horwood Brook at a point 82 metres north-east of its commencement.

Work No.29 – A footbridge carrying Footpaths LHO/20/1 and MUR/13/1 over Work No.2, commencing at a point 56 metres north of the junction of Footpath LHO/20/1 with Byway MUR/18/2 and terminating at a point 46 meters north-west of its commencement.

Work No.30 – Realignment of Salden Lane (including a bridge over Work No.2), commencing at a point 273 metres south-west of the bridge carrying the existing Salden Wood access road over the existing railway (Oxford to Bletchley line) and terminating at a point 428 metres north of its commencement.

Work No.31 – Realignment of restricted byway MUR/15/1, commencing at a junction with Work No.30 and terminating at a point 377 metres north-east of its commencement.

Work No.32 – Diversion of a high-pressure gas main, commencing at a point 115 metres south-west of the crossing of the existing Salden Wood access road over the existing railway (Oxford to Bletchley line) and terminating at a point 73 metres north-east of its commencement.

In the County of Buckinghamshire, District of Milton Keynes—

Work No.32A – A temporary bridge carrying an access road over Water Eaton Road, commencing at a point 14 metres south-east of the viaduct carrying the existing railway (Oxford to Bletchley line) over Water Eaton Road and terminating at a point 12 metres north-east of its commencement.

Work No.33 – Realignment of Woodley’s Farm access road and Woburn Sands Footpath 002 (including a bridge over the existing railway - Bletchley to Bedford line), commencing at a point 517 metres north-west of the junction of Bow Brickhill Road with the existing Woodley’s Farm access road and terminating at a point 350 metres north-west of its commencement.

In the County of Bedfordshire, District of Central Bedfordshire—

Work No.34 – An access road, commencing at a point 16 metres north-west of Aspley Guise level crossing at a junction with Salford Road and terminating at a point 28 metres north-east of Berry Lane level crossing at a junction with Berry Lane.

Work No.35 – An access road, commencing at a point 39 metres north-east of Berry Lane level crossing at a junction with Berry Lane and terminating at a point 105 metres north of the bridge carrying the Bedford Road over the existing railway (Bletchley to Bedford line).

Work No.36 – An access road, commencing at a point 29 metres south-west of Long Leys level crossing and terminating at a point 653 metres south-east of its commencement at a junction with Bedford Road.

Work No.37 – Realignment of Marston Road (including a bridge over the existing railway - Bletchley to Bedford line), commencing at a point 44 metres east of the roundabout junction of The Lane with Marston Road and terminating at a point 595 metres north-east of its commencement.

In the County of Bedfordshire, District of Bedford—

Work No.38 – Realignment of Manor Road (including a bridge over the existing railway - Bletchley to Bedford line), commencing at a point 11 metres south-west of the Eastwood Cottage building and terminating at a point 550 metres north-west of its commencement and 478 metres south-east of the junction of Woburn Road with Manor Road.

Work No.39 – A footbridge carrying Footpaths KEU1B and KERA1A over the existing railway – (Bletchley to Bedford line), commencing at a point 52 metres north of Woburn Road level crossing level and terminating at a point 44 metres north of its commencement.

In the County of Buckinghamshire, District of Aylesbury Vale—

Work No.40 – A railway (6,899 metres in length), on the course of the existing railway (Aylesbury to Claydon Junction line), commencing at a point 381 metres north-west of the bridge carrying Station Road over the existing railway and terminating at a point 11 metres north-west of the bridge carrying Terry’s access road over the existing railway.

Work No.41 – A footbridge carrying Footpath WAD/3/5 over the Work No.40, commencing at a point 20 metres south-west of North Bucks Way level crossing and terminating at a point 27 metres north-east of its commencement and 15 metres north-west of North Bucks Way level crossing.

Work No.42 – Realignment of Lower Blackgrove Farm access road (including a bridge over Work No.40), commencing at a point 56 metres north-east of 3 Lower Blackgrove Farm Cottage building and terminating at a point 343 metres north-east of its commencement.

Work No.43 – A temporary bridge, carrying an access road over Fleet Marston brook, commencing at a point 91 metres south-west of the bridge carrying the A41 under the existing railway (Aylesbury to Claydon Junction line) and terminating at a point 21 metres east of its commencement.

Articles 6 and 22

SCHEDULE 2ACQUISITION OF LAND FOR ANCILLARY WORKS

(1)

Area

(2)

Number of land shown on the deposited plans

(3)

Purposes for which land may be acquired

In the County of Oxfordshire

In the District of Cherwell

0036, 0041Environmental mitigation.
0113Environmental mitigation.
0127, 0128, 0136, 0141Worksite and access for construction and maintenance and environmental mitigation.
0133Environmental mitigation.
0148Environmental mitigation.
0166Environmental mitigation.
0169Worksite and access for construction, environmental mitigation and utility diversions.
0185Environmental mitigation and utility diversions.
0192Worksite and access for construction.
0204, 0205Environmental mitigation.
0217Environmental mitigation.
0223, 0249Environmental mitigation utility diversions.
0224, 0227Maintenance compound.
0241, 0247, 0248Environmental mitigation and utility diversions.
0264Environmental mitigation.
0270, 0271Worksite and access for construction and maintenance.
0292Environmental mitigation.
0305Environmental mitigation.

In the County of Buckinghamshire

In the District of Aylesbury Vale

0324, 0329, 0332Environmental mitigation.
0336aEnvironmental mitigation.
0345Worksite and access for construction and maintenance.
0363Environmental mitigation.
0372, 0373Environmental mitigation.
0379, 0380Worksite and access for construction.
0382, 0383Worksite and access for construction.
0390Environmental mitigation.
0391, 0392Worksite and access for construction.
0393Worksite and access for construction.
0397Environmental mitigation.
0407, 0408, 0409, 0410Worksite and access for construction and maintenance and vehicle restraint barrier.
0414, 0415Reprofiling of embankments and vehicle restraint barrier.
0420, 0423Reprofiling of embankments and vehicle restraint barrier.
0438Environmental mitigation.
0450, 0455, 0459Worksite and access for construction and maintenance compound.
0476Environmental mitigation.
0480Environmental mitigation.
0491Environmental mitigation.
0494Environmental mitigation.
0524Environmental mitigation.
0526Environmental mitigation.
0532, 0534Worksite and access for construction and maintenance compound.
0533Environmental mitigation.
0578Environmental mitigation.
0585Worksite and access for construction and maintenance compound.
0613Environmental mitigation and creation of a new public right of way.
0622, 0623, 0628, 0630Worksite and access for construction and maintenance, environmental Mitigation and vehicle restraint barrier.
0624, 0626Environmental mitigation.
0635Environmental mitigation.
0644Environmental mitigation.
0646Environmental mitigation and creation of a new public right of way.
0653Environmental mitigation.
0663Environmental mitigation.
0677Environmental mitigation.
0681, 0683Environmental mitigation.
0713Worksite and access for construction and maintenance compound.
0717, 0724Environmental mitigation.
0738Environmental mitigation.
0745Environmental mitigation.
0756Environmental mitigation.
0786aEnvironmental mitigation.
0787Environmental mitigation.
0809Worksite and access for construction and maintenance.
0823Environmental mitigation.
0834Environmental mitigation.
0884aWorksite and access for construction and maintenance.
0868Worksite and access for construction, a maintenance compound and environmental mitigation.
0904, 0907, 0909Worksite and access for construction and maintenance compound.
0911, 0917, 0921, 0930Environmental mitigation and access for maintenance.
0912aWorksite and access for construction and maintenance.
0928Environmental mitigation.
0934Environmental mitigation.
0945, 0951Worksite and access for construction and maintenance compound.
0948, 0954, 0955Environmental mitigation.
0953, 0956Worksite and access for construction and maintenance, environmental mitigation and vehicle restraint barrier.
0963Environmental mitigation.
0965Environmental mitigation.
0977, 0978Worksite and access for construction and maintenance.
0981Environmental mitigation.
0986, 0987, 0993Environmental mitigation.

In the County of Buckinghamshire

In the District of Milton Keynes

1029, 1032, 1033Environmental mitigation.
1056Worksite and access for construction and environmental mitigation.
1101, 1102, 1104, 1105, 1108, 1110, 1111Worksite and access for construction and creation of a new public right of way.
1121Environmental mitigation.
1127Extension of platforms.
1131Worksite and access for construction and permanent access to station.
1140, 1144Worksite and access for construction and environmental mitigation.

In the County of Bedfordshire

In the District of Central Bedfordshire

1152Environmental mitigation.
1154Environmental mitigation.
1163, 1163a, 1163b, 1163c, 1163dExtinguishment of level crossing and worksite and access for construction.
1165, 1165a, 1165b, 1165c, 1165dExtinguishment of level crossing and worksite and access for construction.
1171Environmental mitigation.
1195Environmental mitigation.
1204, 1208, 1212Extension of platforms.
1225Station improvements.
1238,1238a, 1238bExtinguishment of level crossing.
1255Environmental mitigation.
1257Extinguishment of level crossing.
1270Environmental Mitigation.
1276, 1281Environmental mitigation and worksite and access for construction.
1287Worksite and access for construction and environmental mitigation.
1292Environmental mitigation.

In the County of Bedfordshire

In the District of Bedford

1299, 1300Environmental mitigation.
1311Worksite and access for construction.
1319Environmental mitigation.
1320Worksite and access for construction.
1333, 1333bWorksite and access for construction.

In the County of Buckinghamshire

In the District of Aylesbury Vale

1349Provision of structure for environmental mitigation
1365Environmental mitigation.
1370Worksite and access for construction and maintenance and vehicle restraint barrier.
1372Worksite and access for construction and maintenance compound.
1374Worksite and access for construction and maintenance and vehicle restraint barrier.
1387, 1391, 1393Worksite and access for construction.
1388Reprofiling of embankments and vehicle restraint barrier.
1400Environmental mitigation.
1409Environmental mitigation.
1422, 1424Worksite and access for construction and maintenance compound.
1427Environmental mitigation.
1444Environmental mitigation and worksite and access for construction.
1445Environmental mitigation and worksite and access for construction.
1449Environmental mitigation.
1456Environmental mitigation.
1465Environmental mitigation.
1469Embankment works.
1470Embankment works.
1473Environmental mitigation.
1474Embankment works.
1477Embankment works.
1479Embankment works and environmental mitigation.
1491Environmental mitigation.

Articles 6 and 25

SCHEDULE 3LAND IN WHICH ONLY NEW RIGHTS ETC., MAY BE ACQUIRED

(1)

Area

(2)

Number of land shown on the deposited plans

(3)

Purpose for which rights may be acquired

In the County of Oxfordshire

In the District of Cherwell

0043, 0046Access for construction, maintenance and utilities.
0091, 0092, 0104Access for construction, maintenance and utilities.
0162a, 0162bAccess for construction and maintenance.
0168Access for construction and maintenance.
0184Access for construction and maintenance.
0198, 0198aUtility diversions.
0216New right of access for a third party.
0245New right of access for a third party.
0252New right of access for a third party.
0255New right of access for a third party and utility diversions.
0259Utility diversions.
0260New right of access for a third party.

In the County of Buckinghamshire

In the District of Aylesbury Vale

0356Access for maintenance.
0375Access for maintenance.
0442a, 0442bUtilities and access for maintenance.
0454aAccess for utilities.
0479Access for maintenance.
0490aAccess for maintenance.
0519c, 0519d, 0543Access for maintenance.
0647Access for construction and maintenance.
0670Access for maintenance.
0679, 0679aAccess for maintenance.
0706, 0712Access for construction and maintenance.
0725, 0729, 0731Access for construction and maintenance.
0799, 0806Access for maintenance.
0830, 0837Access for construction and maintenance.
0844, 847, 856, 860Access for construction and maintenance.
0884bAccess for maintenance.
0910, 0918Access for maintenance and a new right of access for a third party.
0926Right of access for maintenance.

In the County of Buckinghamshire

In the District of Milton Keynes

1044Access for maintenance.
1060, 1061, 1062Access for construction and maintenance.
1122a, 1122b, 1124Access for construction and maintenance.
1135Access for construction and maintenance.

In the County of Bedfordshire

In the District of Central Bedfordshire

1185, 1188, 1189, 1190, 1192Access for construction, maintenance and creation of a new public right of way.
1194Access for maintenance.
1291Access for maintenance.
1316Access for maintenance.
1361a, 1370aAccess for maintenance.
1346, 1347, 1348Access for construction and maintenance.

In the County of Buckinghamshire

In the District of Aylesbury Vale

1386, 1390Access for construction and maintenance.
1393a, 1394, 1395,Access for maintenance.
1401, 1402Access for maintenance.
1426, 1429Access for maintenance.
1447Access for maintenance.
1450a, 1452, 1454Access for maintenance.
1461Access for construction.
1480aAccess for utilities.
1480, 1481a, 1488, 1489Access for maintenance.
1493aAccess for maintenance and utilities.

Articles 6 and 28

SCHEDULE 4LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

(1)

Area

(2)

Number of land shown on the deposited plans

(3)

Purpose for which temporary possession may be taken

(4)

Relevant part of the authorised works

In the County of Oxfordshire

In the District of Cherwell

0001, 0003, 0004, 0005, 0006Worksite for construction.Work No.1
0008, 0010Worksite and access for construction and creation of a new public right of way.Work Nos. 1 and 4
0011, 0015, 0017, 0017a, 0028, 0033Worksite and access for construction.Work Nos. 1 and 4
0012Worksite and access for construction.Work Nos. 1 and 4
0016Worksite and access for construction.Work Nos. 1 and 4
0043, 0046Worksite and access for construction and utility diversions.Work Nos. 1, 5, 6, 7, 8 and 9
0058Worksite and access for construction.Work Nos. 1, 5, 6, 7, 8 and 9
0085, 0095Worksite and access for construction.Work Nos. 1, 5, 6, 7, 8 and 9
0091, 0092, 0104Worksite and access for construction and utility diversions.Work Nos. 1, 5, 6, 7, 8 and 9
0110Worksite and access for construction.Work Nos. 1, 5, 6, 7, 8 and 9
0124Worksite and access for construction.Work Nos. 1, 5, 6, 7, 8 and 9
0125Worksite and access for construction and highway improvements.Work Nos. 1, 5, 6, 7, 8 and 9
0150, 0151, 0153, 0156, 0159Worksite and access for construction.Work No.1
0155, 0168Worksite and access for construction, utility diversions and environmental mitigation.Work Nos. 1, 5, 6, 7, 8 and 9
0182, 0188Worksite and access for construction.Work Nos. 1, 9 and 10
0184Worksite and access for construction.Work Nos. 1 and 9
0194Worksite and access for construction.Work Nos. 1 and 10
0195, 0197, 0203Worksite and access for construction and creation of a new public right of way.Work Nos. 1 and 10
0200Worksite and access for construction.Work Nos. 1 and 10
0198, 0198aWorksite and access for construction.Work Nos. 1 and 10
0216, 0245Worksite and access for construction.Work Nos. 1, 10, 11, and 12
0221Worksite and access for construction.Work Nos. 1, 10, 11, and 12
0229, 0238, 0240,Worksite and access for construction.Work Nos. 1, 10, 11, and 12
0234, 0253, 0268Worksite and access for construction.Work Nos. 1, 10, 11, 12 and 13
0235, 0237Worksite and access for construction.Work Nos. 1, 10, 11, and 12
0252, 0255, 0260Worksite and access for construction and utility diversions.Work Nos. 1, 10, 11, and 12
0259, 0263, 0272, 0278Worksite and access for construction.Work Nos. 1, 10, 11, 12 and 13
0275, 0289Worksite and access for construction.Work No.1
0279, 0280, 0282, 0285Worksite and access for construction.Work No.1
0299Worksite and access for construction.Work No.1

In the County of Oxfordshire and Buckinghamshire,

In the District of Cherwell and Aylesbury Vale

0303Worksite and access for construction and utility diversions.Work Nos. 1, 14 and 15
0312Worksite and access for construction.Work Nos. 1, 14 and 15

In the County of Buckinghamshire

In the District of Aylesbury Vale

0317Worksite and access for construction.Work Nos. 1, 14 and 15
0319Creation of a new public right of way.Work No.15
0325Worksite and access for construction.Work Nos. 1, 14 and 15
0334Worksite and access for construction.Work Nos. 1 and 16
0337Worksite and access for construction and creation of a new public right of way.Work Nos. 1 and 16
0340Passing place.Work No.1
0353, 0369Worksite and access for construction.Work No.1
0357, 0375Worksite and access for construction.Work Nos. 1, 16 and 17
0362, 0365Worksite and access for construction.Work No.1
0336bWorksite and access for construction.Work No.1
0370Worksite and access for construction.Work No.1
0375aKerb realignment and widening of road.Temporary highway works and Work No.1
0375bKerb realignment and widening of road.Temporary highway works and Work No.1
0375cKerb realignment and widening of road.Temporary highway works and Work No.1
0378, 0378aWorksite and access for construction.Work No.1
0381Worksite and access for construction.Work Nos. 1 and 17
0388, 0394, 0396Worksite and access for construction.Work Nos. 1 and 17
0401Worksite and access for construction and creation of a new public right of way.Work Nos. 1 and 17
0402Worksite and access for construction and creation of a new public right of way.Work Nos. 1 and 17
0404, 0406Worksite and access for construction.Work No.1
0419Worksite and access for construction.Work No.1
0425Worksite and access for construction.Work No.1
0429Worksite and access for construction.Work Nos. 2, 18 and 19
0433Worksite and access for construction.Work Nos. 2, 18 and 19
0436Worksite and access for construction.Work Nos. 2, 18 and 19
0442, 0442aWorksite and access for construction and utility diversions.Work Nos. 2, 18 and 20
0442bCreation of a temporary public right of way.Work Nos. 2, 18 and 20
0454, 0454a, 0454bWorksite and access for construction.Work Nos. 2, 18 and 20
0463Worksite and access for construction.Work No.2
0465Worksite and access for construction.Work No.2
0466Worksite and access for construction.Work Nos. 2, 18 and 20
0467Worksite and access for construction.Work No.2
0470, 0478Worksite and access for construction.Work Nos. 2 and 21
0472Worksite and access for construction.Work No.2
0479Worksite and access for construction.Work Nos. 2 and 21
0481Worksite and access for construction.Work No.2
0482Worksite and access for construction.Work No.2
0485Worksite and access for construction.Work No.2
0486Worksite and access for construction.Work Nos. 2 and 22
0488Worksite and access for construction.Work Nos. 2 and 22
0490aWorksite and access for construction.Work Nos. 2 and 22
0492Worksite and access for construction.Work Nos. 2 and 22
0495, 0499Worksite and access for construction.Work Nos. 2 and 23
0495aKerb realignment and widening of road.Temporary highway works and Work No.2
0499aKerb realignment and widening of road.Temporary highway works and Work No.2
0499bKerb realignment and widening of road.Temporary highway works and Work No.2
0499cKerb realignment and widening of road.Temporary highway works and Work No.2
0499dKerb realignment and widening of road.Temporary highway works and Work No.2
0499eKerb realignment and widening of road.Temporary highway works and Work No.2
0499fKerb realignment and widening of road.Temporary highway works and Work No.2
0499gKerb realignment and widening of road.Temporary highway works and Work No.2
0499hKerb realignment and widening of road.Temporary highway works and Work No.2
0496, 0497, 0501Worksite and access for construction.Work Nos. 2 and 23
0505Worksite and access for construction.Work Nos. 2 and 23
0507Worksite and access for construction.Work Nos. 2 and 23
0507aPassing place.Temporary highway works and Work No. 2
0509Worksite and access for construction.Work No.2
0510Worksite and access for construction.Work Nos. 2, 24 and 25
0513Worksite and access for construction.Work Nos. 2, 23, 24 and 25
0516Creation of a new public right of way.Work Nos. 2, 24 and 25
0519Worksite and access for construction.Work Nos. 2, 24 and 25
0519aCreation of a new public right of way.Work Nos. 2, 24, 25 and 25A
0519c, 0519dWorksite and access for construction.Work Nos. 2 and 25A
0521Worksite and access for construction.Work No.2
0531Worksite and access for construction.Work No.2
0543Worksite and access for construction.Work Nos. 2 and 25A
0570Worksite and access for construction.Work No.2
0571Worksite and access for construction.Work No.2
0577Worksite and access for construction.Work No.2
0580Worksite and access for construction and creation of a new public right of way.Work No.2
0585aWorksite and access for construction.Work No.2
0590Worksite and access for construction.Work No.2
0598Worksite and access for construction.Work No.2
0600, 0605, 0608Worksite and access for construction and creation of a new public right of way.Work No.2
0602Worksite and access for construction and creation of a new public right of way.Work No.2
0614Worksite and access for construction.Work Nos. 2 and 26
0617, 0620Worksite and access for construction.Work No.2
0617aKerb realignment and widening of road.Temporary highway works and Work No.2
0633aHighway widening and worksite and access for constructionWork No.2
0634Worksite and access for construction.Work No.2
0636, 0639Worksite and access for construction.Work Nos. 2 and 26
0641

Worksite and access for construction

creation of a new public right of way.

Work Nos. 2 and 26
0645Worksite and access for construction.Work Nos. 2 and 26
0647Worksite and access for construction.Work Nos. 2 and 26
0654Worksite and access for construction.Work Nos. 2 and 26
0661Creation of a new public right of way.Work Nos. 2 and 26
0669Worksite and access for construction.Work No.2
0670Worksite and access for construction.Work Nos. 2 and 26A
0671, 0673Worksite and access for construction.Work No.2
0674Worksite and access for construction.Work No.2
0684, 0692Worksite and access for construction.Work No.2
0685, 0690, 0693, 0699Worksite and access for construction.Work No.2
0700Worksite and access for construction.Work Nos. 2 and 26B
0700aKerb realignment and widening of road.Temporary highway works and Work No.2
0700bKerb realignment and widening of road.Temporary highway works and Work No.2
0712Worksite and access for construction.Work No.2
0716, 0725, 0729, 0731Worksite and access for construction.Work No.2
0720Worksite and access for construction.Work No.2
0740Worksite and access for construction.Work Nos. 2 and 27
0742Worksite and access for construction and creation of a new public right of way.Work Nos. 2 and 27
0744Drainage works.Work Nos. 2 and 27
0751Worksite and access for construction.Work Nos. 2 and 27
0752Worksite and access for construction.Work Nos. 2 and 27
0754Worksite and access for construction.Work Nos. 2 and 27
0755, 0758, 0761, 0764, 0765, 0767, 0768Creation of a new public right of way.Work Nos. 2 and 28
0762Worksite and access for construction.Work Nos. 2 and 28
0763Kerb realignment and widening of road.Temporary highway works and Work No.2
0774Worksite and access for construction.Work Nos. 2 and 28
0777aPassing Place.Temporary highway works Work No.2
0791, 0799, 0806Worksite and access for construction.Work No.2
0796, 0797, 0798Kerb realignment and widening of road.Temporary highway works and Work No.2
0802Passing Place.Temporary highway works and Work No.2
0805Worksite and access for construction and drainage works.Work No.2
0807Worksite and access for construction.Work No.2
0815Worksite and access for construction and drainage works.Work No.2
0817, 0824, 0825, 0830Worksite and access for construction.Work No.2
0824aKerb realignment and widening of road.Temporary highway works and Work No.2
0824bKerb realignment and widening of road.Temporary highway works and Work No.2
0824cKerb realignment and widening of road.Temporary highway works and Work No.2
0824dKerb realignment and widening of road.Temporary highway works and Work No.2
0824eKerb realignment and widening of road.Temporary highway works and Work No.2
0824fKerb realignment and widening of road.Temporary highway works and Work No.2
0824gKerb realignment and widening of road.Temporary highway works and Work No.2
0822, 0828, 0835Worksite and access for construction.Work Nos. 2 and 29
0840, 0840a, 0843a, 0835aWorksite and access for construction and creation of a new public right of way.Work Nos. 2 and 29
0836Worksite and access for construction.Work Nos. 2 and 29
0843, 0850, 0857Worksite and access for construction.Work Nos. 2 and 29
0844Worksite and access for construction and creation of a new public right of way.Work Nos. 2 and 29
0846Worksite and access for construction.Work Nos. 2 and 29
0851, 0854, 0862Worksite and access for construction.Work No.2
0870Worksite and access for construction.Work No.2
0872, 0880, 0884Worksite and access for construction.Work Nos. 2, 30, 31 and 32
0875, 0876, 0877Drainage Works.Work No.2
0883Worksite and access for construction.Work Nos. 2, 30, 31 and 32
0884bWorksite and access for construction.Work Nos. 2, 30, 31 and 32
0890, 0892, 0894, 0898Worksite and access for construction.Work Nos. 2, 30, 31 and 32
0902, 0906a, 0914a,Worksite and access for construction.Work Nos. 2, 30, 31 and 32
0906, 0908, 0914, 0914e, 0923, 0931Worksite and access for construction.Work Nos. 2, 30, 31 and 32
0910, 0918Worksite and access for construction.Work No.2
0912Worksite and access for construction.Work Nos. 2, 30, 31 and 32
0914cWorksite and access for construction.Work Nos. 2, 30, 31 and 32
0926Worksite and access for construction.Work No.2
0937, 0941Worksite and access for construction.Work No.2
0939Worksite and access for construction.Work No.2
0950Worksite and access for construction.Work No.2
0968, 0969Worksite and access for construction.Work No.2
0972, 0988Worksite and access for construction.Work No.2
0973, 0974, 0975Worksite and access for construction.Work No.2
0979Worksite and access for construction.Work No.2
0980Worksite and access for construction.Work No.2
0992, 0997Worksite and access for construction.Work No.2
1002, 1003Worksite and access for construction.Work No.2
1004Worksite and access for construction.Work No.2
1008Worksite and access for construction.Work No.2
1011, 1012Worksite and access for construction.Work No.2

In the County of Buckinghamshire

In the Districts of Aylesbury Vale and Milton Keynes

1015, 1023Worksite and access for construction.Work No.2

In the County of Buckinghamshire

In the District of Milton Keynes

1015a, 1025, 1027Worksite and access for construction.Work No.2
1017Worksite and access for construction.Work No.2
1041, 1042, 1045Worksite and access for construction.Work No.2
1044Worksite and access for construction.Work No.2
1050, 1054Worksite and access for construction.Work No.2
1058, 1059Worksite and access for construction.Work No.2
1106, 1107, 1109, 1112Worksite and access for construction and creation of a new public right of way.A public right of way diversion
1116Worksite and access for construction.Work No.33
1117Worksite and access for construction.Work No.33
1117aWorksite and access for construction and creation of a new public right of way.Work No.33
1117bWorksite and access for construction.Work No.33
1120, 1122aWorksite and access for construction and creation of a new public right of way.Work No.33
1122Worksite and access for construction.Work No.33
1122b, 1124Worksite and access for construction.Work No.33
1123Worksite and access for construction.Work No.33
1128Worksite and access for construction and creation of a temporary public right of way.Work No.33
1130Worksite and access for construction.Station Works
1143Creation of a new public right of way.Extinguishment of level crossing

In the County of Bedfordshire

In the District of Central Bedfordshire

1191Worksite and access for construction.Work Nos. 34, 35 and 36
1194Worksite and access for construction and maintenance.Work Nos. 34, 35 and 36
1200, 1205, 1207Worksite and access for construction and creation of a new public right of way.Extinguishment of level crossing and station works
1206, 1209, 1213, 1214, 1221Worksite and access for construction.Station works
1219, 1220, 1222, 1227, 1229Worksite and access for construction.Station works
1226, 1228, 1232Worksite and access for construction and creation of a new public right of way.Extinguishment of level crossing
1243Creation of a new public right of way.Extinguishment of level crossing
1251, 1252, 1256, 1258, 1259Creation of a new public right of way.Work No.37
1253Worksite and access for construction.Extinguishment of level crossing
1254Worksite and access for construction.Extinguishment of level crossing
1261Worksite and access for construction.Work No.37
1262Worksite and access for construction.Work No.37
1265, 1267, 1269, 1271, 1273Worksite and access for construction.Work No.37
In the District of Bedford1296Worksite and access for construction.Extinguishment of level crossing
1298Worksite and access for construction.Extinguishment of level crossing
1302Worksite and access for construction.Work No.38
1304Worksite and access for construction.Work No.38
1316Worksite and access for construction.Work No.38
1317Worksite and access for construction.Work No.38
1323Worksite and access for construction.Work No.38
1336, 1337Worksite and access for construction and creation of a new public right of way.Work No.39
1338Worksite and access for construction.Work No.39
1339Worksite and access for construction and creation of a new public right of way.Work No.39
1342Worksite and access for construction.Work No.39
1343, 1344Worksite and access for construction.Work No.39

In the County of Buckinghamshire

In the District of Aylesbury Vale

1361, 1361a, 1361b, 1362, 1368Worksite and access for construction.Work No.40
1370aWorksite and access for construction.Work No.40
1364Worksite and access for construction.Work No.40
1371, 1384Worksite and access for construction.Work No.40
1391aWorksite and access for construction.Work No.40
1398Worksite and access for construction.Work No.40
1401, 1402Worksite and access for construction.Work No.40
1410, 1412Worksite and access for construction.Work No.40
1414Worksite and access for construction.Work Nos.40 and 41
1415Worksite and access for construction.Work No.40
1418Worksite and access for construction.Work Nos.40 and 41
1419Worksite and access for construction.Work No.40
1421, 1423Worksite and access for construction.Work No.40
1421aCreation of a temporary public right of way.Work No.40
1426, 1429Worksite and access for construction.Work No.40
1430Worksite and access for construction.Work No.40
1432, 1440Worksite and access for construction.Work Nos.40 and 42
1434, 1435Worksite and access for construction.Work No.40
1441Worksite and access for construction.Work Nos. 40 and 42
1447Worksite and access for construction.Work Nos. 40 and 42
1450Worksite and access for construction.Work Nos. 40 and 42
1455Worksite and access for construction.Work No.40
1457, 1462Worksite and access for construction.Work No.40
1459, 1461Worksite and access for construction.Work No.40
1464Worksite and access for construction.Work No.40
1450a, 1452, 1454Worksite and access for construction.Work No.40
1468, 1480, 1480a, 1480bWorksite and access for construction.Work No.40
1475, 1476, 1481Worksite and access for construction.Work No.40
1481a, 1486, 1488, 1489, 1493, 1493a, 1493b, 1513, 1515Worksite and access for construction.Work No.40
1499Worksite and access for construction.Work No.40
1504, 1521Worksite and access for construction.Work No.40
1518, 1520Worksite and access for construction.Work No.40
1525, 1528, 1529, 1530, 1531, 1532, 1533, 1534, 1536, 1537, 1538, 1539, 1541, 1542Worksite and access for construction.Extinguishment of level crossing.
1527Worksite and access for construction and creation of a new public right of way.Extinguishment of level crossing.

Article 8

SCHEDULE 5REPLACEMENT AND CLOSURE OF ROAD LEVEL CROSSINGS

PART 1LEVEL CROSSINGS FOR WHICH A SUBSTITUTE IS TO BE PROVIDED

(1)

Area

(2)

Level crossing to be discontinued

(3)

Street to be stopped up

(4)

New street to be substituted

County of Oxfordshire District of Cherwell

Parishes of Bicester and Launton

The level crossing known as Bicester Eastern Perimeter Road level crossing whereby A4421 Charbridge Lane is crossed on the existing railway between Bicester and Bletchley stations.A4421 Charbridge Lane between points P6 and P7 (on sheet 2).Work No.5
Parish of LauntonThe level crossing known as Launton Highway level crossing whereby Station Road is crossed on the existing railway between Bicester and Bletchley stations.Station Road between points P12 and P13 and between points P14 and P15 (on sheets 4 and 5).Work No.11

County of Buckinghamshire District of Aylesbury Vale

Parishes of Steeple Claydon and Middle Claydon

The level crossing known as Queen Catherine Road level crossing whereby Queen Catherine Road is crossed on the existing railway between Bicester and Bletchley stations.Queen Catherine Road between points P1 and P2, between points P3 and P4 and between points P5 and P6 (on sheets 15 and 16).Work No.18, 19 and 20

County of Bedfordshire

District of Bedford

Parishes of Lillington

The level crossing known as Marston Road level crossing whereby Marston Road is crossed on the existing railway between Bletchley and Bedford stations.Marston Road between points P12 and P13 (on sheet 54).Work No.37

County of Bedfordshire

District of Central Bedfordshire

Parish of Stewartby

The level crossing known as Kempston Hardwick crossing whereby Manor Road is crossed on the existing railway between Bletchley and Bedford stations.Manor Road between points P1 and P2 (on sheet 57).Work No.38

PART 2LEVEL CROSSINGS FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED

(1)

Area

(2)

Level crossing to be discontinued

(3)

Highway to be stopped up

County of Bedfordshire

District of Central Bedfordshire

Parish of Aspley Guise

The level crossing known as Berry Lane level crossing whereby Berry Lane is crossed on the railway between Bletchley and Bedford stations.Berry Lane between points P1 and P2 (on sheet 49)

Article 9

SCHEDULE 6REPLACEMENT AND CLOSURE OF FOOTPATH LEVEL CROSSINGS

PART 1LEVEL CROSSINGS FOR WHICH A SUBSTITUTE IS TO BE PROVIDED

(1)

Area

(2)

Footpath level crossing to be discontinued

(3)

Right of way to be stopped up

(4)

New right of way to be substituted

County of Oxfordshire

District of Cherwell

Parish of Bicester

The level crossing known as Jarvis’ Lane level crossingJarvis’ Lane Footpath not on the definitive map between points P1 and P2 (on sheet 2).Footpath between points P3, P4, Work No.4 and point P5 (on sheet 2).
Parish of LauntonThe level crossing known as Grange Farm level crossingFootpath 272/11/10 between points P1 and P4 (on sheet 3).Footpath between points P1, P2, Work No.10, points P3 and P4 (on sheet 3).
The level crossing known as Launton No.1 level crossingFootpath 272/12/10 between points P5 and P7 (on sheets 3 and 4).Footpath between points P5, P3, Work No.10, points P2 and P8 (on sheets 3 and 4)
The level crossing known as Launton No.2 level crossingFootpath 272/21/10 and path not on definitive map between points P10 and P11 (on sheet 4).Footpath between points P6, P5, P3, Work No.10, points P2, P8 and P10 (on sheets 3 and 4).

County of Buckinghamshire

District of Aylesbury Vale

Parish of Marsh Gibbon

The level crossing known as Marsh Gibbon combined Footpath and user works level crossingFootpath MGI/5/1 between points P1 and P2 (on sheet 7).Footpath between points P1, P3, Work No.14, points P4 and P5 (on sheet 7).
Parish of PoundonThe level crossing known as Poundon No.2 level crossingFootpath POD/2/1 between points P1 and P2 (on sheet 8).Footpath between points P1, P4, Work No.16, points P3 and P2 (on sheet 8).
Parish of CharndonThe level crossing known as Charndon No.3 level crossingFootpath CHA/3/1 between points P1 and P2 (on sheets 9 and 11).Footpath between points P1 and P3 (on sheets 9 and 11).
Parish of TwyfordThe level crossing known as Twyford No.2 level crossingFootpath TWY/2/3 between points P1 and P3 and Footpath TWY2/2 between points P3 and P4 (on sheet 12).Footpath between points P1, P2, Work No.17, points P3 and P4 (on sheet 12).
The level crossing known as Twyford No.3 level crossingFootpath TWY/3/1 between points P5 and P4 (on sheet 12).Footpath between points P5, P2, Work No.17, points P3 and P4 (on sheet 12).
Parishes of Middle Claydon and Steeple ClaydonThe level crossing known as Middle Claydon Footpath No.8 level crossingFootpath SCL/1/3, path not on definitive map and Footpath MCL/8/1 between points P1 and P3 (on sheet 17).Footpath between points P1, Work No.21, points P2 and P3 (on sheet 17).
Parish of Middle ClaydonThe level crossing known as Middle Claydon Footpaths No.4 & No.6 level crossingFootpath MCL/4/1 between points P1 and P5, Footpath MCL/6/1 between points P2 and P5, Footpath MCL/6/2 between points P3 and P5, Footpath MCL/4/2 between points P4 and P5 (on sheet 18).Footpath between points P1 and P6, between points P2 and P6, Work No.22, points P7 and P3 and between points P7 and P4 (on sheet 18).
Parish of Middle ClaydonThe level crossing known as Verney Junction level crossing

Footpath MCL/2/1 and path not on definitive map between points

P1 and P2 and Footpath MCL/3/1 and path not on definitive map between points P1 and P3 (on sheets 20 and 21).

Footpath between points P6,

Work No.24, point P5 and P2 and between points P7 and P8 (on sheets 20 and 21).

Parishes of Winslow and AddingtonThe level crossing known as Winslow Footpath No.5 level crossingFootpath ADD/11/1 between points P1 and P2 and Footpath WIS/5/1 between points P2 and P3 (on sheet 23).Footpath between points P1, P4, P5 and P3 (on sheet 23).
Parish of SwanbourneThe level crossing known as Winslow Footpath No.17 level crossingFootpath SWA/17/1 between points P1 and P2 (on sheets 27 and 28).Footpath between points P1, P3, Work No.27 and point P2 (on sheets 27 and 28).
The level crossing known as Moco Farm No. 2Footpath SWA/1/2 between points P4 and P7 (on sheet 28).Footpath between points P4, P5, Work No.28, points P6 and P7 (on sheet 28).
Parishes of Little Horwood, Swanbourne and MursleyThe level crossing known as Swanbourne Old Station level crossingFootpath LHO/27/1 between points P9 and P10, Footpath MUR/19/1 between points P10 and P11 and Footpath SWA/20/1 between points P11 and P12 (on sheets 28 and 29).Footpath between points P9and P8and between points P4, P5, Work No.28, point P6 and P7 (on sheet 28).
Parishes of Little Horwood and MursleyThe level crossing known as Swan’s Way level crossingFootpath LH0/20/1 between points P1 and P5 and Footpath MUR/13/1 between points P5 and P6 (on sheet 30).Footpath between points P1, P2, Work No.29, points P3 and P4 (on sheet 30).

County of Buckinghamshire

District of Milton Keynes

Parish of Woburn Sands

The level crossing known as Fisherman’s Path level crossingWoburn Sands Footpath 002 between points P1 and P2 (on sheet 46).Footpath between points P1, P3, Work No.33, points P4, P5 and P2 (on sheets 45 and 46).
The level crossing known as School Crossing Woburn Sands level crossingWoburn Sands Footpath 003 between points P6 and P7 (on sheet 46).Footpath between points P9 and P7 (on sheet 46).

County of Bedfordshire

District of Central Bedfordshire

Parishes of Husbourne Crawley and Brogbourgh

The level crossing known as Husbourne Crawley level crossing Footpath 10Footpath 10 between points P1 and P2 and Footpath BRG/17/10 between points P2 and P3 (on sheets 51 and 52).Footpath between points P1, P4, P5 and P6 (on sheets 51 and 52).
Parish of LidlingtonThe level crossing known as Pilling Farm South level crossingFootpath 1 and path not on definitive map between points P5 and P6 (on sheet 53).Footpath between points P6, P7 and P8 and bridleway between points P5, P10 and P11 (on sheets 53 and 54)

District of Bedford

Parish of Kempston

The level crossing known as Woburn Road level crossingFootpath KEU1B (FP 1), path not on definitive map and Footpath KERA1A (FP A1) between points P1 and P2 (on sheet 58).Footpath between points P1, P3 Work No.39, point P4 and P5 (on sheet 58).

County of Buckinghamshire

District of Aylesbury Vale

Parish of Waddesdon

The level crossing known as North Bucks Way No.1 level crossingFootpath WAD/3/5 between points P1 and P4 (on sheet 61).Footpath between points P1, P2, Work No.41, point P3 and P4 (on sheet 61).
Parish of AylesburyThe level crossing known as Griffin Lane level crossingFootpath AYL/8/1 between points P1 and P6, and Footpath AYL/7/1 between points P5 and P6 (on sheet 70).Footpath between points P3, P4 and P5 (on sheet 70).

PART 2LEVEL CROSSINGS FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED

(1)

Area

(2)

Footpath level crossing to be discontinued

(3)

Right of way to be stopped up

County of Bedfordshire

District of Bedford

Parish of Stewartby

The level crossing known as Stewartby Brickworks level crossingFootpath STW 5A between points P1 and P2 (on sheet 56).

District of Central Bedfordshire

Parish of Lidlington

The level crossing known as School Crossing Lidlington level crossingFootpath 6/A6 and path not on definitive map between points P1 and P2 (on sheet 53).
Parish of Marston MoretaineThe level crossing known as Millennium Park level crossingFootpath 13 and path not on definitive map between points P1 and P2 (on sheet 55).

Article 10

SCHEDULE 7ACCOMMODATION CROSSINGS

PART 1ACCOMMODATION CROSSINGS FOR WHICH A SUBSTITUTE IS TO BE PROVIDED

(1)

Area

(2)

Accommodation facility to be discontinued

(3)

Private right of way to be extinguished

(4)

Accommodation facility to be substituted

County of Oxfordshire District of Cherwell

Parish of Launton

The level crossing known as Manor Farm level crossing whereby Manor Farm access road is crossed on the existing railway between Bicester and Bletchley stationsManor Farm access road (on sheet 3)Work No.9

County of Buckinghamshire District of Aylesbury Vale

Parish of Marsh Gibbon

The level crossing known as Marsh Gibbon user works level crossing whereby Marsh Gibbon access road is crossed on the existing railway between Bicester and Bletchley stationsMarsh Gibbon access road (on sheet 7)Work No.14
The accommodation crossing OXD/33 known as Marsh Gibbon Accommodation BridgeOXD/33 known as Marsh Gibbon Accommodation Bridge access (on sheet 7)Work No.14
Parish of Middle ClaydonThe level crossing known as Littleworth Farm level crossing whereby Littleworth Farm access road is crossed on the existing railway between Bicester and Bletchley stationsLittleworth Farm access (on sheet 19)Work No.24
The level crossing known as Verney Junction level crossing whereby Furze Farm access road is crossed on the existing railway between Bicester and Bletchley stationsVerney Junction access road (on sheet 20)Work No.24
Parish of SwanbourneThe level crossing known as Moco Farm No.1 level crossing whereby Moco Farm access road is crossed on the existing railway between Bicester and Bletchley stationsMoco Farm access road (on sheet 27)Work No.27
The accommodation crossing OXD/14 known as Moco Farm OverbridgeOXD/14 Moco Farm Overbridge access (on sheet 27)Work No. 27
Parish of MursleyThe level crossing known as Weasels Lodge level crossing whereby an access road is crossed on the existing railway between Bicester and Bletchley stations and OXD/10 Salden OverbridgeWeasels Lodge access road and OXD/10 Salden Overbridge (on sheet 32)Works Nos. 30 and 31

County of Buckinghamshire District of Milton Keynes

Parish of Woburn Sands and Wavendon

The level crossing known as Woodley’s Farm level crossing whereby Woodley’s Farm access road is crossed on the railway between Bletchley and Bedford stationsWoodley’s Farm access road (on sheet 45)Work No.33

County of Bedfordshire

District of Central

Bedfordshire

Parish of Aspley Guise

The level crossing known as Berry Lane level crossing whereby Berry Lane is crossed on the railway between Bletchley and Bedford stationsBerry Lane between points P1 and P2 (on sheet 49)Work No.34
Parish of Aspley Guise and Husbourne CrawleyThe level crossing known as Long Leys level crossing whereby Long Leys access road is crossed on the railway between Bletchley and Bedford stationsLong Leys access road (on sheet 50)Work No.35 and 36
Parish of Husbourne CrawleyThe level crossing known as Matey Boys level crossing whereby an access road is crossed on the railway between Bletchley and Bedford stations.Matey Boys access road (on sheet 50)Work No.35 and 36

County of Buckinghamshire District of Aylesbury Vale

Parish of Waddesdon

The level crossing known as Lower Blackgrove No.1 crossing whereby an access road is crossed on the existing railway between Buckinghamshire former Railway station and Aylesbury Vale Parkway station.Lower Blackgrove Farm access road (on sheet 64)Work No.42

PART 2ACCOMMODATION CROSSINGS FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED

(1)

Area

(2)

Accommodation facility to be discontinued

(3)

Private right of way to be extinguished

County of Buckinghamshire

District of Aylesbury Vale

Parish of Swanbourne

The level crossing known as Moco Farm No. 2Moco Farm access road (on sheet 28).
Parish of Fleet MarstonThe level crossing known as Fleet Marston Farm crossing whereby an access road is crossed on the existing railway between Buckinghamshire former Railway station and Aylesbury Vale Parkway stationFleet Marston Farm access road (on sheet 67)

County of Bedfordshire

District of Bedford

Parish of Stewartby

The level crossing known as Stewartby Brickworks crossing whereby an access road is crossed on the existing railway between Bletchley and Bedford stations

Stewartby Brickworks access road

(on sheet 56)

Article 11

SCHEDULE 8STREETS SUBJECT TO ALTERATION OF LAYOUT

(1)

Area

(2)

Street subject to alteration of layout

(3)

Description of alteration

County of Buckinghamshire

District of Aylesbury Vale

Parish of Poundon

Station RoadPassing places between points T2 and T3 (on sheets 9 and 10).
The junction of Main Street with Station RoadKerbline realignment and widening of road (on sheet 10).
Parish of CharndonThe junction of School Hill with Main StreetKerbline realignment and widening of road (on sheet 13).
School HillPassing places between points T11 and T13 (on sheets 13 and 77).
The junction of School Hill with an Unnamed Road (between School Hill and Perry Hill)Kerbline realignment and widening of road (on sheet 77).
Parish of Steeple ClaydonThe Junction of Buckingham Road with Queen Catherine RoadKerbline realignment and widening of road (on sheet 15).
Queen Catherine RoadPassing places between points T2 and P1 (on sheet 15).
Parish of Middle ClaydonSandhill RoadPassing places between points T2 and T3 (on sheet 19).
The Junction of Verney Road with Sandhill RoadKerbline realignment and widening of road (on sheet 19).
Parish of Middle ClaydonVerney RoadPassing places between points T3, T4 and T5 (on sheets 19 and 20) and between points T5 and T6 (on sheets 19 and 20).
Verney RoadKerbline realignment and widening of road (on sheet 20).
Parish of Middle Claydon, East Claydon and AddingtonVerney RoadPassing places between points T7 and T8 (on sheets 20 and 21), and between points T9 and T10 (on sheets 22), and between points T12 and T13 (on sheets 22 and 23).
Parish of WilmslowThe junction of Furze Lane with Verney RoadKerbline realignment and widening of road (on sheet 24).
Horwood RoadPassing places between points T1 and T2 (on sheets 85 and 26)
Parish of Mursley and SwanbourneStation RoadPassing places between points T5 and T3 (on sheets 28 and 29).
Parish of MursleyThe junction of Station Road with an Unnamed Road (between Mursley Road and Station Road)Kerbline realignment and widening of road (on sheet 29).
Station RoadPassing places between points T3 and T4 (on sheets 29 and 86).

District of Milton Keynes

Parish of Woburn Sands

The junction of Cranfield Road with Station Road.Kerbline and footpath realignment and widening of road (on sheet 46).

County of Bedfordshire

District of Central Bedfordshire

Parish of Lidlington

Station Road between points T1 and T2 (on sheet 53)Kerbline realignment and widening of road (on sheet 53).
Church Street between points T2 and T3 (on sheet 53).Kerbline realignment and widening of road (on sheet 53).

District of Bedford

Parish of Stewartby

Manor RoadPassing places between points P2 and T3 (on sheet 57) and between points T1 and T2 (on sheet 96).

County of Buckinghamshire

District of Aylesbury Vale

Parish of Waddesdon

Blackgrove RoadPassing places between points T4 and T5 (on sheet 63).

County of Oxfordshire

District of Cherwell

Parish of Fringford and Stratton Audley

The junction of an Unnamed Road (between A4421 Roman Road and Mill Road) with A4221 Roman RoadKerbline realignment and widening of road (on sheet 71).
Parish of Stratton AudleyUnnamed Road (between A4421 Roman Road and Mill Road)Passing places between points T2 and T4 (on sheets 71 and 72).
The junction of an Unnamed Road (between A4421 Roman Road and Mill Road) with Mill RoadKerbline realignment and widening of road (on sheet 72).

County of Oxfordshire

District of Cherwell and Aylesbury Vale

Parishes of Stratton Audley and Godington

County of Buckinghamshire

District of Aylesbury Vale

Parish of Poundon

Unnamed Road (between Mill Road and Main Street)Passing places between points T4 and T5 (on sheets 72 and 76).

County of Buckinghamshire

District of Aylesbury Vale

Parish of Gawcott with Lenborough

The Junction of an Unnamed Road (between Lenborough Road and A413 London Road) with A413 London RoadKerbline realignment and widening of road (on sheet 78).
Unnamed Road (between Lenborough Road and A413 London Road)Passing places between points T2 and T4 (on sheet 78).
Parish of Gawcott with Lenborough and PadburyUnnamed Road (between Lenborough Road and Main Street)Passing places between points T4 and T5 (on sheets 78 and 80).
Parish of Steeple ClaydonHerd’s HillPassing places between points T1 and T2 (on sheets 81 and 82).
The junction of Herd’s Hill with Sandhill RoadKerbline realignment and widening of road (on sheet 82).
Sandhill RoadPassing places between points T2 and T3 (on sheets 82 and 84).
Parish of Steeple Claydon and PadburyUnnamed Road (between Sandhill Road and Main Street)Passing places between points T4 and T5 (on sheets 82 and 83).
Parish of Mursley, Stewkley and Drayton ParslowB4032Passing places between points T1 and T2 (on sheet 87) and between points T1 and T2 (on sheet 88).
Parish of Stewkley and Drayton ParslowBletchley RoadPassing places between points T2 and T3 (on sheets 88 and 91).

District of Bedford

Parish of Drayton Parslow

Drayton RoadPassing places between points T1 and T2 (on sheets 92 and 93).

County of Bedfordshire

District of Central Bedfordshire

Parish of Lidlington

High StreetPassing places between points T1 and T2 (on sheets 94 and 95).
The junction of High Street with the A507Kerbline realignment and widening of road (on sheet 95).

District of Bedford

Parish Stewartby

Manor RoadPassing places between points T1 and T2 (on sheet 96).

County of Buckinghamshire

District of Aylesbury Vale

Parish of Edgcott

Grendon RoadPassing places between points T1 and T2 (on sheet 97).
Parish of WestcottThe junction of an Unnamed Road (between A41 and Station Road) with the A41Kerbline realignment and widening of road (on sheet 98).
Parish of Westcott, Waddesdon and QuaintonUnnamed Road (between A41 and Station Road)Passing places between points T2 and T3 (on sheets 98 and 99).
Parish of WaddesdonThe junction of Blackgrove Road with the A41Kerbline realignment and widening of road (on sheet 100).

Article 12

SCHEDULE 9STREETS SUBJECT TO STREET WORKS

(1)

Area

(2)

Street subject to street works

County of Oxfordshire

District of Cherwell

Parish of Bicester and Launton

A4421 Charbridge Lane

A4421 Skimmingdish Lane

Parish of Launton

Bicester Road (on sheet 2)

Station Road

Bicester Road (on sheet 6)

County of Buckinghamshire

District of Aylesbury Vale

Parish of Poundon

Station Road

Main Street

Parish of TwyfordMain Street
Arish of CharndonMain Street
Parish of Steeple Claydon and Middle ClaydonQueen Catherine Road
Sandhill Road
Parish of Middle Claydon, East Claydon and AddingtonVerney Road
Parish of WinslowFurze Lane
Horwood Road
Buckingham Road
Parish of Little HorwoodHorwood Road
Parish SwanbourneStation Road
Parish of MursleyStation Road
Unnamed Road (between Mursley Road and Station Road)
Salden Lane
Whaddon Road
Parish of Newton Longville

Whaddon Road

Bletchley Road

District of Milton Keynes

Parish of West Bletchley

Selbourne Avenue

Water Eaton Road

Wellington Place

Parish of Bletchley and Fenny DraytonSaxon Street
Parish of WaltonDavenport Lea
Parish of Woburn Sands

Newport Road

Station Road

Cranfield Road

County of Bedfordshire

District of Central Bedfordshire

Parish of Aspley Guise

Salford Road

Berry Lane

Parish of Husborne CrawleyBedford Road
Parish of Husborne Crawley and BrogboroughStation Road
Parish of LidlingtonStation Road
Bye Road
Church Street
Marston Road

District of Bedford

Parish of Sewartby

Manor Road
Parish of KempstonChantry Road

County of Buckinghamshire

District of Aylesbury Vale

Parish of Quainton

Station Road
Parish of WaddesdonBlackgrove Road
Parish of Quainton and Fleet MarstonA41
Parish of Coldhardbour and AylesburyGriffin Lane

County of Oxfordshire

District of Cherwell

Parish of Fringford and Stratton Audley

Unnamed Road (between A4421 Roman Road and Mill Road)
Parish of FringfordA4221 Roman Road
Parish of Stratton AudleyUnnamed Road (between A4421 Roman Road and Mill Road)
Mill Road

County of Oxfordshire and Buckinghamshire

District of Cherwell and Aylesbury Vale

Parish of Stratton Audley, Godington and Poundon

Unnamed Road (between Mill Road and Main Street)

County of Buckinghamshire

District of Aylesbury Vale

Parish of Gawcott with Lenborough

Unnamed Road (between Lenborough Road and A413 London Road)
A413 London Road
Parish of Gawcott with Lenborough and PadburyUnnamed Road (between Lenborough Road and Main Street)
Parish of CharndonSchool Hill
Parish of Steeple ClaydonHerd’s Hill
Sandhill Road
Parish of Steeple Claydon and PadburyUnnamed Road (between Sandhill Road and Main Street)
Parish of Mursley, Stewkley and Drayton ParslowB4032
Parish of Stewkley and Drayton ParslowBletchley Road

District of Bedford

Parish of Drayton Parslow

Drayton Road

County of Bedfordshire

District of Central Bedfordshire

Parish of Lidlington

High Street
A507
Parish StewartbyManor Road

County of Buckinghamshire

District of Aylesbury Vale

Parish of Edgcott

Grendon Road
Parish of Westcott and WaddesdonA41
Parish of Westcott, Waddesdon and QuaintonUnnamed Road (between A41 and Station Road)
Parish of WaddesdonBlackgrove Road

Article 13

SCHEDULE 10STREETS TO BE STOPPED UP

PART 1STREETS FOR WHICH A SUBSTITUTE IS TO BE PROVIDED

(1)

Area

(2)

Street to be stopped up

(3)

Extent of stopping up

(4)

New street to be substituted

County of Oxfordshire

District of Cherwell

Parish of Launton

Footpath 272/13/10Between points P7 and P8 (on sheet 4)Footpath between points P5, P3, Work No.10, point P2 and P8 (on sheets 3 and 4)
Footpath 272/20/50Between points P7 and P9 (on sheet 4)Footpath between points P8 and P10 (on sheet 4)

Country of Buckinghamshire District of Aylesbury Vale

Parish of Middle Claydon

Footpath MCL/9/1Between points P7 and P8 (on sheet 16)Work Nos. 18 (part) and 20
Sandhill RoadBetween points P1 and P2 (on sheet 19)Work No.23
Parish of AddingtonFootpath ADD/13/1

Between points

P1 and P2 (on sheet 22)

Footpath between point P4 and P5 (on sheet 22)
Footpath ADD/13/2

Between points

P2 and P3 (on sheet 22)

Footpath between point P5 and P6 (on sheet 22)
Parish of WinslowFootpath WIS/6/1Between points P1 and P4 (on sheet 24)Footpath between point P1, P2, Work No.26, point P3 and P6 (on sheet 24)
Footpath WIS/6/2Between points P6 and P4 (on sheet 24)Footpath between points P3 and P6 (on sheet 24)
Footpath WIS/6/9Between points P4 and P5 (on sheet 24)Footpath between points P6 and P7 (on sheet 24)
Parish of MursleySalden LaneBetween points P3 and P1 (on sheet 32)Work No. 30
Restricted Byway MUR/15/1Between points P1 and P2 (on sheet 32)Work No. 31

County of Buckinghamshire District of Milton Keynes

Parish of Walton, Bow Brickhill and Woburn Sands

Bow Brickhill Bridleway 014Between points P1 and P4 (on sheet 44)Bridleway between points P1, P2, P3 and P4 (on sheet 44)

PART 2STREETS FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED

(1)

Area

(2)

Street to be stopped up

(3)

Extent of stopping up

County of Oxfordshire

District of Cherwell

Parish of Launton

Bicester Road (Eastern verge)Within Order limits (on sheet 2)

County of Buckinghamshire

District of Aylesbury Vale

Parish of Mursley

Restricted Byway MUR/18/1Within the Limits of Deviation of Work No. 2 (On Sheet 29)

County of Buckinghamshire

District of Milton Keynes

Parish of Bletchley and Fenny Drayton

Saxon Street (Western Verge)Within the Limits of Deviation of Work No. 2 (On Sheet 42)

Article 14

SCHEDULE 11STREETS TO BE TEMPORARILY STOPPED UP

(1)

Area

(2)

Street to be temporarily stopped up

(3)

Extent of temporary stopping up

County of Oxfordshire

District of Cherwell

Parish of Bicester

Footpath 129/18/10Between points T1 and P2 (on sheets 1 and 2).
Footpath 129/18/20Between points P2 and T2 (on sheet 2).
Charbridge WayWithin Order limits (on sheet 2).
Jarvis’ Lane Footpath not on the definitive mapBetween points P2, P1 and P3 (on sheet 2).
Parish of Bicester and LauntonA4421 Charbridge LaneWithin Order limits (on sheet 2).
Parish of LauntonBicester RoadBetween points T3 and T4 (on sheet 2).
Footpath 272/7/10Within Order limits (on sheet 2).
Footpath 272/11/10Within Order limits (on sheet 3).
Footpath 272/12/10Between points T1, P5 and P7 (on sheets 3 and 4).
Footpath 272/20/50Between points P7 and P9 (on sheet 4).
Footpath 272/13/10Within Order limits (on sheet 4).
Footpath 272/21/10Within Order limits (on sheet 4).
Station RoadBetween points T2 and T3 (on sheets 4 and 5).
Bicester RoadWithin Order limits (on sheet 6).

County of Buckinghamshire District of Aylesbury Vale

Parish of Marsh Gibbon

Footpath MGI/5/1Within Order limits (on sheet 7).
Parish of PoundonFootpath POD/2/1Between points P1, P2 and T1 (on sheet 8).
Station RoadBetween points T1, T2 and T3 (on sheets 9 and 10).
Footpath POD/3/1Between points T3 and P4 (on sheet 9).
Footpath POD/4/2Between points T8 and P1 (on sheets 9 and 10).
Main StreetBetween points T4 and T5 (on sheet 10).
Footpath POD/4/1Between points T6 and T7 (on sheet 10).
Parish of CharndonFootpath CHA/3/1Within Order limits (on sheet 9).
Bridleway CHA/1/7Within Order limits (on sheets 10 and 11).
Footpath CHA/4/1Within Order limits (on sheet 11).
Bridleway CHA/1/1Within Order limits (on sheet 11).
Footpath CHA/4/2Between point P4 and P5 (on sheet 11).
Footpath CHA/3A/1Between point P4 and T1 (on sheet 11).
Bridleway CHA/1/2Between point T2 and T3 (on sheets 11 and 13).
Bridleway CHA/1/5Between points T3 and T8 (on sheet 13).
Bridleway CHA/1/6Between points T8 and T9 (on sheet 13).
Footpath CHA/1A/1Between points T6 and T7 (on sheet 13).
Main StreetBetween points T10, T11 and T12 (on sheets 13).
School HillBetween points T11 and T13 (on sheets 13 and 77).
Parish of TwyfordBridleway TWY/1/1Within Order limits (on sheet 10).
Footpath TWY/2/3Between points P3 and T4 (on sheets 12 and 13).
Footpath TWY/3/1Between points P4, T5 and T6 (on sheets 12 and 13).
Footpath TWY/2/2Between points P3 and P4 (on sheet 12).
Footpath TWY/4/1Within Order Limits (on sheet 14).
Main StreetBetween points T1 and T2 (on sheet 14).
Parish of Steeple ClaydonBuckingham RoadBetween points T1 and T2 (on sheet 15).
Footpath SCL/1/3Within Order limits (on sheet 17).
Parishes of Steeple Claydon and Middle ClaydonQueen Catherine RoadBetween points T3, T2, P1 and P6 (on sheets 15 and 16).
Parish of Middle ClaydonFootpath MCL/9/1Between points P7, P8 and T1 (on sheet 16).
Footpath MCL/8/1Within Order limits (on sheet 17).
Footpath MCL/4/1Within Order limits (on sheet 18).
Footpath MCL/6/1Within Order limits (on sheet 18).
Footpath MCL/6/2Within Order limits (on sheet 18).
Footpath MCL/4/2Within Order limits (on sheet 18).
Sandhill RoadBetween points T1, T2 and T3 (on sheet 19).
Footpath MCL/2/1 and path not on definitive map)Between points P1 and P2 (on sheet 20).
Footpath MCL/3/1 and path not on definitive map)Between points P1 and P3 (on sheets 20 and 21).
Parishes of Middle Claydon and East ClaydonVerney RoadBetween points T3, T4, T5 and T6 (on sheets 19 and 20) and between points T7 and T8 (on sheets 20 and 21).
Parish of AddingtonFootpath ADD/13/1Between points P1 and P2 (on sheet 22).
Footpath ADD/13/2Between points P2 and P3 (on sheet 22).
Footpath ADD/12/1Between points T1 and P2 (on sheet 22).
Footpath ADD/12/2Between points P2 and T2 (on sheet 22).
Footpath ADD/11/1Between P1 and P2 (on sheet 23).
Parishes of Addington and WinslowVerney RoadBetween points T9 and T10 (on sheets 22), and between points T11, T12 and T13 (on sheets 22 and 23).
Parish of WinslowFootpath WIS/5/1Between points P2 and T1 (on sheet 23).
Furze LaneBetween points T1 and T2 (on sheet 24).
Footpath WIS/6/1Between points P4, P1 and T7 (on sheet 24).
Footpath WIS/6/2Within Order limits (on sheet 24).
Footpath WIS/6/9Between points P4 and P5
Buckingham RoadBetween points T3 and T4 (on sheet 24).
Great Horwood RoadBetween points T5 and T6 (on sheet 24 and 25).
Parishes of Winslow and Little HorwoodHorwood RoadBetween points T1, T2 and T3 (on sheets 85 and 26).
Parish of SwanbourneFootpath SWA/17/1Within Order limits (on sheets 27 and 28).
Footpath SWA/1/1Within Order limits (on sheet 28).
Footpath SWA/1/2Within Order limits (on sheet 28).
Station RoadBetween points T6 and T7 (on sheet 28).
Footpath SWA/20/1Between points P11 and P12 (on sheet 29).
Parishes of Swanbourne and MursleyStation RoadBetween points T5 and T3 (on sheets 28 and 29).
Parish of Little HorwoodFootpath LHO/27/1Between points T2 and P10 (on sheets 28 and 29).
Footpath LHO/20/1Between points P1 and P5 (on sheet 30).
Parish of MursleyFootpath MUR/19/1Between points P10 and P11 (on sheet 29).
Unnamed Road (between Mursley Road and Station Road)Between points T3 and T6 (on sheet 29).
Station Road (towards Main Street)Between points T3 and T4 (on sheets 29 and 86).
Restricted Byway MUR/18/1Between points T3 and P6 (on sheets 29 and 30).
Restricted Byway MUR/18/2Within Order limits (on sheets 30 and 31).
Footpath MUR/13/1Within Order limits (on sheet 30).
Whaddon RoadBetween points T1 and T2 (on sheet 31).
Salden LaneBetween points P3 and P1 (on sheet 32).
Restricted Byway MUR/15/1Between point P1 and T1 (on sheets 32 and 33).
Parish of Newton LongvilleRestricted Byway NLO/20/1Between points T1 and T2 (on sheets 33 and 34).
Footpath NLO/19/1 (and path not on definitive map)Between points T1 and T2 (on sheet and 37).
Footpath NLO/19/2 (and path not on definitive map)Between points T1 and T2 (on sheet and 37).
Whaddon RoadBetween points T1 and T2 (on sheet 36).
Footpath NLO/18/1Between points T6 and T7 (on sheets 37 and 38).
Bletchley RoadBletchley Road between points T1 and T2, and between points T3 and T4 (on sheet 38).

District of Aylesbury Vale

Parish of Newton Longville and

District of Milton Keynes

Parish of West Bletchley

Newton RoadNewton Road between points T4 and T5 (on sheet 38).

District of Milton Keynes

Parish of West Bletchley

Selbourne AvenueBetween points T1 and T2 (on sheet 39).
Footpath Bletchley 026Between points T1 and T2 (on sheet 39).
Footpath Bletchley 027Between points T2 and T3 (on sheets 39 and 40).
Wellington PlaceWithin Order limits (on sheet 41).
Saxon StreetBetween points T1 and T2 (on sheet 42).
Parishes of West Bletchley and Bletchley and Fenny StratfordWater Eaton RoadBetween points T1 and T2 (on sheet 41).
Footpath Bletchley 028Within Order limits (on sheet 40).
Parishes of Walton, Bow Brickhill and Woburn SandsBow Brickhill Bridleway 014Between point P1 and P4 (on sheet 44).
Parish of Woburn SandsBow Brickhill RoadBetween points T1 and T2 (on sheet 45).
Newport RoadBetween points T3 and T4 and between points T5 and T6 (on sheet 46).
Station RoadBetween points T6 and T7 (on sheet 46).
Cranfield RoadBetween points P8 and T8 (on sheet 46).
Woburn Sands Footpath 002Between points T1 and T2 (on sheet 46).
Woburn Sands Footpath 003Between points P6 and P7 (on sheet 46).

County of Bedfordshire District of Central Bedfordshire

Parish of Aspley Guise

Footpath 12 (and path not on definitive map)Between points T1 and T2 (on sheet 48).
Salford RoadBetween points T3 and T4 (on sheet 48).
Berry LaneBetween points P1, P2 and T1 (on sheet 49).
Parish of Husborne CrawleyFootpath 6 (and path not on definitive map)Between points T1 and T2 (on sheet 50).
Bedford RoadBetween points T3, T2 and T1 (on sheets 50 and 51).
Footpath 10Between points T1, P1 and P2 (on sheet 51).
Parish of BrogboroughFootpath BRG/17/10Between points P2 and P3 (on sheets 51 and 52).
Parishes of Brogborough and Husbourne CrawleyStation RoadBetween points T1 and T2 (on sheet 52).
Parish of LidlingtonStation RoadBetween points T1 and T2 (on sheet 53).
Church StreetBetween points T2 and T3 (on sheet 53).
Footpath 1 and path not on definitive mapBetween points P5 and P6 (on sheet 53).
Marston RoadBetween points P12 and P13 (on sheet 54).

District of Bedford

Parish of Stewartby

Manor RoadBetween points P1, P2 and T3 (on sheet 57).
Parish of KempstonFootpath KEU1B (FP 1), Footpath KERA1A (FP A1)Between points P1 and P2 (on sheet 58).

County of Buckinghamshire District of Aylesbury Vale

Parish of Quainton

Station RoadBetween points T1 and T2 (on sheet 60).
Parish of WaddesdonFootpath WAD/3/5Within Order limits (on sheet 61).
Footpath WAD/4/2Between points T1 and T2 (on sheet 63).
Blackgrove RoadBetween points T3 and T4 (on sheet 63).
Footpath WAD/5/3Between points T1 and T2 (on sheet 65).
Parishes of Fleet Marston and Berry FieldsA41Between points T1 and T2 (on sheet 69).
Parish of AylesburyFootpath AYL/8/1 and Footpath AYL/7/1Between points P5, P1 and P2 (on sheet 70).

County of Oxfordshire

District of Cherwell

Parish of Fringford

Fringford Footpath 9Between points T5 and T6 (on sheet 71).
Parishes of Fringford and Stratton AudleyA4421 Roman RoadBetween points T1, T2 and T3 (on sheet 71).
Unnamed Road (between A4421 Roman Road and Mill Road)Between points T1, T2 and T3 (on sheet 71).
Parish of Stratton AudleyMill RoadBetween points T5 and T4 (on sheet 72).

County of Oxfordshire

District of Cherwell

Parishes of Stratton Audley and Godington and

County of Buckinghamshire

District of Aylesbury Vale

Parish of Poundon

Unnamed Road (between Mill Road and Main Street)Between points T4 and T5 (on sheets 72 and 76).

County of Buckinghamshire

District of Aylesbury Vale

Parish of Charndon

Unnamed Road (between School Hill and Perry Hill)Between points T13 and T1 (on sheet 77).
Parish of Gawcott with LenboroughA413 London RoadBetween points T1, T2 and T3 (on sheet 78).
Unnamed Road (between Lenborough Road and A413 London Road)Between points T2 and T4 (on sheet 78).
Footpath GAW/20/1Between points T5 and T6 (on sheet 78).
Footpath GAW/14/1Between points T6 and T7 (on sheet 80).
Footpath GAW/14/2Between points T6 and T8 (on sheet 80).
Footpath GAW/16A/1Between points T9 and T10 (on sheet 80).
Parishes of Gawcott with Lenborough and PadburyUnnamed Road (between Lenborough Road and Main Street)Between points T4 and T5 (on sheets 78 and 80).
Parish of Steeple ClaydonHerd’s HillBetween points T1 and T2 (on sheets 81 and 82).
Footpath SCL/20/1Between points T6 and T7 (on sheet 82).
Footpath SCL/23/1Between points T8 and T9 (on sheet 82).
Footpath SCL/11/1Between points T9 and T10 (on sheet 82).
Footpath SCL/4/2Between points T11 and T12 (on sheet 83).
Footpath SCL/22/1Between points T13 and T14 (on sheet 83).
Footpath SCL/21/1Between points T14 and T15 (on sheet 83).
Sandhill RoadBetween points T2 and T3 (on sheets 82 and 84).
Parishes of Steeple Claydon and PadburyUnnamed Road (between Sandhill Road and Main Street)Between points T4 and T5 (on sheets 82 and 83).
Parishes of Mursley, Stewkley and Drayton ParslowB4032Between points T1 and T2 (on sheet 87).
Parish of StewkleyB4032Between points T1 and T2 (on sheet 88).
Parishes of Stewkley and Drayton ParslowBletchley RoadBetween points T2 and T3 (on sheets 88 and 91).
Parishes of Drayton Parslow and Stoke HammondDrayton RoadBetween points T1 and T2 (on sheets 92 and 93).

County of Bedfordshire

District of Central Bedfordshire

Parish of Lidlington

High StreetBetween points T1 and T2 (on sheets 94 and 95).
Lidlington Bridleway 33Between points T3 and T4 (on sheet 94).
A507Between points T3, T2 and T4 (on sheet 95).

District of Bedford

Parish of Stewartby

Manor RoadBetween points T1 and T2 (on sheet 96).

County of Buckinghamshire

District of Aylesbury Vale

Parish of Edgcott

Grendon RoadBetween points T1 and T2 (on sheet 97).
Parish of WestcottA41Between points T1 and T2 (on sheet 98).
Parishes of Westcott, Waddesdon and QuaintonUnnamed Road (between A41 and Station Road)Between points T2 and T3 (on sheets 98 and 99).
Parish of WaddesdonA41Between points T1 and T2 (on sheet 100).
Blackgrove RoadBetween points T2 and T3 (on sheet 100).

Article 16

SCHEDULE 12ACCESS TO WORKS

(1)

Area

(2)

Description of access

County of Oxfordshire

District of Cherwell

Parishes of Bicester and Launton

A4421 Charbridge Lane at a point marked on the deposited plans

A4421 Skimmingdish Lane at a point marked on the deposited plans

Parish of Launton

Bicester Road (on sheet 2) at a point marked on the deposited plans

Station Road at a point marked on the deposited plans

Bicester Road (on sheet 6) at a point marked on the deposited plans

County of Buckinghamshire

District of Aylesbury Vale

Parish of Poundon

Station Road at a point marked on the deposited plans

Main Street at a point marked on the deposited plans

Parish of TwyfordMain Street at a point marked on the deposited plans
Parishes of Steeple Claydon and Middle ClaydonQueen Catherine Road at a point marked on the deposited plans
Sandhill Road at a point marked on the deposited plans
Parishes of Middle Claydon, East Claydon and AddingtonVerney Road at a point marked on the deposited plans (on sheets 19, 20, 21 and 22)
Parish of WinslowFurze Lane at a point marked on the deposited plans
Buckingham Road at a point marked on the deposited plans
Great Horwood Road at a point marked on the deposited plans
Parish of Little HorwoodHorwood Road at a point marked on the deposited plans
Parish SwanbourneStation Road at a point marked on the deposited plans
Parish of Mursley

Station Road at a point marked on the deposited plans

Unnamed Road (between Mursley Road and Station Road) at a point marked on the deposited plans

Restricted Byway MUR/18/2 at a point marked on the deposited plans
Whaddon Road at a point marked on the deposited plans
Parish of Newton Longville

Whaddon Road at a point marked on the deposited plans

Bletchley Road at a point marked on the deposited plans

District of Milton Keynes

Parish of West Bletchley

Selbourne Avenue

Water Eaton Road at a point marked on the deposited plans

Wellington Place at a point marked on the deposited plans

Parishes of Bletchley and Fenny DraytonSaxon Street at a point marked on the deposited plans
Parish of WaltonDavenport Lea at a point marked on the deposited plans
Parish of Woburn Sands

Newport Road at a point marked on the deposited plans

Station Road at a point marked on the deposited plans

Cranfield Road at a point marked on the deposited plans

County of Bedfordshire

District of Central Bedfordshire

Parish of Aspley Guise

Salford Road at a point marked on the deposited plans

Berry Lane at a point marked on the deposited plans

Parish of Husborne CrawleyBedford Road at a point marked on the deposited plans
Parishes of Husborne Crawley and BrogboroughStation Road at a point marked on the deposited plans
Parish of LidlingtonStation Road at a point marked on the deposited plans
Marston Road at a point marked on the deposited plans

District of Bedford

Parish of Sewartby

Manor Road at a point marked on the deposited plans
Parish of KempstonChantry Road at a point marked on the deposited plans

County of Buckinghamshire

District of Aylesbury Vale

Parish of Quainton

Station Road at a point marked on the deposited plans

A41 at a point marked on the deposited plans

Parish of WaddesdonBlackgrove Road at a point marked on the deposited plans
Parish of Fleet Marston

A41 at a point marked on the deposited plans

Putlowers Drive at a point marked on the deposited plans

Parishes of Coldhardbour and AylesburyGriffin Lane at a point marked on the deposited plans

Article 25

SCHEDULE 13MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS

Compensation enactments

1.  The enactments for the time being in force with respect to compensation for the compulsory purchase of land apply with the necessary modifications as respects compensation in the case of a compulsory acquisition under this Order of a right by the creation of a new right as they apply as respects compensation on the compulsory purchase of land and interests in land.

2.—(1) Without limitation on the scope of paragraph 1, the 1961 Act has effect subject to the following modification set out in sub-paragraph (2).

(2) For section 5A(5A) (relevant valuation date) of the 1961 Act substitute—

(5A) If—

(a)the acquiring authority enters on land for the purposes of exercising a right in pursuance of a notice of entry under section 11(1) of the 1965 Act (as modified by paragraph 5(5) of Schedule 12 to the Network Rail (East West Rail) (Bicester to Bedford Improvements) Order 2020 (“the 2020 Order”);

(b)the acquiring authority is subsequently required by a determination under paragraph 12 of Schedule 2A to the 1965 Act (as substituted by paragraph 5(8) of Schedule 12 to the 2020 Order) to acquire an interest in the land; and

(c)the acquiring authority enters on and takes possession of that land,

the authority is deemed for the purposes of subsection (3)(a) to have entered on that land when it entered on that land for the purpose of exercising that right.

3.—(1) Without limitation on the scope of paragraph 1, the Land Compensation Act 1973(1) has effect subject to the modifications set out in sub-paragraph (2).

(2) In section 44(1) (compensation for injurious affection), as it applies to compensation for injurious affection under section 7 (measure of compensation in case of severance) of the 1965 Act as substituted by paragraph 5(3)—

(a)for “land is acquired or taken” substitute “a right over land is purchased”; and

(b)for “acquired or taken from him” substitute “over which the right is exercisable”.

Application of Part 1 of the 1965 Act

4.  Part 1 (compulsory purchase under Acquisition of Land Act 1946) of the 1965 Act, as applied by article 23 (application of Part 1 of the 1965 Act) to the acquisition of land under article 22 (power to acquire land), applies to the compulsory acquisition of rights under article 25(1) or (2) (power to acquire new rights)—

(a)with the modification specified in paragraph 5; and

(b)with such other modifications as may be necessary.

5.—(1) The modifications referred to in paragraph 4(a) are as follows.

(2) References in the 1965 Act to land are, in the appropriate contexts, to be read (according to the requirements of the particular context) as referring to, or as including references to—

(a)the right acquired or to be acquired; or

(b)the land over which the right is or is to be exercisable.

(3) For section 7 (measure of compensation in the case of severance) of the 1965 Act substitute—

7.  In assessing the compensation to be paid by the acquiring authority under this Act regard must be had not only to the extent (if any) to which the value of the land over which the right is to be acquired is depreciated by the acquisition of the right, but also to the damage (if any) to be sustained by the owner of the land by reason of its severance from other land of the owner, or injuriously affecting that other land by the exercise of the powers conferred by this or the special Act.

(4) The following provisions of the 1965 Act (which state the effect of a deed poll executed in various circumstances where there is no conveyance by persons with interests in the land), that is to say—

(a)section 9(4) (failure by owners to convey);

(b)paragraph 10(3) of Schedule 1 (owners under incapacity);

(c)paragraph 2(3) of Schedule 2 (absent and untraced owners); and

(d)paragraphs 2(3) and 7(2) of Schedule 4 (common land),

are modified so as to secure that, as against persons with interests in the land which are expressed to be overridden by the deed, the right which is to be compulsorily acquired is vested absolutely in the acquiring authority.

(5) Section 11(2) (powers of entry) of the 1965 Act is modified so as to secure that, where the acquiring authority has served notice to treat in respect of any right, as well as the notice of entry required by subsection (1) of that section (as it applies to a compulsory acquisition under article 23(1)), it has power, exercisable in the equivalent circumstances and subject to the equivalent conditions, to enter for the purpose of exercising that right; and sections 11A(3) (powers of entry: further notices of entry), 11B(4) (counter-notice requiring possession to be taken on specified date), 12(5) (penalty for unauthorised entry) and 13(6) (entry on warrant in the event of obstruction) of the 1965 Act are modified correspondingly.

(6) Section 20(7) (protection for interests of tenants at will etc.) of the 1965 Act applies with the modifications necessary to secure that persons with such interests in land as are mentioned in that section are compensated in a manner corresponding to that in which they would be compensated on a compulsory acquisition under this Order of that land, but taking into account only the extent (if any) of such interference with such an interest as is actually caused, or likely to be caused, by the exercise of the right in question.

(7) Section 22 (interests omitted from purchase) of the 1965 Act (as modified by article 23(7)) is modified so as to enable the acquiring authority, in circumstances corresponding to those referred to in that section, to continue to be entitled to exercise the right acquired, subject to compliance with that section as respects compensation.

(8) For Schedule 2A to the 1965 Act substitute—

SCHEDULE 2ACOUNTER-NOTICE REQUIRING PURCHASE OF LAND

Introduction

1.(1) This Schedule applies where an acquiring authority serves a notice to treat in respect of a right over the whole or part of a house, building or factory.

(2) But see article 26(3) (power to acquire subsoil or airspace only) of the Network Rail (East West Rail) (Bicester to Bedford Improvements) Order 2020, which excludes the acquisition of subsoil or airspace only from this Schedule.

2.  In this Schedule “house” includes any park or garden belonging to a house.

Counter-notice requiring purchase of land

3.  A person who is able to sell the house, building or factory (“the owner”) may serve a counter-notice requiring the authority to purchase the owner’s interest in the house, building or factory.

4.  A counter-notice under paragraph 3 must be served within the period of 28 days beginning with the day on which the notice to treat was served.

Response to counter-notice

5.  On receiving a counter-notice, the authority must decide whether to—

(a)withdraw the notice to treat,

(b)accept the counter-notice, or

(c)refer the counter-notice to the Upper Tribunal.

6.  The authority must serve notice of its decision on the owner within the period of 3 months beginning with the day on which the counter-notice is served (“the decision period”).

7.  If the authority decides to refer the counter-notice to the Upper Tribunal it must do so within the decision period.

8.  If the authority does not serve notice of a decision within the decision period it is to be treated as if it had served notice of a decision to withdraw the notice to treat at the end of that period.

9.  If the authority serve notice of a decision to accept the counter-notice, the compulsory purchase order and the notice to treat are to have effect as if they included the owner’s interest in the house, building or factory.

Determination by Upper Tribunal

10.  On a referral under paragraph 7, the Upper Tribunal must determine whether the acquisition of the right would—

(a)in the case of a house, building or factory, cause material detriment to the house, building or factory, or

(b)in the case of a park or garden, seriously affect the amenity or convenience of the house to which the park or garden belongs.

11.  In making its determination, the Upper Tribunal must take into account—

(a)the effect of the acquisition of the right,

(b)the proposed use of the right to be acquired, and

(c)if the right is proposed to be acquired for works or other purposes extending to other land, the effect of the whole of the works and the use of the other land.

12.  If the Upper Tribunal determines that the acquisition of the right would have either of the consequences described in paragraph 10, it must determine how much of the house, building or factory the acquiring authority ought to be required to take.

13.  If the Upper Tribunal determines that the acquiring authority ought to be required to take some or all of the house, building or factory, the compulsory purchase order and the notice to treat are to have effect as if they included the owner’s interest in that land.

14.(1) If the Upper Tribunal determines that the acquiring authority ought to be required to take some or all of the house, building or factory, the authority may at any time within the period of 6 weeks beginning with the day on which the Upper Tribunal makes its determination withdraw the notice to treat in relation to that land.

(2) If the acquiring authority withdraws the notice to treat under this paragraph they must pay the person on whom the notice was served compensation for any loss or expense caused by the giving and withdrawal of the notice.

(3) Any dispute as to the compensation is to be determined by the Upper Tribunal.

Articles 29 and 30

SCHEDULE 14TEMPORARY USE OF LAND FOR ACCESS

(1)

Area

(2)

Number of land shown on the deposited plans

In the County of Oxfordshire

In the District of Cherwell

0033a, 0037
0162a, 0162b

In the County of Buckinghamshire

In the District of Aylesbury Vale

0847, 0856, 0860
0914c, 0914e, 0933
1393a, 1394, 1395
1494, 1498

In the County of Buckinghamshire

In the District of Milton Keynes

1060, 1061, 1062
1041, 1042

Articles 8, 32and41

SCHEDULE 15PROVISIONS RELATING TO STATUTORY UNDERTAKERS ETC.

Apparatus of statutory undertakers etc. on land acquired

1.—(1) Sections 271 to 274(8) (power to extinguish rights of statutory undertakers etc, and power of statutory undertakers etc. to remove or re-site apparatus) of the 1990 Act apply in relation to any land acquired or appropriated by Network Rail under this Order subject to the following provisions of this paragraph; and all such other provisions of that Act as apply for the purposes of those provisions (including sections 275 to 278, which contain provisions consequential on the extinguishment of any rights under sections 271 and 272, and sections 279(2) to (4), 280 and 282(9), which provide for the payment of compensation) have effect accordingly.

(2) In the provisions of the 1990 Act, as applied by sub-paragraph (1), references to the appropriate Minister are references to the Secretary of State.

(3) Where any apparatus of public utility undertakers or of a public communications provider is removed in pursuance of a notice or order given or made under section 271, 272 or 273 of the 1990 Act, as applied by sub-paragraph (1), any person who is the owner or occupier of premises to which a supply was given from that apparatus is entitled to recover from Network Rail compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of effecting a connection between the premises and any other apparatus from which a supply is given.

(4) Sub-paragraph (3) does not apply in the case of the removal of a public sewer but where such a sewer is removed in pursuance of such a notice or order as is mentioned in that sub-paragraph, any person who is—

(a)the owner or occupier of premises the drains of which communicated with that sewer; or

(b)the owner of a private sewer which communicated with that sewer,

is entitled to recover from Network Rail compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of making the drain or sewer belonging to that person communicate with any other public sewer or with a private sewerage disposal plant.

(5) The provisions of the 1990 Act mentioned in sub-paragraph (1), as applied by that sub-paragraph, do not have effect in relation to apparatus as respects which paragraph 2, or Part 3 of the 1991 Act, applies.

(6) In this paragraph—

“public communications provider” has the same meaning as in section 151(1) of the 2003 Act; and

“public utility undertakers” has the same meaning as in the 1980 Act(10).

Apparatus of statutory undertakers etc. in stopped up streets

2.—(1) Where a street is stopped up under article 8 (closure of road level crossings), 9 (replacement and closure of footpath level crossings) or 13 (stopping up of streets) any statutory utility whose apparatus is under, in, upon, along or across the street has the same powers and rights in respect of that apparatus, subject to the provisions of this paragraph, as if this Order had not been made.

(2) Where a street is stopped up under article 8, 9 or 13 any statutory utility whose apparatus is under, in, upon, over, along or across the street may, and if reasonably requested to do so by Network Rail must—

(a)remove the apparatus and place it or other apparatus provided in substitution for it in such other position as the utility may reasonably determine and have power to place it; or

(b)provide other apparatus in substitution for the existing apparatus and place it in that other position.

(3) Subject to the following provisions of this paragraph, Network Rail must pay to any statutory utility an amount equal to the cost reasonably incurred by the utility in or in connection with—

(a)the execution of the relocation works required in consequence of the stopping up of the street; and

(b)the doing of any other work or thing rendered necessary by the execution of the relocation works.

(4) If in the course of the execution of relocation works under sub-paragraph (2)—

(a)apparatus of a better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus; or

(b)apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was,

and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by Network Rail, or, in default of agreement, is not determined by arbitration to be necessary, then, if it involves cost in the execution of the relocation works exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this paragraph would be payable to the statutory utility by virtue of sub-paragraph (3) is to be reduced by the amount of that excess.

(5) For the purposes of sub-paragraph (4)—

(a)an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and

(b)where the provision of a joint in a cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.

(6) An amount which apart from this sub-paragraph would be payable to a statutory utility in respect of works by virtue of sub-paragraph (3) (and having regard, where relevant, to sub-paragraph (4)) must, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on the utility any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit.

(7) Sub-paragraphs (3) to (6) do not apply where the authorised works constitute major transport works for the purposes of Part 3 (street works in England and Wales) of the 1991 Act, but instead—

(a)the allowable costs of the relocation works are to be determined in accordance with section 85 (sharing of cost of necessary measures) of that Act and any regulations for the time being having effect under that section; and

(b)the allowable costs are to be borne by Network Rail and the statutory utility in such proportions as may be prescribed by any such regulations.

(8) In this paragraph—

“apparatus” has the same meaning as in Part 3 of the 1991 Act;

“relocation works” means work executed, or apparatus provided, under sub-paragraph (2); and

“statutory utility” means a statutory undertaker for the purposes of the 1980 Act or a public communications provider as defined in paragraph 1(6).

Article 44

SCHEDULE 16PROTECTIVE PROVISIONS

PART 1FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERS

Application

1.  For the protection of the undertakers referred to in this Part of this Schedule the following provisions have effect unless otherwise agreed in writing between Network Rail and the undertaker concerned.

2.  The provisions of paragraph 1 of Schedule 15 (provisions relating to statutory undertakers etc.), in so far as they relate to the removal of apparatus, do not apply in relation to apparatus to which this Part of this Schedule applies.

3.  This Part of this Schedule does not apply to apparatus in respect of which the relations between Network Rail and the undertaker are regulated by the provisions of Part 3 of the 1991 Act.

Interpretation

4.  In this Part of this Schedule—

“alternative apparatus” means alternative apparatus adequate to enable the undertaker in question to fulfil its statutory functions in a manner no less efficient than previously;

“apparatus” means—

(a)

in the case of an electricity undertaker, electric lines or electrical plant (as defined in the Electricity Act 1989(11), belonging to or maintained by that undertaker;

(b)

in the case of a gas undertaker, any mains, pipes or other apparatus belonging to or maintained by a gas transporter for the purposes of gas supply;

(c)

in the case of a water undertaker, mains, pipes or other apparatus belonging to or maintained by that undertaker for the purposes of water supply; and

(d)

in the case of a sewerage undertaker—

(i)

any drain or works vested in the undertaker under the Water Industry Act 1991; and

(ii)

any sewer which is so vested or is the subject of a notice of intention to adopt given under section 102(4) of that Act or an agreement to adopt made under section 104 of that Act,

and includes a sludge main, disposal main (within the meaning of section 219 of that Act) or sewer outfall and any manholes, ventilating shafts, pumps or other accessories forming part of any such sewer, drain or works, and any structure in which apparatus is or is to be lodged or which gives or will give access to apparatus;

“functions” includes powers and duties;

“in”, in a context referring to apparatus or alternative apparatus in land, includes a reference to apparatus or alternative apparatus under, over or upon land;

“plans” includes sections, drawings, specifications and method statements; and

“undertaker” means—

(e)

any licence holder within the meaning of Part 1 of the Electricity Act 1989;

(f)

a gas transporter within the meaning of Part 1 of the Gas Act 1986(12);

(g)

a water undertaker within the meaning of the Water Industry Act 1991; and

(h)

a sewerage undertaker within the meaning of Part 1 of the Water Industry Act 1991,

for the area of the authorised works, and in relation to any apparatus, means the undertaker to whom it belongs or by whom it is maintained.

Acquisition of apparatus

5.  Regardless of any provision in this Order or anything shown on the deposited plans, Network Rail must not acquire any apparatus otherwise than by agreement.

Alternative apparatus

6.—(1) If, in the exercise of the powers conferred by this Order, Network Rail acquires any interest in any land in which any apparatus is placed, that apparatus must not be removed under this Part of this Schedule and any right of an undertaker to maintain that apparatus in that land must not be extinguished until alternative apparatus has been constructed and is in operation to the reasonable satisfaction of the undertaker in question.

(2) If, for the purpose of executing any works in, on, under or over any land purchased, held, appropriated or used under this Order, Network Rail requires the removal of any apparatus placed in that land, it must give to the undertaker in question written notice of that requirement, together with a plan and section of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed.

(3) Any alternative apparatus to be constructed in land of Network Rail under this Part of this Schedule is to be constructed in such manner and in such line or situation as may be agreed between the undertaker in question and Network Rail within 21 days of the service of a notice under sub-paragraph (2), or in default of such agreement settled by arbitration in accordance with article 46 (arbitration).

(4) In any case where alternative apparatus is to be provided or constructed under sub-paragraph (2), or if in consequence of the exercise of any of the powers conferred by this Order an undertaker reasonably needs to remove any of its apparatus, Network Rail must, subject to sub-paragraph (5), afford to the undertaker the necessary facilities and rights for the construction of alternative apparatus in other land of Network Rail and subsequently for the maintenance of that apparatus.

(5) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of Network Rail, or Network Rail is unable to afford such facilities and rights as are mentioned in sub-paragraph (4), in the land in which the alternative apparatus or part of such apparatus is to be constructed, the undertaker in question must, on receipt of a written notice to that effect from Network Rail, as soon as reasonably possible use its best endeavours to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed.

(6) The undertaker in question must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration in accordance with article 46, and after the grant to the undertaker of any such facilities and rights as are referred to in sub-paragraph (4) or (5), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by Network Rail to be removed under the provisions of this Part of this Schedule.

(7) Regardless of anything in sub-paragraph (6), if Network Rail gives notice in writing to the undertaker in question that it desires itself to execute any work, or part of any work in connection with the construction or removal of apparatus in any land of Network Rail, that work, instead of being executed by the undertaker, must be executed by Network Rail without unnecessary delay under the superintendence, if given, and to the reasonable satisfaction of the undertaker.

(8) Nothing in sub-paragraph (7) authorises Network Rail to execute the placing, installation, bedding, packing, removal, connection or disconnection of any apparatus, or execute any filling around the apparatus (where the apparatus is laid in a trench) within 300 millimetres of the apparatus.

7.—(1) Where, in accordance with the provisions of this Part of this Schedule, Network Rail affords to an undertaker facilities and rights for the construction and maintenance in land of Network Rail of alternative apparatus in substitution for apparatus to be removed, those facilities and rights are to be granted upon such terms and conditions as may be agreed between Network Rail and the undertaker in question or in default of agreement settled by arbitration in accordance with article 46 (arbitration).

(2) In settling those terms and conditions in respect of alternative apparatus to be constructed in or along any railway of Network Rail, the arbitrator must—

(a)give effect to all reasonable requirements of Network Rail for ensuring the safety and efficient operation of the railway and for securing any subsequent alterations or adaptations of the alternative apparatus which may be required to prevent interference with any proposed works of Network Rail or the traffic on the railway; and

(b)so far as it may be reasonable and practicable to do so in the circumstances of the particular case, give effect to the terms and conditions, if any, applicable to the apparatus constructed in or along the railway for which the alternative apparatus is to be substituted.

(3) If the facilities and rights to be afforded by Network Rail in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the arbitrator less favourable on the whole to the undertaker in question than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the arbitrator must make such provision for the payment of compensation by Network Rail to that undertaker as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.

Existing apparatus: protection and access

8.—(1) Not less than 28 days before starting the execution of any of the authorised works that are near to, or will or may affect, any apparatus the removal of which has not been required by Network Rail under paragraph 6(2), Network Rail must submit to the undertaker in question a plan, section and description of the works to be executed.

(2) Those works are to be executed only in accordance with the plan, section and description submitted under sub-paragraph (1) and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (3) by the undertaker for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and an officer of the undertaker is entitled to watch and inspect the execution of those works.

(3) Any requirements made by an undertaker under sub-paragraph (2) must be made within a period of 21 days beginning with the date on which a plan, section and description under sub-paragraph (1) are submitted to it.

(4) If an undertaker in accordance with sub-paragraph (3) and in consequence of the works proposed by Network Rail, reasonably requires the removal of any apparatus and gives written notice to Network Rail of that requirement, paragraphs 1 to 7 apply as if the removal of the apparatus had been required by Network Rail under paragraph 6(2).

(5) Nothing in this paragraph precludes Network Rail from submitting at any time or from time to time, but in no case less than 28 days before commencing the execution of any works, a new plan, section and description instead of the plan, section and description previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan, section and description.

(6) Network Rail is not required to comply with sub-paragraph (1) in a case of emergency but in that case it must give to the undertaker in question notice as soon as is reasonably practicable and a plan, section and description of those works as soon as reasonably practicable subsequently and must comply with sub-paragraph (2) in so far as is reasonably practicable in the circumstances.

Expenses

9.—(1) Subject to the following provisions of this paragraph, Network Rail must repay to an undertaker the reasonable expenses incurred by that undertaker in, or in connection with, the inspection, removal, alteration or protection of any apparatus or the construction of any new apparatus (including costs or compensation payable in connection with the acquisition of land for that purpose) which may be required in consequence of the execution of any of the authorised works.

(2) The value of any apparatus removed under the provisions of this Part of this Schedule (other than apparatus that is re-used as alternative apparatus) is to be deducted from any sum payable under sub-paragraph (1), that value being calculated after removal.

(3) If in accordance with the provisions of this Part of this Schedule—

(a)apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions except where this has been solely due to using the nearest currently available type; or

(b)apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was,

and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by Network Rail or, in default of agreement, is not determined by arbitration in accordance with article 46 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to the undertaker in question by virtue of sub-paragraph (1) is to be reduced by the amount of that excess.

(4) For the purposes of sub-paragraph (3)—

(a)an extension of apparatus to a length greater than the length of existing apparatus must not be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and

(b)where the provision of a joint in a cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole must be treated as if it also had been agreed or had been so determined.

(5) An amount which apart from this sub-paragraph would be payable to an undertaker in respect of works under sub-paragraph (1) must, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on the undertaker any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit.

(6) Any dispute as to whether a financial benefit is conferred in accordance with sub-paragraph (5) or as to the amount of such financial benefit which cannot be agreed is to be determined in accordance with article 46 (arbitration).

Damage to apparatus: costs, losses, etc.

10.—(1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any of the authorised works any damage is caused to any apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works) or property of an undertaker or there is any interruption in any service provided or in the supply of any goods, by any undertaker Network Rail must—

(a)bear and pay the cost reasonably incurred by that undertaker in making good such damage or restoring the supply; and

(b)make reasonable compensation to that undertaker for any other expenses, loss, damages, penalty or costs incurred by the undertaker,

by reason or in consequence of any such damage or interruption.

(2) Nothing in sub-paragraph (1) imposes any liability on Network Rail with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of an undertaker, its officers, servants, contractors or agents.

(3) An undertaker must give Network Rail reasonable notice of any such claim or demand and no settlement or compromise is to be made without the consent of Network Rail which, if it withholds such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.

Enactments and agreements

11.  Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between Network Rail and an undertaker in respect of any apparatus laid or erected in land belonging to Network Rail on the date on which this Order is made.

PART 2FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS

12.—(1) For the protection of any operator, the following provisions have effect, unless otherwise agreed in writing between Network Rail and the operator.

(2) In this Part of this Schedule—

“infrastructure system” has the same meaning as in the electronic communications code and references to providing an infrastructure system are to be construed in accordance with paragraph 7(2) of that code;

“electronic communications apparatus” has the same meaning as in the electronic communications code;

“the electronic communications code” has the same meaning as in Chapter 1 of Part 2 of the 2003 Act(13);

“electronic communications code network” means—

(a)

so much of an electronic communications network or infrastructure system provided by an electronic communications code operator as is not excluded from the application of the electronic communications code by a direction under section 106 of the 2003 Act; and

(b)

an electronic communications network which the Secretary of State is providing or proposing to provide;

“electronic communications code operator” means a person in whose case the electronic communications code is applied by a direction under section 106 of the 2003 Act; and

“operator” means the operator of an electronic communications code network.

13.—(1) Subject to sub-paragraphs (2) to (4), if as the result of the authorised works or their construction, or of any subsidence resulting from any of those works—

(a)any damage is caused to any electronic communications apparatus belonging to an operator (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works), or other property of an operator; or

(b)there is any interruption in the supply of the service provided by an operator,

Network Rail must bear and pay the cost reasonably incurred by the operator in making good such damage or restoring the supply and must—

(i)make reasonable compensation to an operator for loss sustained by it; and

(ii)indemnify an operator against claims, demands, proceedings, costs, damages and expenses which may be made or taken against, or recovered from, or incurred by, an operator by reason, or in consequence, of any such damage or interruption.

(2) Nothing in sub-paragraph (1) imposes any liability on Network Rail with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of an operator, its officers, servants, contractors or agents.

(3) The operator must give Network Rail reasonable notice of any such claim or demand and no settlement or compromise of the claim or demand may be made without the consent of Network Rail which, if it withholds such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.

(4) Any difference arising between Network Rail and the operator under this paragraph is to be referred to and settled by arbitration under article 46 (arbitration).

14.  This Part of this Schedule does not apply to—

(a)any apparatus in respect of which the relations between Network Rail and an operator are regulated by the provisions of Part 3 of the 1991 Act; or

(b)any damage, or any interruption, caused by electro-magnetic interference arising from the construction or use of the authorised works.

15.  Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between Network Rail and an operator in respect of any apparatus laid or erected in land belonging to Network Rail on the date on which this Order is made.

PART 3FOR THE PROTECTION OF DRAINAGE AUTHORITIES AND THE ENVIRONMENT AGENCY

16.—(1) The following provisions of this Part of this Schedule apply for the protection of the drainage authority unless otherwise agreed in writing between Network Rail and the drainage authority.

(2) In this Part of this Schedule—

“the Agency” means the Environment Agency;

“a category 1 specified work” means so much of any permanent or temporary work or operation authorised by this Order (which includes, for the avoidance of doubt, any dredging and any geotechnical investigations that may be undertaken) as consists of—

(a)

erecting any structure (whether temporary or permanent) in, over or under a main river if the work is likely to affect any drainage work which is or includes a main river or the volumetric rate of flow of water in or flowing to or from any main river;

(b)

the carrying out of any work or alteration or repair of any structure (whether temporary or permanent) in, over or under a main river if the work is likely to affect the flow of water in the main river or to affect any drainage work; or

(c)

any work or operation that is in, on, under, over or within 16 metres of a drainage work which is or includes a main river or is otherwise likely to affect any such drainage work or the volumetric rate of flow of water in or flowing to or from any drainage work.

“a category 2 specified work” means any of the following—

(d)

erecting any mill dam, weir or other like obstruction to the flow of any ordinary watercourse, or raising or otherwise altering any such obstruction;

(e)

erecting a culvert in any ordinary watercourse;

(f)

altering a culvert in a manner that would be likely to affect the flow of any ordinary watercourse; or

(g)

altering, removing or replacing a structure or feature designated by a local drainage authority under Schedule 1 to the Flood and Water Management Act 2010(14);

“construction” includes execution, placing, altering, replacing, relaying, removal and carrying out excavations in relation to a work, and “construct” and “constructed” are construed accordingly;

“the drainage authority” means—

(h)

in relation to a category 1 specified work, the Agency;

(i)

in relation to a category 2 specified work, the drainage board concerned within the meaning of section 23 of the Land Drainage Act 1991(15).

“drainage work” means any watercourse and includes any land which provides or is expected to provide flood storage capacity for any watercourse and any bank, wall, embankment or other structure, or any appliance, constructed or used for land drainage, flood defence or tidal monitoring;

“the fishery” means any waters containing fish and fish in, such waters and the spawn, habitat or food of such fish;

“a main river” and “ordinary watercourse” have the meanings given by respectively the Water Resources Act 1991 and the Land Drainage Act 1991;

“plans” includes sections, drawings, specifications and method statements;

“specified work” means a category 1 specified work or a category 2 specified work.

17.—(1) Before beginning to construct any specified work, Network Rail must submit to the drainage authority plans of the specified work and such further particulars available to it as the drainage authority may within 28 days of the receipt of the plans reasonably require.

(2) Any such specified work must not be constructed except in accordance with such plans as may be approved in writing by the drainage authority, or determined under article 46 (arbitration).

(3) Any approval of the drainage authority required under this paragraph—

(a)must not be unreasonably withheld;

(b)is deemed to have been given if it is neither given nor refused within 2 months of the receipt of the plans for approval or where further particulars are submitted under sub-paragraph (1) within 2 months of the submission of those particulars, and, in the case of a refusal, accompanied by a statement of the grounds of refusal; and

(c)may be given subject to such reasonable requirements as the drainage authority may make for the protection of any drainage work, fishery, water resources, or for the prevention of flooding or pollution or in the discharge of its environmental duties.

(4) The drainage authority must use its reasonable endeavours to respond to the submission of any plans before the expiration of the period mentioned in sub-paragraph (3)(b).

18.  Without limitation on the scope of paragraph 17, the requirements which the drainage authority may make under that paragraph include conditions requiring Network Rail at its own expense to construct such protective works, whether temporary or permanent, before or during the construction of the specified works (including the provision of flood banks, walls or embankments or other new works and the strengthening, repair or renewal of existing banks, walls or embankments) as are reasonably necessary—

(a)to safeguard any drainage work against damage; or

(b)to secure that its efficiency for flood defence purposes is not impaired and that the risk of flooding is not otherwise increased,

by reason of any specified work.

19.—(1) Subject to sub-paragraph (2), any specified work, and all protective works required by the drainage authority under paragraph 18, must be constructed—

(a)without unnecessary delay in accordance with the plans approved or settled under this Part of this Schedule; and

(b)to the reasonable satisfaction of the drainage authority,

and an officer of the drainage authority is entitled to watch and inspect the construction of such works.

(2) Network Rail must give to the drainage authority not less than 14 days’ notice in writing of its intention to commence construction of any specified work and notice in writing of its completion not later than 7 days after the date on which it is completed.

(3) If any part of a specified work or any protective work required by the drainage authority is constructed otherwise than in accordance with the requirements of this Schedule, the drainage authority may by notice in writing require Network Rail at Network Rail’s own expense to comply with the requirements of this Part of this Schedule or (if Network Rail so elects and the drainage authority in writing consents, such consent not to be unreasonably withheld or delayed) to remove, alter or pull down the work and, where removal is required, to restore the site to its former condition to such extent and within such limits as the drainage authority reasonably requires.

(4) Subject to sub-paragraph (6) and paragraph 23, if within a reasonable period, being not less than 28 days from the date when a notice under sub-paragraph (3) is served upon Network Rail, it has failed to begin taking steps to comply with the requirements of the notice and subsequently to make reasonably expeditious progress towards their implementation, the drainage authority may execute the works specified in the notice and any expenditure incurred by it in so doing is recoverable from Network Rail.

(5) In the event of any dispute as to whether sub-paragraph (3) is properly applicable to any work in respect of which notice has been served under that sub-paragraph, or as to the reasonableness of any requirement of such a notice, the drainage authority must not except in an emergency exercise the powers conferred by sub-paragraph (4) until the dispute has been finally determined.

(6) If by reason of construction of the specified work the Agency’s access to flood defences or equipment maintained for flood defence purposes is materially obstructed, Network Rail must provide such alternative means of access to allow the Agency to maintain the flood defence or use the equipment no less effectively than before the obstruction.

20.—(1) Subject to sub-paragraph (5) Network Rail must from the commencement of the construction of the specified works maintain in good repair and condition and free from obstruction any drainage work which is situated within the limits of deviation and on land held by Network Rail for the purposes of or in connection with the specified works, whether or not the drainage work is constructed under the powers conferred by this Order or is already in existence.

(2) If any such drainage work which Network Rail is liable to maintain is not maintained to the reasonable satisfaction of the drainage authority, the drainage authority may by notice in writing require Network Rail to repair and restore the work, or any part of such work, or (if Network Rail so elects and the drainage authority in writing consents, such consent not to be unreasonably withheld or delayed), to remove the work and restore the site to its former condition, to such extent and within such limits as the drainage authority reasonably requires.

(3) Subject to sub-paragraph (5) and paragraph 23, if, within a reasonable period being not less than 28 days beginning with the date on which a notice in respect of any drainage work is served under sub-paragraph (2) on Network Rail, Network Rail has failed to begin taking steps to comply with the reasonable requirements of the notice and has not subsequently made reasonably expeditious progress towards their implementation, the drainage authority may do what is necessary for such compliance and may recover any expenditure incurred by it in so doing from Network Rail.

(4) In the event of any dispute as to the reasonableness of any requirement of a notice served under sub-paragraph (2), the drainage authority must not except in a case of an emergency exercise the powers conferred by sub-paragraph (3) until the dispute has been finally determined.

(5) This paragraph does not apply to—

(a)drainage works which are vested in the drainage authority, or which the drainage authority or another person is liable to maintain and is not precluded by the powers of the Order from doing so; and

(b)any obstruction of a drainage work for the purpose of a work or operation authorised by this Order and carried out in accordance with the provisions of this Part of this Schedule.

21.  Subject to paragraph 23, if by reason of the construction of any specified work or of the failure of any such work the efficiency of any drainage work for flood defence purposes is impaired, or that drainage work is otherwise damaged, such impairment or damage must be made good by Network Rail to the reasonable satisfaction of the drainage authority and if Network Rail fails to do so, the drainage authority may make good the same and recover from Network Rail the expense incurred by it in so doing.

22.—(1) Network Rail must take all such measures as may be reasonably practicable to prevent any interruption of the free passage of fish in the fishery during the construction of any specified work.

(2) If by reason of—

(a)the construction of any specified work; or

(b)the failure of any such work,

damage to a fishery is caused, or the Agency has reason to expect that such damage may be caused, the drainage authority may serve notice on Network Rail requiring it to take such steps as may be reasonably practicable to make good the damage, or, as the case may be, to protect the fishery against such damage.

(3) Subject to paragraph 23, if within such time as may be reasonably practicable for that purpose after the receipt of written notice from the Agency of any damage or expected damage to a fishery, Network Rail fails to take such steps as are described in sub-paragraph (2), the drainage authority may take those steps and may recover from Network Rail the expense reasonably incurred by it in doing so.

(4) Subject to paragraph 23, in any case where immediate action by the Agency is reasonably required in order to secure that the risk of damage to the fishery is avoided or reduced, the drainage authority may take such steps as are reasonable for the purpose, and may recover from Network Rail the reasonable cost of so doing provided that notice specifying those steps is served on Network Rail as soon as reasonably practicable after the Agency has taken, or commenced to take, the steps specified in the notice.

23.  Nothing in paragraphs 19(4), 20(3), 21, 22(3) and (4) authorises the drainage authority to execute works on or affecting an operational railway forming part of Network Rail’s network without the prior consent in writing of Network Rail such consent not to be unreasonably withheld or delayed.

24.  Network Rail must indemnify the drainage authority in respect of all costs, charges and expenses which the drainage authority may reasonably incur or have to pay or which it may sustain—

(a)in the examination or approval of plans under this Part of this Schedule; and

(b)in the inspection of the construction of the specified works or any protective works required by the drainage authority under this Part of this Schedule.

25.—(1) Without affecting the other provisions of this Part of this Schedule, Network Rail must indemnify the drainage authority from all claims, demands, proceedings, costs, charges, penalties, damages, expenses and losses, which may be made or taken against, recovered from, or incurred by, the drainage authority by reason of—

(a)any damage to any drainage work so as to impair its efficiency for the purposes of flood defence;

(b)any damage to the fishery;

(c)any raising or lowering of the water table in land adjoining the authorised works or any sewers, drains and watercourses;

(d)any flooding or increased flooding of any such lands; or

(e)inadequate water quality in any watercourse or other surface waters or in any groundwater,

which is caused by the construction of any of the specified works or any act or omission of Network Rail, its contractors, agents or employees whilst engaged upon the work.

(2) The drainage authority must give to Network Rail reasonable notice of any such claim or demand and no settlement or compromise may be made without the agreement of Network Rail which agreement must not be unreasonably withheld or delayed.

26.  The fact that any work or thing has been executed or done by Network Rail in accordance with plans approved by the drainage authority, or to the drainage authority’s satisfaction, or in accordance with any directions or award of an arbitrator, does not relieve Network Rail from any liability under the provisions of this Part of this Schedule.

(2)

Section 11 was amended by section 34(1) of, and Schedule 4 to, the Acquisition of Land Act 1981 (c. 67), section 3 of, and Part 1 of Schedule 1 to, the Housing (Consequential Provisions) Act 1985 (c. 71), section 14 of, and paragraph 12(1) of Schedule 5 to, the Church of England (Miscellaneous Provisions) Measure 2006 (No. 1), sections 186(2), 187(2) and 188 of, and paragraph 6 of Schedule 14 and paragraph 3 of Schedule 16 to, the Housing and Planning Act 2016 (c. 22) and S.I. 2009/1307.

(3)

Section 11A was inserted by section 186(3) of the Housing and Planning Act 2016.

(4)

Section 11B was inserted by section 187(2) of the Housing and Planning Act 2016.

(5)

Section 12 was amended by section 56(2) of, and Part 1 of Schedule 9 to, the Courts Act 1971 (c. 23) and paragraph 4 of Schedule 16 to the Housing and Planning Act 2016.

(6)

Section 13 was amended by sections 62(3), 139(4) to (9) and 146 of, and paragraphs 27 and 28 of Schedule 13 and Part 3 of Schedule 23 to, the Tribunals Courts and Enforcement Act 2007 (c. 15).

(7)

Section 20 was amended by paragraph 4 of Schedule 15 to the Planning and Compensation Act 1991 (c. 34) and S.I. 2009/1307.

(8)

Sections 272 to 274 were amended by paragraph 103(1) and (2) of Schedule 17 to the Communications Act 2003 (c. 21).

(9)

Section 279(3) was amended by paragraph 103(1) and (2), and section 280 was amended by paragraph 104, of Schedule 17 to the Communications Act 2003. Sections 280 and 282 were amended by S.I. 2009/1307.

(10)

The definition of “public utility undertakers” was amended by section 190(3) of, and Part 1 of Schedule 27 to, the Water Act 1989 (c. 15) and section 112(4) of, and Schedule 18 to, the Electricity Act 1989 (c. 29).

(13)

See section 106.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources